Opendata, web and dolomites

COFASTRANS

A FAST AND ECO-EFFICIENT TRANSHIPMENT SYSTEM FOR ULTRA LARGE CONTAINERVESSELS

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 COFASTRANS project word cloud

Explore the words cloud of the COFASTRANS project. It provides you a very rough idea of what is the project "COFASTRANS" about.

covers    services    small    group    conventional    trading    stacks    ulcvs    suited    hatch    annual    cranes    payback    free    npv    indented    investment    savings    line    world    stakeholders    business    aerodynamic    completion    market    arrangement    imposed    operations    logistics    details    container    ultra    local    throughput    solution    benefits    placing    irr    quays    innovative    intermodal    limitations    description    ideally    ground    combination    sources    risk    profile    cope    containers    vessels    financial    electricity    global    smaller    effect    flow    roadways    portal    optimising    trolley    subsequent    ports    terminals    flows    stowage    period    running    berths    cash    sides    ordinary    unloading    elevated    ship    loading    lanes    plan    economies    terminal    capacity    automated    environmental    human    wages    handled    accommodating    calculation    sales    fuel    connections    dimensions    parties    fast   

Project "COFASTRANS" data sheet

The following table provides information about the project.

Coordinator
BECKETT RANKINE LIMITED 

Organization address
address: 47-51 GILLINGHAM STREET
city: LONDON
postcode: SW1V 1HS
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.cofastrans.com.
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2014
 Duration (year-month-day) from 2014-10-01   to  2015-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    BECKETT RANKINE LIMITED UK (LONDON) coordinator 50˙000.00

Map

 Project objective

The aim of the project is the design of an integrated intermodal system ideally suited for fast loading/unloading of the new Ultra Large Container Vessels and the subsequent fast terminal stowage of the containers. The proposed container terminal includes two major innovative concepts: a) a small number of indented berths for accommodating the new ULCVs which are handled by new multi-trolley portal container cranes enabling fast loading and unloading from both sides of the ship and b) a multi-level container terminal with ground running lanes, elevated container flow roadways and an innovative system for placing hatch covers. The above arrangement is proposed in combination with ordinary line quays with conventional container cranes for accommodating the smaller vessels. The business plan will include description of the new system, its equipment and operations, market analysis, logistics details, description of human resources, environmental benefits, financial risk assessment, calculation of costs and cash flows from sales of services, funding sources, NPV and IRR of the investment, payback period, effect of the new system on local economies, savings in electricity, fuel, wages, and increase in annual throughput capacity among various parties and stakeholders. Detail studies are going to be carried out in phase 2, providing results for the dimensions of the new portal cranes, their aerodynamic profile and connections and optimising container stacks and roadways around the indented berths and the use of automated systems. The completion of the project will provide a solution to the limitations of the existing container terminals to cope with the new ULCVs and will free the design of the ULCVs from limitations imposed by the capabilities of the current loading/unloading means. The proposed solution aims at the global container terminal market. European ports will be the main target group, although trading partners of EU in the world are also to be considered.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "COFASTRANS" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "COFASTRANS" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

SIADE (2014)

Spatial Decision Support System for Transportation Planning

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More