HAWE

High Altitude Wind Energy

 Coordinatore OMNIDEA LDA 

 Organization address address: TRAVESSA ANTONIO GEDEAO 9
city: VISEU
postcode: 3510 017

contact info
Titolo: Mr.
Nome: Nuno
Cognome: Fernandes
Email: send email
Telefono: 351212000000
Fax: 351213000000

 Nazionalità Coordinatore Portugal [PT]
 Totale costo 2˙935˙108 €
 EC contributo 1˙920˙470 €
 Programma FP7-ENERGY
Specific Programme "Cooperation": Energy
 Code Call FP7-ENERGY-2010-FET
 Funding Scheme CP
 Anno di inizio 2010
 Periodo (anno-mese-giorno) 2010-10-01   -   2014-09-30

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    OMNIDEA LDA

 Organization address address: TRAVESSA ANTONIO GEDEAO 9
city: VISEU
postcode: 3510 017

contact info
Titolo: Mr.
Nome: Nuno
Cognome: Fernandes
Email: send email
Telefono: 351212000000
Fax: 351213000000

PT (VISEU) coordinator 641˙370.75
2    "Sveuciliste u Zagrebu, Fakultet strojarstva i brodogradnje"

 Organization address address: Ivana Lucica 5
city: Zagreb
postcode: 10 000

contact info
Titolo: Prof.
Nome: Neven
Cognome: Duic
Email: send email
Telefono: 385915000000
Fax: 38516156940

HR (Zagreb) participant 474˙300.00
3    Rapp Hydema AS

 Organization address address: Nyholmen
city: Bodo
postcode: 8037

contact info
Titolo: Mr.
Nome: Inge Henning
Cognome: Andersen
Email: send email
Telefono: 4775529330
Fax: 477555010

NO (Bodo) participant 273˙081.00
4    LANKHORST TOUWFABRIEKEN BV

 Organization address address: PRINSENGRACHT 2
city: SNEEK
postcode: 8607 AD

contact info
Titolo: Mr.
Nome: Steven
Cognome: Wardenier
Email: send email
Telefono: 31515487654
Fax: 31515487550

NL (SNEEK) participant 206˙897.00
5    DANMARKS TEKNISKE UNIVERSITET

 Organization address address: Anker Engelundsvej 1, Building 101A
city: KONGENS LYNGBY
postcode: 2800

contact info
Titolo: Ms.
Nome: Karen Hyllested
Cognome: Thielsen
Email: send email
Telefono: +45 4677 5018
Fax: 4546775083

DK (KONGENS LYNGBY) participant 205˙638.00
6    SERVICIOS Y ESTUDIOS PARA LA NAVEGACION AEREA Y LA SEGURIDAD AEURONAUTICA SA

 Organization address address: AVENIDA DE LA HISPANIDAD 12
city: MADRID
postcode: 28042

contact info
Titolo: Ms.
Nome: Maria Isabel
Cognome: Izquierdo
Email: send email
Telefono: 34913019822
Fax: 34913019435

ES (MADRID) participant 66˙024.25
7    EDP INOVACAO SA

 Organization address address: PRACA MARQUES DE POMBAL 12
city: LISBOA
postcode: 1250 162

contact info
Titolo: Mr.
Nome: João
Cognome: Gonçalo Maciel
Email: send email
Telefono: 351210000000
Fax: 351210000000

PT (LISBOA) participant 53˙159.50

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

cable    cycle    wind    ground    currents    towers    energy    renewable    cylinder    flywheel    altitude    station    tether    rotating       power    difficulties    hawe   

 Obiettivo del progetto (Objective)

'The quest for clean and renewable energy sources found tremendous potential in wind power. So far, it has been harvested mostly by wind towers, which use only wind currents close to the ground (bellow 200m of height). Since low altitude wind currents are slow and intermittent, most wind farms operate, on average, 25-35% of their capacity. This represents a severe limitation to current state-of-art wind power technology, as towers can hardly be taller than 130m without prohibitive costs and insurmountable technical difficulties. To bypass these difficulties, it is proposed to perform R&D in a multitude of technology fields such as materials, aerodynamics and control, further developing a wind power system capable of harnessing the energy potential of high altitude wind without the need for heavy towers or expensive elevated nacelles: we call it HAWE (High Altitude Wind Energy). HAWE consists of a buoyant, rotating, cylinder shaped, airship, anchored to a ground station by a tether cable operating a two phase cycle. During the power production phase the Magnus effect on the rotating cylinder generates lift, pulling up the tether cable which, at the ground station, is in a winch drum driving a flywheel connected to an alternator producing electricity. When the tether cable is fully unwound, the recovery phase starts - as the cylinder rotation ceases and the cable is reeled back to its initial position decoupled from the flywheel, completing a cycle. This is performed continuously. The successful implementation of this concept will increase the share of renewable energy in Europe since, the achievement of the goal to produce renewable energy at competitive prices with coal derived energy, should lower its cost. A high security of supply, a cleaner environment, and the possibility to keep Europe as a global leader in wind power, are other benefits of this technology.'

Altri progetti dello stesso programma (FP7-ENERGY)

HRC POWER (2012)

Hybrid Renewable Energy Converter for continuous and flexible power production

Read More  

NIWE (2013)

New Induction Wireless Manufacturing Efficient Process for Energy Intensive Industries

Read More  

ENERCORN (2009)

DEMONSTRATION OF A 16MW HIGH ENERGY EFFICIENT CORN STOVER BIOMASS POWER PLANT

Read More