Opendata, web and dolomites

EnFAIT SIGNED

Enabling Future Arrays in Tidal

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "EnFAIT" data sheet

The following table provides information about the project.

Coordinator
NOVA INNOVATION LTD 

Organization address
address: 45 TIMBER BUSH
city: EDINBURGH
postcode: EH6 6QH
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website https://www.enfait.eu/
 Total cost 20˙204˙450 €
 EC max contribution 14˙914˙599 € (74%)
 Programme 1. H2020-EU.3.3.2. (Low-cost, low-carbon energy supply)
 Code Call H2020-LCE-2016-RES-IA
 Funding Scheme IA
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2022-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    NOVA INNOVATION LTD UK (EDINBURGH) coordinator 9˙723˙304.00
2    OFFSHORE RENEWABLE ENERGY CATAPULT UK (BLYTH NORTHUMBERLAND) participant 1˙497˙825.00
3    SKF GMBH DE (SCHWEINFURT) participant 1˙220˙992.00
4    THE UNIVERSITY OF EDINBURGH UK (EDINBURGH) participant 1˙073˙790.00
5    AGENCE INTERCOMMUNALE DEDEVELOPPEMENT DES ARRONDISSEMENTSDE TOURNAI D'ATH ET DE COMMUNESAVOISINANTES BE (TOURNAI) participant 397˙827.00
6    WOOD GROUP FRANCE SAS FR (PARIS) participant 341˙355.00
7    JAMES FISHER MARINE SERVICES LIMITED UK (BARROW-IN- FURNESS) participant 303˙318.00
8    RSK ENVIRONNEMENT FR (CLICHY) participant 283˙290.00
9    MOJO MARITIME LIMITED UK (FALMOUTH) participant 72˙896.00
10    ELSA BE (TOURNAI) participant 0.00
11    HMK TECHNICAL SERVICES LIMITED UK (CONGLETON CHESHIRE) participant 0.00

Map

 Project objective

In this flagship project, the EnFAIT (Enabling Future Arrays in Tidal) Team, a partnership of leading European companies, will demonstrate a grid-connected tidal energy array that:

- demonstrates a step change in the lifetime cost of energy for tidal power; - proves that high array reliability & availability can be achieved with best practice maintenance regimes; - captures and disseminates substantial learning on fundamental issues for the ocean energy industry; - builds investor confidence; - takes a huge step towards creating a commercial, bankable tidal energy sector; and - at 6 turbines, will be the largest number of devices ever deployed in an ocean energy array.

This project will build upon an existing operational site, minimising development risk and allowing the generation of real-world results from day one. The technology used in the array has 100% EU content. The layout of the turbines will be adjusted within the project, enabling array interactions and optimisation to be studied for the first time at a real tidal energy site.

 Deliverables

List of deliverables.
DTOcean: Comparative with design Documents, reports 2020-03-11 14:37:17
Certification & Warranty Framework Documents, reports 2020-03-11 14:37:10
Local community engagement strategy Documents, reports 2020-03-11 14:37:15
Public summary of consenting requirements and process Documents, reports 2020-03-11 14:36:54
Business Plan Template Documents, reports 2020-03-11 14:36:44
LCOE & Financial Models Other 2020-03-11 14:36:46
Array Commercialisation Strategy Documents, reports 2020-03-11 14:36:48
External project website: mid-term update report Websites, patent fillings, videos etc. 2020-03-11 14:36:51
Initial Project and European ESEAs Documents, reports 2020-03-11 14:37:05
Multi-media products launch Documents, reports 2019-11-20 12:13:48
Training materials Documents, reports 2019-11-20 12:13:48
Reliability Availability Maintainability (RAM) models for turbines and infrastructure Documents, reports 2019-11-20 12:13:48
Plan for delivery of the Project and European ESEAs Documents, reports 2019-11-20 12:13:48
Definition Document of Agreed KPIs Documents, reports 2019-11-20 12:13:48
Verification Framework Documents, reports 2019-11-20 12:13:48
Year 1 environmental monitoring public report Documents, reports 2019-11-20 12:13:48
Initial Decommissioning Plan Documents, reports 2019-11-20 12:13:48
Conference presentations and papers: summary report Documents, reports 2019-11-20 12:13:48
DTOcean: Scenario definition & Performance metrics Other 2019-11-20 12:13:48
Design Failure Mode Effect Analysis for tidal array Report Documents, reports 2019-11-20 12:13:48
Test plan Documents, reports 2019-11-20 12:13:48
Decommissioning Lessons Learned Report Documents, reports 2019-11-20 12:13:48
Data requirements definition and collection plan Documents, reports 2019-11-20 12:13:48
External project website Websites, patent fillings, videos etc. 2019-11-20 12:13:48
T1-3 Upgrade report Documents, reports 2019-11-20 12:13:48
AIM: design report Documents, reports 2019-11-20 12:13:48
Maintenance Strategy Review (MSR) specification Documents, reports 2019-11-20 12:13:48

Take a look to the deliverables list in detail:  detailed list of EnFAIT deliverables.

 Publications

year authors and title journal last update
List of publications.
2019 Ellen Jump, Alasdair Macleod, Tom Wills
Review of Tidal Turbine Wake Modelling Methods – State of the Art
published pages: , ISSN: , DOI:
2020-03-05
2019 Tianna Bloise Thomaz, David Crooks, Encarni Medina-Lopez, Leonore van Velzen, Henry Jeffrey, Joseba Lopez Mendia, Raul Rodriguez Arias, Pablo Ruiz Minguela
O&M Models for Ocean Energy Converters: Calibrating through Real Sea Data
published pages: 2475, ISSN: 1996-1073, DOI: 10.3390/en12132475
Energies 12/13 2020-03-05
2019 Alasdair Macleod, Andrew Watson, David Quantrell, Sam Porteous and Tom Wills
Tidal resource, turbine wake and performance modelling on the EnFAIT project
published pages: , ISSN: , DOI:
2020-03-05
2019 Tianna Bloise Thomaz, Leonore van Velzen, Henry Jeffrey, Encarni Medina Lopez and Tom Wills
Capability Assessment of DTOcean Array Design Tool for Ocean Energy
published pages: , ISSN: , DOI:
2020-03-05

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ENFAIT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ENFAIT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.2.)

ELEMENT (2019)

Effective Lifetime Extension in the Marine Environment for Tidal Energy

Read More  

Hybrid-BioVGE (2019)

Hybrid Variable Geometry Ejector Cooling and Heating System for Buildings Driven by Solar and Biomass Heat

Read More  

ARBAHEAT (2018)

Cost-effective transformation of a Highly-Efficient, Advanced, Thermal Ultra-SuperCritical coal-fired power plant into a CHP by retrofitting and integrating an ARBAFLAME biomass upgrading process.

Read More