Coordinatore | WIRTSCHAFT UND INFRASTRUKTUR GMBH & CO PLANUNGS KG
Organization address
address: SYLVENSTEINSTRASSE 2 contact info |
Nazionalità Coordinatore | Germany [DE] |
Totale costo | 6˙170˙216 € |
EC contributo | 3˙270˙285 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-ENERGY-2007-2-TREN |
Funding Scheme | CP |
Anno di inizio | 2008 |
Periodo (anno-mese-giorno) | 2008-08-01 - 2012-07-31 |
# | ||||
---|---|---|---|---|
1 |
WIRTSCHAFT UND INFRASTRUKTUR GMBH & CO PLANUNGS KG
Organization address
address: SYLVENSTEINSTRASSE 2 contact info |
DE (MUENCHEN) | coordinator | 0.00 |
2 |
3E N.V.
Organization address
address: Vaartstraat 61 contact info |
BE (Brussels) | participant | 0.00 |
3 |
ARCHI ILEKTRISMOU KYPROU
Organization address
address: FOTI PITTA 15 contact info |
CY (LEFKOSIA) | participant | 0.00 |
4 |
ELIA SYSTEM OPERATOR
Organization address
address: BOULEVARD DE L'EMPEREUR 20 contact info |
BE (BRUXELLES) | participant | 0.00 |
5 |
ENECO Energy Trade B.V.
Organization address
address: Rivium Quadrant contact info |
NL (Capelle a/d Ijssel) | participant | 0.00 |
6 |
Enercon GmbH
Organization address
address: Dreekamp contact info |
DE (Aurich) | participant | 0.00 |
7 |
KATHOLIEKE UNIVERSITEIT LEUVEN
Organization address
address: Oude Markt 13 contact info |
BE (LEUVEN) | participant | 0.00 |
8 |
Sarens nv
Organization address
address: Autoweg contact info |
BE (Wolvertem) | participant | 0.00 |
9 |
Transmission System Operator, Cyprus
Organization address
address: Evangelistrias contact info |
CY (Strovolos) | participant | 0.00 |
10 |
WindVision Windfarm Estinnes SA
Organization address
address: Rue Grande contact info |
BE (Estinnes) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
This action focuses on demonstrating the development of a cost-effective large scale high capacity wind park using new state-of-the-art multi megawatt turbines coupled with innovative technology used to stabilize the grid. A key objective of the ‘7-MW-WEC-by-11’ project is to introduce a new power class of large-scale Wind Energy Converters, the 7MW WEC, onto the market which has the potential to significantly contribute to higher market penetration levels for wind electricity in Europe. The new 7MW WEC will be designed and demonstrated at a large scale: eleven such WECs will be demonstrated in a 77 MW wind park close to Estinnes (Belgium). The wind park will be the first large-scale on-shore wind park in Belgium and the first in the world that will consist of this ‘mega’ turbine power class. Key challenges related to wind power will be addressed in this demonstration action ranging from technical issues (network stability and security), to financial aspects (cost effectiveness) to environmental issues (landscape pollution). First, the ‘mega’ turbines will be developed and installed ‘in series’; this is envisioned to significantly reduce costs and increase the market value. Second, new power electronics technology and improved wind forecasting will be used to stabilise the grid in the high capacity wind park. “Improved forecasting” is envisioned to furthermore improve the cost-effectiveness of the high capacity wind park (reduced imbalance costs, improved commercial value). Third, the 7MW turbines will be used to maximize wind energy capacity, while reducing landscape pollution and environmental impact: such a WEC generates more than double the energy in the same given area when compared to conventional 2MW turbines and requires the placement of fewer turbines when compared to conventionally used wind turbines. “Lessons learned” in developing the high capacity Estinnes wind park will be adapted to a different national context with a weak grid system, Cyprus.
High-capacity hydrogen-based green-energy storage solutions for grid balancing
Read More"CArbon-free Electricity by SEWGS: Advanced materials, Reactor and process design"
Read More"Equitable Testing and Evaluation of Marine Energy Extraction Devices in terms of Performance, Cost and Environmental Impact."
Read More