7MW-WEC-BY-11

Pilot Demonstration of Eleven 7MW-Class WEC at Estinnes in Belgium

 Coordinatore WIRTSCHAFT UND INFRASTRUKTUR GMBH & CO PLANUNGS KG 

 Organization address address: SYLVENSTEINSTRASSE 2
city: MUENCHEN
postcode: 81369

contact info
Titolo: Ms.
Nome: Christine
Cognome: Meyer-Haege
Telefono: +49 89 72012719
Fax: +49 89 72012791

 Nazionalità Coordinatore Germany [DE]
 Totale costo 6˙170˙216 €
 EC contributo 3˙270˙285 €
 Programma FP7-ENERGY
Specific Programme "Cooperation": Energy
 Code Call FP7-ENERGY-2007-2-TREN
 Funding Scheme CP
 Anno di inizio 2008
 Periodo (anno-mese-giorno) 2008-08-01   -   2012-07-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    WIRTSCHAFT UND INFRASTRUKTUR GMBH & CO PLANUNGS KG

 Organization address address: SYLVENSTEINSTRASSE 2
city: MUENCHEN
postcode: 81369

contact info
Titolo: Ms.
Nome: Christine
Cognome: Meyer-Haege
Telefono: +49 89 72012719
Fax: +49 89 72012791

DE (MUENCHEN) coordinator 0.00
2    3E N.V.

 Organization address address: Vaartstraat 61
city: Brussels
postcode: 1000

contact info
Titolo: Mr.
Nome: Geert
Cognome: Palmers
Telefono: 0032 2 2175868
Fax: 0032 2 2197989

BE (Brussels) participant 0.00
3    ARCHI ILEKTRISMOU KYPROU

 Organization address address: FOTI PITTA 15
city: LEFKOSIA
postcode: 1399

contact info
Titolo: Dr.
Nome: Andreas
Cognome: Poullikkas
Telefono: 35722201810
Fax: 35722201809

CY (LEFKOSIA) participant 0.00
4    ELIA SYSTEM OPERATOR

 Organization address address: BOULEVARD DE L'EMPEREUR 20
city: BRUXELLES
postcode: 1000

contact info
Titolo: Dr.
Nome: Peter
Cognome: Van Roy
Telefono: 32 2 3822267
Fax: 32 2 3822355

BE (BRUXELLES) participant 0.00
5    ENECO Energy Trade B.V.

 Organization address address: Rivium Quadrant
city: Capelle a/d Ijssel

contact info
Titolo: Mr.
Nome: Michel
Cognome: Tellman
Telefono: 31 10 4575499
Fax: 31 104577715

NL (Capelle a/d Ijssel) participant 0.00
6    Enercon GmbH

 Organization address address: Dreekamp
city: Aurich

contact info
Titolo: Ms.
Nome: Martina
Cognome: Kuhlmann
Telefono: -932003
Fax: -932011

DE (Aurich) participant 0.00
7    KATHOLIEKE UNIVERSITEIT LEUVEN

 Organization address address: Oude Markt 13
city: LEUVEN
postcode: 3000

contact info
Titolo: Ms.
Nome: Maria
Cognome: Vereeken
Telefono: 32 16 326504
Fax: 32 16 326515

BE (LEUVEN) participant 0.00
8    Sarens nv

 Organization address address: Autoweg
city: Wolvertem

contact info
Titolo: Mr.
Nome: Peter
Cognome: Libert
Telefono: 32 52 319 399
Fax: 32 52 319 329

BE (Wolvertem) participant 0.00
9    Transmission System Operator, Cyprus

 Organization address address: Evangelistrias
city: Strovolos

contact info
Titolo: Mr.
Nome: Andreas
Cognome: Theophanous
Telefono: 357 22 611611
Fax: 357 22 611666

CY (Strovolos) participant 0.00
10    WindVision Windfarm Estinnes SA

 Organization address address: Rue Grande
city: Estinnes

contact info
Titolo: Mr.
Nome: Jaap-Jan
Cognome: Ferweda
Telefono: 0032 16 299455
Fax: 0032 16 299458

BE (Estinnes) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

capacity    wec    forecasting    grid    estinnes    pollution    wind    significantly    turbines    energy    power    landscape    envisioned    environmental    effectiveness    demonstrated    first    park    mw    action    market    class    belgium    mega   

 Obiettivo del progetto (Objective)

This action focuses on demonstrating the development of a cost-effective large scale high capacity wind park using new state-of-the-art multi megawatt turbines coupled with innovative technology used to stabilize the grid. A key objective of the ‘7-MW-WEC-by-11’ project is to introduce a new power class of large-scale Wind Energy Converters, the 7MW WEC, onto the market which has the potential to significantly contribute to higher market penetration levels for wind electricity in Europe. The new 7MW WEC will be designed and demonstrated at a large scale: eleven such WECs will be demonstrated in a 77 MW wind park close to Estinnes (Belgium). The wind park will be the first large-scale on-shore wind park in Belgium and the first in the world that will consist of this ‘mega’ turbine power class. Key challenges related to wind power will be addressed in this demonstration action ranging from technical issues (network stability and security), to financial aspects (cost effectiveness) to environmental issues (landscape pollution). First, the ‘mega’ turbines will be developed and installed ‘in series’; this is envisioned to significantly reduce costs and increase the market value. Second, new power electronics technology and improved wind forecasting will be used to stabilise the grid in the high capacity wind park. “Improved forecasting” is envisioned to furthermore improve the cost-effectiveness of the high capacity wind park (reduced imbalance costs, improved commercial value). Third, the 7MW turbines will be used to maximize wind energy capacity, while reducing landscape pollution and environmental impact: such a WEC generates more than double the energy in the same given area when compared to conventional 2MW turbines and requires the placement of fewer turbines when compared to conventionally used wind turbines. “Lessons learned” in developing the high capacity Estinnes wind park will be adapted to a different national context with a weak grid system, Cyprus.

Altri progetti dello stesso programma (FP7-ENERGY)

INGRID (2012)

High-capacity hydrogen-based green-energy storage solutions for grid balancing

Read More  

CAESAR (2008)

"CArbon-free Electricity by SEWGS: Advanced materials, Reactor and process design"

Read More  

EQUIMAR (2008)

"Equitable Testing and Evaluation of Marine Energy Extraction Devices in terms of Performance, Cost and Environmental Impact."

Read More