The page lists 13 deliverables related to the research project "RItrain".
title and desprition | type | last update |
---|---|---|
D3.2 set of relevant existing learning opportunities flagged in on-course®Courses identifies in D3.1 that meet our quality criteria will be entered into the on-course® database, properly described and flagged and made searchable in the on-course® platform. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Other | 2020-04-07 |
D2.4 half year WP progress report to the Project CoordinatorAll work packages will write half-yearly WP progress reports and submit these to the Project Coordinator; these reports will be used to assess whether the project is on track and to agree upon any necessary corrective action. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |
D4.1 Develop the Infrastructure Empowerment© modelTo cater for the specific needs of infrastructures and institutions, we will develop the Infrastructure Empowerment© model. This model will be based on the organisational competency requirements emerging from WP2. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |
D3.4 report on gaps in training: white paper on training needsThe results of the gap analysis described in D3.3 will first be shared and discussed with the project consortium. They will inform WP4 and WP5 for curriculum development and course delivery, and will be published as a white paper. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |
D2.2 Organisational competency framework v. 1.0Using the roles prioritised in task 1, we will draft a competency matrix for organisational roles in research infrastructure at three distinct stages of their lifecycle: planning, construction and operation. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |
D1.2 Release of web-site, internal communication platform and mailing listWe will develop and release a project specific web-site, setup an internal communication platform and mailing lists Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Websites, patent fillings, videos etc. | 2020-04-07 |
D2.1 Market research to determine roles needed by research infrastructuresUsing the MERIL resource (https://portal.meril.eu) as our source, we will survey existing national and international research infrastructures in Europe to determine the size of our market; this research will also allow us to gain valuable information on the perceived need for training, allowing us to prioritise competency requirements. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Other | 2020-04-07 |
D4.2 Develop Curriculum for Master in Research Infrastructure LeadershipWe will create a set of accredited curriculum syllabi including i) required competencies and targets; ii) course type, level and indicative content; iii) learning methodologies. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |
D3.3 gap analysis – mapping of competencies identified in WP2 to existing coursesThe list of courses compiled for D3.2 will be analysed to identify gaps. This analysis will compare the compiled data in on-course® with: the results of a survey on training needs among research infrastructures; and the defined competencies to see whether they are sufficiently delivered by existing courses, in terms of content and learning outcomes, quality and geographic coverage. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |
D4.3 Select Teaching methodsWe will set guidelines for teaching delivery and learning methodologies. The learning approach will be based on sound academic methods proved to effectively transfer and enact professional qualities, capabilities and expertise thanks to the use of diverse learning methodologies. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Other | 2020-04-07 |
D3.5 half year WP progress reportAll work packages will write half-yearly WP progress reports and submit these to the Project Coordinator; these reports will be used to assess whether the project is on track and to agree upon any necessary corrective action. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |
D3.1 identification of course providers and courses with input from RIsWe will use the competency framework created by WP2 to identify existing courses that already fulfil these competency requirements. This will be done through an online survey distributed to managers, coordinators and training representatives in existing and emergent research infrastructures. Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |
D.1.4 Reports of the EAB meetingsReports of the EAB Programme: H2020-EU.1.4.2.2. - Topic(s): INFRASUPP-3-2014 |
Documents, reports | 2020-04-07 |