Coordinatore | Laboratorio Nacional de Energia e Geologia I.P.
Organization address
address: Rua da Amieira contact info |
Nazionalità Coordinatore | Portugal [PT] |
Totale costo | 3˙125˙087 € |
EC contributo | 2˙343˙129 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-ENERGY-2009-1 |
Funding Scheme | CP |
Anno di inizio | 2010 |
Periodo (anno-mese-giorno) | 2010-01-01 - 2012-12-31 |
# | ||||
---|---|---|---|---|
1 |
Laboratorio Nacional de Energia e Geologia I.P.
Organization address
address: Rua da Amieira contact info |
PT (S.Mamede de infesta) | coordinator | 283˙695.75 |
2 |
"ASATREM SRL - APPLIED SYSTEMS ANALYSES, TECHNOLOGY AND RESEARCH, ENERGY MODELS"
Organization address
address: Piazza Corvetto 1/8 - c/o Studio Segalerba Solano contact info |
IT (GENOVA) | participant | 328˙400.00 |
3 |
UNIVERSITEIT UTRECHT
Organization address
address: Heidelberglaan 8 contact info |
NL (UTRECHT) | participant | 189˙500.00 |
4 |
CENTRO DE INVESTIGACIONES ENERGETICAS, MEDIOAMBIENTALES Y TECNOLOGICAS-CIEMAT
Organization address
address: Avenida Complutense 22 contact info |
ES (MADRID) | participant | 183˙500.00 |
5 |
UNIVERSIDADE DE EVORA
Organization address
address: Largo dos Colegiais 2 contact info |
PT (Evora) | participant | 162˙000.00 |
6 |
FORSCHUNGSZENTRUM JUELICH GMBH
Organization address
address: Leo-Brandt-Strasse contact info |
DE (JUELICH) | participant | 154˙732.00 |
7 |
Nome Ente NON disponibile
Organization address
city: MADRID contact info |
ES (MADRID) | participant | 153˙000.00 |
8 |
BUREAU DE RECHERCHES GEOLOGIQUES ET MINIERES
Organization address
address: Quai Andre Citroen - Tour Mirabeau 39-43 contact info |
FR (PARIS) | participant | 141˙524.00 |
9 |
FUNDACAO DA FACULDADE DE CIENCIAS E TECNOLOGIA DA UNIVERSIDADE NOVA DE LISBOA.
Organization address
address: "Campus de Caparica, Quinta da Torre S/N" contact info |
PT (CAPARICA) | participant | 138˙010.00 |
10 |
University Mohammed V-Agdal
Organization address
address: RUE MICHLIFEN 3 contact info |
MA (Rabat) | participant | 117˙600.00 |
11 |
UNIVERSITE MOHAMMED PREMIER 1 - UMP
Organization address
address: BOULEVARD MOHAMMED VI contact info |
MA (OUJDA) | participant | 101˙400.00 |
12 |
Office National des Hydrocarbures et des mines
Organization address
address: Avenue Moulay Hassan 5 contact info |
MA (Rabat) | participant | 80˙000.00 |
13 |
"INSTITUTO NACIONAL DE ENGENHARIA, TECNOLOGIA E INOVACAO"
Organization address
address: ESTRADA DO PACO DO LUMIAR 22 contact info |
PT (LISBOA) | participant | 71˙470.26 |
14 |
Nome Ente NON disponibile
Organization address
address: Rue Othman ben Affan 65 contact info |
MA (Casablanca) | participant | 60˙600.00 |
15 |
EDP - GESTAO DA PRODUCAO DE ENERGIA SA
Organization address
address: Avenida Jose Malhoa Lote A-13 contact info |
PT (Lisboa) | participant | 59˙542.00 |
16 |
Galp Energia SA
Organization address
address: RUA TOMAS DA FONSECA TORRE C 1 contact info |
PT (LISBOA) | participant | 44˙421.00 |
17 |
TEJO ENERGIA S.A.
Organization address
address: "EST NACIONAL 118KM 142,1 -pego" contact info |
PT (Abrantes) | participant | 37˙200.00 |
18 |
ENDESA GENERACION SA
Organization address
address: AV DE LA BORBOLLA 5 contact info |
ES (SEVILLA) | participant | 36˙534.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'COMET aims at identifying and assessing the most cost effective CO2 transport and storage infrastructure able to serve the West Mediterranean area, namely Portugal, Spain and Morocco. This is achieved considering the time and spatial aspects of the development of the energy sector and other industrial activities in those countries as well as the location, capacity and availability of potential CO2 storage geological formations. Special attention is given to a balanced decision on transport modes, matching the sources and sinks, addressing safety and lifetime objectives, meeting optimal cost - benefit trade-off, for a CCS network infrastructure as part of an international cooperation policy. The need for a joint CCS infrastructure in the West Mediterranean is related to the geographical proximity, to the increasing connections between the energy and industrial sectors in the area, to the continuity of sedimentary basins that can act as possible storage reservoirs and to the existing experience in managing a large gas transport infrastructure, such as the natural gas pipeline coming through Morocco, to Spain and Portugal. The consortium is coordinated by INETI (Portugal), and comprises 7 research institutions, 4 Universities, 1 SME and 5 energy companies from 6 European countries and Morocco. COMET aims to optimise the connection between sources and sinks by comparing the several possible transport modes (pipelines, trains, ships and trucks) and existing and to be realized infrastructures and expects to find the least-cost transport mode and routes from clusters to sinks. It is expected that each source cluster will be rigorously matched to the most suitable sink, while minimising the required investment in infrastructures and taking advantage of the effect of scale associated to an integrated infrastructure. COMET will be an important step towards the safe and commercial deployment of large scale near zero emission power plants in SW Europe and North Africa.'