IDAMME2

DESIGN AND MANUFACTURING OF AN INNOVATIVE CRYOGENIC WIND TUNNEL MODEL WITH MOTORIZED EMPENNAGE

 Coordinatore VALLET SAS 

 Organization address address: LE HANOY ZONE ARTISANALE
city: RUGLES
postcode: 27250

contact info
Titolo: Mr.
Nome: Joël
Cognome: Lecomte
Email: send email
Telefono: 33630869917

 Nazionalità Coordinatore France [FR]
 Totale costo 1˙795˙000 €
 EC contributo 1˙346˙250 €
 Programma FP7-JTI
Specific Programme "Cooperation": Joint Technology Initiatives
 Code Call SP1-JTI-CS-2012-01
 Funding Scheme JTI-CS
 Anno di inizio 2013
 Periodo (anno-mese-giorno) 2013-01-02   -   2014-01-01

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    VALLET SAS

 Organization address address: LE HANOY ZONE ARTISANALE
city: RUGLES
postcode: 27250

contact info
Titolo: Mr.
Nome: Joël
Cognome: Lecomte
Email: send email
Telefono: 33630869917

FR (RUGLES) coordinator 1˙346˙250.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

models    quality    model    surface    standard    edge    techniques    cutting    technologies    tunnel    edm    innovative    vallet    we    pressure    appropriate    wind    cma    manufacturing   

 Obiettivo del progetto (Objective)

'Since 40 years, our company “VALLET- CMA” showed our capacity to build models by taking into account the specific requirements of this type of activity. We always research innovation and appropriate technologies in our design. The standard design tool used at VALLET- CMA is CATIA V5 (Rev: 19 as required), utilizing the associated FEA package for all stress calculations. The manufacture of models for a “Cryogenic Wind Tunnel” requires higher surface quality requirements. We have a knowhow to obtain this surface quality required. (We manufactured similar models for the ETW wind tunnel)

We will make best use of state of the art rapid manufacturing processes where appropriate, including the various additive layer manufacturing processes (laser deposition). These techniques present the opportunity to reduce model costs and lead times, with the added advantage of lower raw material usage and the associated reductions in energy usage and waste.

VALLET - CMA actively work with partners outside of this CfP to develop model manufacturing techniques using these novel processes.

Our priorities are:

- The respect of surface quality requirements with different technologies (High speed cutting, electric discharge machining, chemical cutting, …)

- An innovate design of the various leading edge components to be dependable, quick and faithful

- Using innovative technologies (long drill EDM) for the integration of the standard pressure sensors without perturbations of external forms.

In the particular context of this project, the implementation of a large number of pressure probes should not disturb the surface quality. To this end, we can combine multiple technologies in innovative ways: Drilling deep-EDM allows small diameter (1mm) to great depths with a very high quality of rectitude. This will come as close as the thin zones (trailing edge) to create paths for the transfer of internal pressure information. (Cables, tubes)'

Altri progetti dello stesso programma (FP7-JTI)

MAS DE NADA (2012)

MAS DE NADA: Modeling and Advanced Software Development for Electrical Networks in Aeronautical Domain Analysis

Read More  

PRESTO (2011)

ImProvements of industrial Real Time Embedded SysTems devel0pment process

Read More  

HAWL (2013)

Large scale demonstration of substitution of battery electric forklifts by hydrogen fuel cell forklifts in logistics warehouses

Read More