PINCETTE

Validating Changes and Upgrades in Networked Software

 Coordinatore IBM ISRAEL - SCIENCE AND TECHNOLOGY LTD 

 Organization address address: IBM Haifa University Campus, Mount Carmel
city: Haifa
postcode: 3498825

contact info
Titolo: Mr.
Nome: Ronen
Cognome: Levy
Email: send email
Telefono: +972 4 829 6557
Fax: +972 4 829 6114

 Nazionalità Coordinatore Israel [IL]
 Totale costo 4˙173˙406 €
 EC contributo 2˙800˙000 €
 Programma FP7-ICT
Specific Programme "Cooperation": Information and communication technologies
 Code Call FP7-ICT-2009-5
 Funding Scheme CP
 Anno di inizio 2010
 Periodo (anno-mese-giorno) 2010-07-01   -   2013-10-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    IBM ISRAEL - SCIENCE AND TECHNOLOGY LTD

 Organization address address: IBM Haifa University Campus, Mount Carmel
city: Haifa
postcode: 3498825

contact info
Titolo: Mr.
Nome: Ronen
Cognome: Levy
Email: send email
Telefono: +972 4 829 6557
Fax: +972 4 829 6114

IL (Haifa) coordinator 0.00
2    ABB AG

 Organization address address: KALLSTADTER STRASSE
city: MANNHEIM
postcode: 68309

contact info
Titolo: Mr.
Nome: Jürgen
Cognome: Friedrich
Email: send email
Telefono: +49 6203 71 6117
Fax: +49 6203 71 6107

DE (MANNHEIM) participant 0.00
3    ABB SCHWEIZ AG

 Organization address address: Brown Boveri Strasse 6
city: BADEN
postcode: 5400

contact info
Titolo: Mr.
Nome: Alexander
Cognome: Scharrer
Email: send email
Telefono: +41 58 586 70 63
Fax: +41 58 588 00 06

CH (BADEN) participant 0.00
4    ISRAEL AEROSPACE INDUSTRIES LTD.

 Organization address address: BEN GURION INTERNATIONAL AIRPORT
city: LOD
postcode: 70100

contact info
Titolo: Mr.
Nome: Ariav
Cognome: Savir
Email: send email
Telefono: +972 3 935 6365
Fax: +972 3 935 3636

IL (LOD) participant 0.00
5    TEKNOLOGIAN TUTKIMUSKESKUS VTT

 Organization address address: TEKNIIKANTIE
city: ESPOO
postcode: 02044 VTT

contact info
Titolo: Ms.
Nome: Katri
Cognome: Kurvinen
Email: send email
Telefono: +358 20 722 3303
Fax: +358 20 722 3365

FI (ESPOO) participant 0.00
6    THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF OXFORD

 Organization address address: University Offices, Wellington Square
city: OXFORD
postcode: OX1 2JD

contact info
Titolo: Ms.
Nome: Linda
Cognome: Polik
Email: send email
Telefono: +44 1865 289800
Fax: +441865 289801

UK (OXFORD) participant 0.00
7    UNIVERSITA DELLA SVIZZERA ITALIANA

 Organization address address: VIA LAMBERTENGHI
city: LUGANO
postcode: 6904

contact info
Titolo: Ms.
Nome: Paola
Cognome: Colferai
Email: send email
Telefono: +41 58 666 4818
Fax: +41 58 666 4647

CH (LUGANO) participant 0.00
8    UNIVERSITA' DEGLI STUDI DI MILANO-BICOCCA

 Organization address address: PIAZZA DELL'ATENEO NUOVO
city: MILANO
postcode: IT-20126

contact info
Titolo: Dr.
Nome: Teresa
Cognome: Gallicchio
Email: send email
Telefono: 390264000000
Fax: 390264000000

IT (MILANO) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

upgrades    distributed    environmental    monitoring    validating    components       infrastructure    pincette    version    transportation    networked    infrastructures    once   

 Obiettivo del progetto (Objective)

Europe relies on the availability and flawless functioning of distributed infrastructures, such as electricity, water, communication, transportation, and environmental management. This infrastructure is based on distributed networked IT systems for monitoring and control.nnTechnological innovation offers opportunities for more efficient infrastructure.nInnovation in infrastructures and the resulting improvement in quality of life are hindered by the danger of upgrades:n•tin a new version, some of the existing functionality can be lost;n•tincompatibilities between the old and new version can result in major service outages;nAs it is infeasible to update the entire infrastructure at once, periods of coexistence between old and new components are inevitable.nnAs a result, infrastructure upgrades are done only once the existing infrastructure performs below acceptable levels. Lowering the risk of infrastructure updates will benefit society, infrastructure operators, and the European systems vendors. All existing validation solutions do not take upgrades into account. A solution for validating upgrades is in dire need because of shorter product lifecycles and increasing complexity and scale of networked systems.nnPINCETTE will develop the technology to ensure safe infrastructure upgrades by validating continuously evolving networked software systems.nPINCETTE will 1) reduce the cost and time to market of upgrades by several orders of magnitude; 2) increase the level of confidence in the safety of upgrades; 3) enable certification of upgrades.nnnThe PINCETTE consortium is composed of the leading European research experts and prominent infrastructure providers. The PINCETTE technology will be validated at:n•tABB produces and sells components and systems used in utility, industrial, and public transportation infrastructures. A major share of the European power grid is built on ABB equipment.n•tVTT provides the monitoring and maintenance robot system for the International Thermonuclear Experimental Reactor.n•tIAI operates autonomous aircrafts for environmental monitoring, deployed worldwide.

Altri progetti dello stesso programma (FP7-ICT)

VIMSEN (2014)

VIMSEN: Virtual Microgrids for Smart Energy Networks

Read More  

FOTNet2 (2011)

Field Operational Test Networking and Methodology Promotion

Read More  

TERENCE (2010)

An Adaptive Learning System for Reasoning about Stories with Poor Comprehenders and their Educators

Read More