Coordinatore | Advanced Insulation Systems Ltd
Organization address
address: QUEDGELEY WEST BUSINESS PARK - BRISTOL ROAD contact info |
Nazionalità Coordinatore | United Kingdom [UK] |
Totale costo | 1˙469˙297 € |
EC contributo | 1˙142˙635 € |
Programma | FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs |
Code Call | FP7-SME-2013 |
Funding Scheme | BSG-SME |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-10-01 - 2015-09-30 |
# | ||||
---|---|---|---|---|
1 |
Advanced Insulation Systems Ltd
Organization address
address: QUEDGELEY WEST BUSINESS PARK - BRISTOL ROAD contact info |
UK (GLOUCESTER) | coordinator | 369˙792.00 |
2 |
ATARD SAVUNMA VE HAVACILIK SANAYI ILERI TEKNOLOJI UYGULAMALARI ARASTIRMA VE GELISTIRME A.S.
Organization address
address: HADIMKOY SAN BIR 5 BOLGE 12 CAD NO 106 BOLUM 2/3 BUYUKCEKMECE contact info |
TR (ISTANBUL) | participant | 248˙924.00 |
3 |
ALSITEK LIMITED
Organization address
address: MAXWELL ROAD ALFRIC SQUARE 25 contact info |
UK (PETERBOROUGH) | participant | 236˙465.00 |
4 |
IBZ-SALZCHEMIE GMBH & CO KG
Organization address
address: "Gewerbegebiet ""Schwarze Kiefern""" contact info |
DE (Halsbruecke) | participant | 224˙564.00 |
5 |
THE UK MATERIALS TECHNOLOGY RESEARCH INSTITUTE LIMITED
Organization address
address: MIDDLE ASTON HOUSE contact info |
UK (MIDDLE ASTON OXFORDSHIRE) | participant | 26˙976.00 |
6 |
ASOCIACION DE INVESTIGACION DE LAS INDUSTRIAS DE LA CONSTRUCCION
Organization address
address: "Parque Tecnologico de Paterna, c/ Benjamin Franklin 17" contact info |
ES (PATERNA - VALENCIA) | participant | 18˙396.00 |
7 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 17˙518.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Natural gas may be liquefied at -160oC thereby reducing its volume and providing an economic means for its transportation. Liquefied natural gas (LNG) enables gas markets to be connected with more distant export sources thereby improving market competitiveness and stability. Effective thermal insulation is critical to energy management throughout the LNG value chain, impacting on competitiveness and profitability. Furthermore, durability and fire protection are important to ensuring safety and protection of capital infrastructure.
Existing insulation systems are based on cellular foam or powder insulation structures, pipe-in-pipe vacuum insulated structures, or hybrid systems combining foam / powder and vacuum. Whilst cellular and powder materials are low cost, they are time consuming to install, rapidly degrade under cryogenic temperatures and are fixed in place preventing routine inspection. Whilst offering high performance, vacuum systems are expensive, complex to install and rapidly lose their vacuum with time. None of the existing systems offer adequate fire protection. The CryoWrap project will develop a highly innovative LNG insulation system incorporating emerging geopolymer & aeroclay material science & novel production processes, achieving:
• Enhanced insulation performance and service lifetime (improved energy & maintenance cost efficiency)
• High jet fire resistance performance for protection of infrastructure assets (Prioritising safety and added value)
• Energy efficient production of standardised and unique insulation half shell shapes (reduced environmental impact & cost competitiveness)
• Rapid on-site installation (greater flexibility and reduced installation costs)
• Efficient removal & re-installation (enabling routine inspection & ease of maintenance)
The global LNG insulation market is worth >€1 billion. The CryoWrap consortium target €35 million business growth within a 3 year period with the creation of 72 jobs.'
EFFECTIVE CONTROL OF AIR AND INSECT BORNE PATHOGENS AND DISEASES IN EUROPEAN BROILER HOUSES
Read More