Horizon2020 projects coordinated by "ENAV SPA"
# |
project acronym |
year |
total cost |
totalcontribution |
1 |
BLUEGNSS Promoting EGNSS Operational Adoption in BLUEMED FAB |
2016 |
2˙304˙181.00 |
1˙612˙926.00 |
2 |
PJ22 SEABIRD PJ22:Validation and Demonstration Engineering |
2016 |
3˙355˙719.00 |
2˙051˙333.00 |
3 |
PJ03A SUMO Integrated Surface Management |
2016 |
19˙603˙985.00 |
12˙721˙436.00 |
More Horizon 2020 projects
The Institution ENAV SPA has been involved also in the following Horizon 2020 projects.
- FUTURE SKY SAFETY (2015, participant)
- E-AIRPORT (2015, participant)
- BEYOND (2015, participant)
- DARWIN (2015, participant)
- RETINA (2016, participant)
- PJ31 DIGITS (2016, participant)
- PJ09 DCB (2016, participant)
- PJ08 AAM (2016, participant)
- PJ01 EAD (2016, participant)
- PJ20 AMPLE (2016, participant)
- PJ06 TOBEFREE (2016, participant)
- PJ03B SAFE (2016, participant)
- PJ16 CWP HMI (2016, participant)
- PJ15 COSER (2016, participant)
- PJ10 PROSA (2016, participant)
- PJ05 REMOTE TOWER (2016, participant)
- PJ18 4DTM (2016, participant)
- PJ19 CI (2016, participant)
- PJ02 EARTH (2016, participant)
- PJ27 IOPVLD (2016, participant)
- CORUS (2017, participant)
- PJ18-W2 4D SKYWAYS (2019, participant)
- PJ07-W2 OAUO (2019, participant)
- PJ01-W2 EAD (2019, participant)
- PJ05-W2 DTT (2019, participant)
- PJ13 - W2 ERICA (2019, participant)
- PJ10-W2 PROSA (2019, participant)
- PJ14-W2 I-CNSS (2019, participant)
- PJ02-W2 AART (2019, participant)
- PJ20-W2 AMPLE (2019, participant)
- PJ19-W2 CI (2019, participant)
- PJ09-W2 DNMS (2019, participant)