Coordinatore | CNE TECHNOLOGY LTD
Organization address
address: P.O. Box 16104 5 contact info |
Nazionalità Coordinatore | Cyprus [CY] |
Totale costo | 3˙992˙205 € |
EC contributo | 2˙741˙485 € |
Programma | FP7-ICT
Specific Programme "Cooperation": Information and communication technologies |
Code Call | FP7-ICT-2009-4 |
Funding Scheme | CP |
Anno di inizio | 2010 |
Periodo (anno-mese-giorno) | 2010-01-01 - 2013-06-30 |
# | ||||
---|---|---|---|---|
1 |
CNE TECHNOLOGY LTD
Organization address
address: P.O. Box 16104 5 contact info |
CY (Nicosia) | coordinator | 0.00 |
2 |
ACCIONA INFRAESTRUCTURAS S.A.
Organization address
address: AVENIDA DE EUROPA contact info |
ES (ALCOBENDAS) | participant | 0.00 |
3 |
APPLIED INDUSTRIAL TECHNOLOGIES LTD
Organization address
address: Souliou str. & Kalavriton contact info |
EL (Gerakas) | participant | 0.00 |
4 |
ASM CENTRUM BADAN I ANALIZ RYNKU SP. Z O O
Organization address
address: Grunwaldzka contact info |
PL (KUTNO) | participant | 0.00 |
5 |
BUILDING RESEARCH ESTABLISHMENT LTD
Organization address
address: BUCKNALLS LANE contact info |
UK (WATFORD) | participant | 0.00 |
6 |
D'APPOLONIA SPA
Organization address
address: Via San Nazaro contact info |
IT (GENOVA) | participant | 0.00 |
7 |
DAEDALUS INFORMATICS LTD
Organization address
address: Ikarias contact info |
EL (Athens) | participant | 0.00 |
8 |
FUNDACION TECNALIA RESEARCH & INNOVATION
Organization address
address: PARQUE TECNOLOGICO DE BIZKAIA - CALLE GELDO - EDIFICIO 700 contact info |
ES (DERIO) | participant | 0.00 |
9 |
INSTITUT MIHAJLO PUPIN
Organization address
address: VOLGINA contact info |
RS (BEOGRAD) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
ENERGY WARDEN (EW) addresses the optimisation of renewable energy technology (RET) deployment in the building domain. EW will develop and market the following products:nnSIMULATOR (EW-S): A simulator and modelling tool, including dynamic models for energy producing, storing and using units that may provide decision aid when designing or retrofitting energy infrastructures at the building domain. Important to highlight is that the simulator will be run in a short and a long term time frame; that of 1-4 days and that of a year. The first time-frame will be driven by meteorological forecast data, which have a large level of confidence for this time-frame. The first time frame delivers set points to the EW Controller, whereas the more long term one is more suitable for assessing RET investment scenaria.nnCONTROLLER (EW-C): The controller will be based on an expert system/ neural network approach and will provide real time control of the RET infrastructure. The real time controller will manage how energy is allocated between uses, stores, and possibilities to be fed back to the energy network. The EW-C may also unveil energy use trends, particularly useful for the simulator. In this way, the EW-S and the EW-C form a closed loop. The EW-C will include a data collection module, low cost hardware including sensors and data loggers/ transmitters, which will be deployed at the building over a period of time and facilitate the collection of data. It is emphasized that emerging wireless protocols will be a key aspect of this data collection, as such systems are particularly important in the case of energy retrofit action, where wired sensors may be impossible or costly to install.nnPOLICY (EW-P): A higher level functionality will support policy conformance and emission trading, allowing to monitor the building performance, old and new, against existing policies or standards, including the EU directive on building energy as well as supporting the capability for use in emission trading calculations.nnEW will be an open, standard compliant, system, able to support many new, upcoming, supply/ store/ use options that are constantly entering the market.