Coordinatore | KEMA NEDERLAND BV
Organization address
address: Utrechtseweg 310 contact info |
Nazionalità Coordinatore | Netherlands [NL] |
Totale costo | 5˙147˙362 € |
EC contributo | 3˙499˙997 € |
Programma | FP7-ICT
Specific Programme "Cooperation": Information and communication technologies |
Code Call | FP7-ICT-ENERGY-2009-1 |
Funding Scheme | CP |
Anno di inizio | 2010 |
Periodo (anno-mese-giorno) | 2010-01-01 - 2012-12-31 |
# | ||||
---|---|---|---|---|
1 |
KEMA NEDERLAND BV
Organization address
address: Utrechtseweg 310 contact info |
NL (Arnhem) | coordinator | 0.00 |
2 |
CONSORZIO PER LA RICERCA NELL' AUTOMATICA E NELLE TELECOMUNICAZIONI C.R.A.T.
Organization address
address: VIA NAIDE contact info |
IT (ROMA) | participant | 0.00 |
3 |
DEVOLO AG
Organization address
address: Charlottenburger Allee contact info |
DE (AACHEN) | participant | 0.00 |
4 |
HW COMMUNICATIONS LIMITED
Organization address
address: Parkfield, Greaves Road contact info |
UK (LANCASTER) | participant | 0.00 |
5 |
IAD GESELLSCHAFT FUR INFORMATIK AUTOMATISIERUNG UND DATENVERARBEITUNG MBH
Organization address
address: Unterschlauersbacher Hauptstrasse contact info |
DE (GROSSHABERSDORF) | participant | 0.00 |
6 |
KEMA Consulting GmbH
Organization address
address: Kurt-Schuhmacher-Strasse contact info |
DE (Bonn) | participant | 0.00 |
7 |
KEMA-IEV Ingenieurunternehmen fuer Energieversorgung GmbH
Organization address
address: Gostritzer Strasse contact info |
DE (Dresden) | participant | 0.00 |
8 |
LANCASTER UNIVERSITY
Organization address
address: BAILRIGG contact info |
UK (LANCASTER) | participant | 0.00 |
9 |
OESTERREICHISCHE AKADEMIE DER WISSENSCHAFTEN
Organization address
address: DR. IGNAZ SEIPEL-PLATZ contact info |
AT (WIEN) | participant | 0.00 |
10 |
TECHNISCHE UNIVERSITAET DRESDEN
Organization address
address: HELMHOLTZSTRASSE contact info |
DE (DRESDEN) | participant | 0.00 |
11 |
THE ISRAEL ELECTRIC CORPORATION LIMITED
Organization address
address: NTIV HAOR contact info |
IL (HAIFA) | participant | 0.00 |
12 |
VATTENFALL EUROPE NETZSERVICE GmbH
Organization address
address: PUSCHKINALLEE contact info |
DE (BERLIN) | participant | 0.00 |
13 |
VLAAMSE INSTELLING VOOR TECHNOLOGISCH ONDERZOEK N.V.
Organization address
address: Boeretang contact info |
BE (MOL) | participant | 0.00 |
14 |
Yitran Communications LTD
Organization address
address: Yehoshua Hatzoref contact info |
IL (Beer Sheva) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
Today, there are largely no communications infrastructure deployments in European medium and low voltage power distribution networks. Powerline communications has a large potential to enable new and intelligent applications to and from the last branch of the distribution grid. However, current powerline communication technologies cannot offer the reliability, quality of service and interoperability that is required for such applications.nnDLCVIT4IP will develop, verify and test a high-speed narrow-band powerline communications infrastructure using the Internet Protocol (IP) which is capable of supporting existing and extending new and multiple communication applications. These shall include the existing power distribution network for novel services in smart electricity distribution networks such as demand side management, control of distributed generation and customer integration.nnFrom a communication perspective, the powerline network offers advantages in coverage, costs and availability. On the application side the Internet protocol (IP) suite is an increasingly used protocol stack in many supervisory and control application fields which include the energy sector.nnTo efficiently integrate both technologies and achieve the necessary performance and reliability DLCVIT4IP will extend existing PLC technologies by developing:n1.tEfficient transport of the IP(v6) protocoln2.tAutomatic measurement, configuration and managementn3.tSecurityn4.tReal-time capabilitiesn5.tChannel models and simulation tools for network planning and designnModels and the developed system will be tested and verified in a field test.nnOutcomes of the project will include a prototype for a high performance communications infrastructure, simulation and planning tools. Testing and conformance rules for application developers and users to choose an appropriate technology for their needs are key driver for end use. Many of these outcomes will be transferred to standardisation.