Explore the words cloud of the EnFAIT project. It provides you a very rough idea of what is the project "EnFAIT" about.
The following table provides information about the project.
Coordinator |
NOVA INNOVATION LTD
Organization address contact info |
Coordinator Country | United Kingdom [UK] |
Project website | https://www.enfait.eu/ |
Total cost | 20˙204˙450 € |
EC max contribution | 14˙914˙599 € (74%) |
Programme |
1. H2020-EU.3.3.2. (Low-cost, low-carbon energy supply) |
Code Call | H2020-LCE-2016-RES-IA |
Funding Scheme | IA |
Starting year | 2017 |
Duration (year-month-day) | from 2017-07-01 to 2022-06-30 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | NOVA INNOVATION LTD | UK (EDINBURGH) | coordinator | 9˙723˙304.00 |
2 | OFFSHORE RENEWABLE ENERGY CATAPULT | UK (BLYTH NORTHUMBERLAND) | participant | 1˙497˙825.00 |
3 | SKF GMBH | DE (SCHWEINFURT) | participant | 1˙220˙992.00 |
4 | THE UNIVERSITY OF EDINBURGH | UK (EDINBURGH) | participant | 1˙073˙790.00 |
5 | AGENCE INTERCOMMUNALE DEDEVELOPPEMENT DES ARRONDISSEMENTSDE TOURNAI D'ATH ET DE COMMUNESAVOISINANTES | BE (TOURNAI) | participant | 397˙827.00 |
6 | WOOD GROUP FRANCE SAS | FR (PARIS) | participant | 341˙355.00 |
7 | JAMES FISHER MARINE SERVICES LIMITED | UK (BARROW-IN- FURNESS) | participant | 303˙318.00 |
8 | RSK ENVIRONNEMENT | FR (CLICHY) | participant | 283˙290.00 |
9 | MOJO MARITIME LIMITED | UK (FALMOUTH) | participant | 72˙896.00 |
10 | ELSA | BE (TOURNAI) | participant | 0.00 |
11 | HMK TECHNICAL SERVICES LIMITED | UK (CONGLETON CHESHIRE) | participant | 0.00 |
In this flagship project, the EnFAIT (Enabling Future Arrays in Tidal) Team, a partnership of leading European companies, will demonstrate a grid-connected tidal energy array that:
- demonstrates a step change in the lifetime cost of energy for tidal power; - proves that high array reliability & availability can be achieved with best practice maintenance regimes; - captures and disseminates substantial learning on fundamental issues for the ocean energy industry; - builds investor confidence; - takes a huge step towards creating a commercial, bankable tidal energy sector; and - at 6 turbines, will be the largest number of devices ever deployed in an ocean energy array.
This project will build upon an existing operational site, minimising development risk and allowing the generation of real-world results from day one. The technology used in the array has 100% EU content. The layout of the turbines will be adjusted within the project, enabling array interactions and optimisation to be studied for the first time at a real tidal energy site.
DTOcean: Comparative with design | Documents, reports | 2020-03-11 14:37:17 |
Certification & Warranty Framework | Documents, reports | 2020-03-11 14:37:10 |
Local community engagement strategy | Documents, reports | 2020-03-11 14:37:15 |
Public summary of consenting requirements and process | Documents, reports | 2020-03-11 14:36:54 |
Business Plan Template | Documents, reports | 2020-03-11 14:36:44 |
LCOE & Financial Models | Other | 2020-03-11 14:36:46 |
Array Commercialisation Strategy | Documents, reports | 2020-03-11 14:36:48 |
External project website: mid-term update report | Websites, patent fillings, videos etc. | 2020-03-11 14:36:51 |
Initial Project and European ESEAs | Documents, reports | 2020-03-11 14:37:05 |
Multi-media products launch | Documents, reports | 2019-11-20 12:13:48 |
Training materials | Documents, reports | 2019-11-20 12:13:48 |
Reliability Availability Maintainability (RAM) models for turbines and infrastructure | Documents, reports | 2019-11-20 12:13:48 |
Plan for delivery of the Project and European ESEAs | Documents, reports | 2019-11-20 12:13:48 |
Definition Document of Agreed KPIs | Documents, reports | 2019-11-20 12:13:48 |
Verification Framework | Documents, reports | 2019-11-20 12:13:48 |
Year 1 environmental monitoring public report | Documents, reports | 2019-11-20 12:13:48 |
Initial Decommissioning Plan | Documents, reports | 2019-11-20 12:13:48 |
Conference presentations and papers: summary report | Documents, reports | 2019-11-20 12:13:48 |
DTOcean: Scenario definition & Performance metrics | Other | 2019-11-20 12:13:48 |
Design Failure Mode Effect Analysis for tidal array Report | Documents, reports | 2019-11-20 12:13:48 |
Test plan | Documents, reports | 2019-11-20 12:13:48 |
Decommissioning Lessons Learned Report | Documents, reports | 2019-11-20 12:13:48 |
Data requirements definition and collection plan | Documents, reports | 2019-11-20 12:13:48 |
External project website | Websites, patent fillings, videos etc. | 2019-11-20 12:13:48 |
T1-3 Upgrade report | Documents, reports | 2019-11-20 12:13:48 |
AIM: design report | Documents, reports | 2019-11-20 12:13:48 |
Maintenance Strategy Review (MSR) specification | Documents, reports | 2019-11-20 12:13:48 |
Take a look to the deliverables list in detail: detailed list of EnFAIT deliverables.
year | authors and title | journal | last update |
---|---|---|---|
2019 |
Ellen Jump, Alasdair Macleod, Tom Wills Review of Tidal Turbine Wake Modelling Methods – State of the Art published pages: , ISSN: , DOI: |
2020-03-05 | |
2019 |
Tianna Bloise Thomaz, David Crooks, Encarni Medina-Lopez, Leonore van Velzen, Henry Jeffrey, Joseba Lopez Mendia, Raul Rodriguez Arias, Pablo Ruiz Minguela O&M Models for Ocean Energy Converters: Calibrating through Real Sea Data published pages: 2475, ISSN: 1996-1073, DOI: 10.3390/en12132475 |
Energies 12/13 | 2020-03-05 |
2019 |
Alasdair Macleod, Andrew Watson, David Quantrell, Sam Porteous and Tom Wills Tidal resource, turbine wake and performance modelling on the EnFAIT project published pages: , ISSN: , DOI: |
2020-03-05 | |
2019 |
Tianna Bloise Thomaz, Leonore van Velzen, Henry Jeffrey, Encarni Medina Lopez and Tom Wills Capability Assessment of DTOcean Array Design Tool for Ocean Energy published pages: , ISSN: , DOI: |
2020-03-05 |
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ENFAIT" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "ENFAIT" are provided by the European Opendata Portal: CORDIS opendata.
Hybrid Variable Geometry Ejector Cooling and Heating System for Buildings Driven by Solar and Biomass Heat
Read MoreCost-effective transformation of a Highly-Efficient, Advanced, Thermal Ultra-SuperCritical coal-fired power plant into a CHP by retrofitting and integrating an ARBAFLAME biomass upgrading process.
Read More