Explore the words cloud of the AdD HyStor project. It provides you a very rough idea of what is the project "AdD HyStor" about.
The following table provides information about the project.
Coordinator |
SCHWUNDGRAD ENERGIE LIMITED
Organization address contact info |
Coordinator Country | Ireland [IE] |
Project website | http://add-hystor.com/ |
Total cost | 3˙909˙663 € |
EC max contribution | 2˙944˙001 € (75%) |
Programme |
1. H2020-EU.3. (PRIORITY 'Societal challenges) 2. H2020-EU.2. (PRIORITY 'Industrial leadership') |
Code Call | H2020-FTIPilot-2016-1 |
Funding Scheme | IA |
Starting year | 2017 |
Duration (year-month-day) | from 2017-03-01 to 2020-08-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | SCHWUNDGRAD ENERGIE LIMITED | IE (Dublin 2) | coordinator | 1˙068˙077.00 |
2 | ADAPTIVE BALANCING POWER GMBH | DE (DARMSTADT) | participant | 835˙397.00 |
3 | THE UNIVERSITY OF SHEFFIELD | UK (SHEFFIELD) | participant | 690˙788.00 |
4 | FREQCON GMBH | DE (WALSRODE) | participant | 349˙737.00 |
Decarbonisation of the world’s energy system is needed to reduce CO2 emissions, ensure energy security and increase sustainability of the world’s natural resources. Renewable energy generation technologies such as solar PV and wind can be used a low carbon alternative. However, the use of these less predictable intermittent renewable technologies can lead to grid instability. As more renewables are connected to the system in line with EU legislation, this will become a critical problem throughout the EU. Grid scale energy storage technologies which can be used to store excess power for times of low generation can mitigate the problem, ensuring a balanced supply of power and utilisation the maximum renewable energy generation capacity. The project will leverage two existing energy storage pilot sites to demonstrate the performance of a European manufactured adaptive-flywheel on the Irish and UK transmission grids. During the project, Schwungrad Energie, Adaptive Balancing Power, University of Sheffield and Freqcon will develop an adaptive flywheel battery hybrid energy storage system for dynamic grid stabilisation for initial deployment within both test grid systems prior to EU commercialisation. The demonstration of its functionality in both grids increases the technology readiness level (TRL) of the adaptive flywheel battery hybrid energy storage system from TRL 6 to TRL 8, which allows commercial application and is a requirement for scaling up of the technology post project. As of 2020, similar dynamic grid stabilisation measures will be needed in the EU as well as in global grids in the medium term. This project gives the consortium a stable foundation to access the dynamic grid stabilisation market on a global scale. This will increase the revenue of all EU based SME’s involved in the project, allow the creation of IP and give a return on investment based on partner profit and EU project contribution of 1183% by 2025.
Commissioning Performance Verification (Rhode) | Documents, reports | 2020-03-03 15:06:26 |
Project Website | Websites, patent fillings, videos etc. | 2020-03-03 15:06:26 |
Take a look to the deliverables list in detail: detailed list of AdD HyStor deliverables.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ADD HYSTOR" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "ADD HYSTOR" are provided by the European Opendata Portal: CORDIS opendata.