Explore the words cloud of the FASE-LAG project. It provides you a very rough idea of what is the project "FASE-LAG" about.
The following table provides information about the project.
Coordinator |
UMBRAGROUP SPA
Organization address contact info |
Coordinator Country | Italy [IT] |
Total cost | 997˙273 € |
EC max contribution | 997˙273 € (100%) |
Programme |
1. H2020-EU.3.4.5.6. (ITD Systems) |
Code Call | H2020-CS2-CFP04-2016-02 |
Funding Scheme | CS2-RIA |
Starting year | 2017 |
Duration (year-month-day) | from 2017-07-01 to 2020-06-30 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | UMBRAGROUP SPA | IT (FOLIGNO PG) | coordinator | 401˙250.00 |
2 | FUNDACION TECNALIA RESEARCH & INNOVATION | ES (DERIO BIZKAIA) | participant | 249˙995.00 |
3 | ITALSYSTEM S.R.L | IT (AVELLINO) | participant | 170˙250.00 |
4 | VGA srl | IT (DERUTA PG) | participant | 95˙750.00 |
5 | MAGNAGHI AERONAUTICA SPA | IT (NAPOLI) | participant | 80˙028.00 |
The adoption of electrical equipment for flight-critical applications in future aircrafts is motivated by a number of economic and environmental considerations. Also thank to several research programs, EMA systems are now viewed as the best candidate for the aircraft of the future because they are: less complex because of the absence of a hydraulic system; better suited to long term storage since there is no leak potential; more energy efficient compared with hydraulic systems; easier to install and maintain (no filtration, no bleeding); less complex to control from a power-distribution and power-management perspective (power is transmitted without mass transfer). The aim of the FASE-LAG project is the development of an electromechanical actuation system (EMAS) for extension-retraction of main and nose landing gears for future SMALL A/C. The EMAS will be characterized by reduced spatial envelope and weight, improved reliability, increased safety margins and testability of the redundant components. In particular, the proposed solution will include key enabling innovative technologies such as: 1) optimized electromechanical actuator (EMA) fail-safe architectures; 2) advanced and reliable electronics; 3) advanced health monitoring system that do not require adding new sensors in the EMA; 4) highly reliable electrical machine with an intrinsic reliable architecture, high performance materials and a fault tolerant design; 5) advanced control algorithms focused on efficiency optimization. The achievement of the targeted TRL5 (technology validated in relevant simulated environment) will be verified at the end of the project according to a validation plan.
Communication, Dissemination and exploitation plan | Documents, reports | 2020-02-14 12:00:43 |
Take a look to the deliverables list in detail: detailed list of FASE-LAG deliverables.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FASE-LAG" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "FASE-LAG" are provided by the European Opendata Portal: CORDIS opendata.