Opendata, web and dolomites

ALDREN project deliverables

The page lists 7 deliverables related to the research project "ALDREN".

 List of Deliverables

ALDREN: list of downloadable deliverables.
title and desprition type last update

ALDREN Methodology note on linking the EVCS to building financial valuation (including the specified annexes).

ALDREN Methodology note on linking the EVCS to building financial valuation (M18; first release at M12, consolidation at M28-30). Protocol document.
NB. This deliverable will also include as annexes: (a) a state of the art and return on experience on some nation-al and local initiatives (ex. Slovakia, also Spain if needed); (b) a description of the integration of complementary indicators in building assets valuation (e.g. energy – health - comfort).

Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-11-2016-2017

download deliverable 

Documents, reports 2019-07-24

ALDREN Methodology note on rendering of the collected data and results in a building passport (including the specified annexes).

ALDREN Methodology note on rendering of the collected data and results in a building passport (M18; first release at M12, consolidation at M28-30). Protocol document.
NB. This deliverable will also include as annexes: (a) a summary of available EPC database, lessons learnt and potential barriers. Report as emerging from the analysis of the available knowledge and information with a focus on the possible links and compatibility with emerging databases at national and European levels; (b) a report: overview on existing dataset and evaluation of the BIM integration; (c) a report on definition of the data model of all the collected knowledge.

Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-11-2016-2017

download deliverable 

Documents, reports 2019-07-24

ALDREN Methodology note on energy rating procedure (including the specified annexes)

ALDREN Methodology note on energy rating procedure (M18; first release at M12, consolidation at M28-30). Protocol document.
NB. This deliverable will also include annexes as a study on energy performance indicators and targets for deep renovation of existing buildings and proposals for methodological integration: methodological integration of the indictors in property managers’ decision process, among the various criteria of building assets evaluation (in-cluding the attractiveness and technical state) (T2.1); proposal for integration of EP indicators in the main result a building passport (T2.6); proposal for integration of EP indicators in asset evaluation (T2.5).

Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-11-2016-2017

download deliverable 

Documents, reports 2019-07-24

Operative website

Operative website

Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-11-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-07-24

ALDREN Methodology note on address-ing health and wellbeing (including the specified annexes).

ALDREN Methodology note on addressing health and wellbeing (M18; first release at M12, consolidation at M28-30). Protocol document.
NB. This deliverable will also include as annexes: (a) a definition of indicators of indoor climate based on review of credits, indicators and approaches to promote indoor climate in existing green programs and certification schemes, as well as prEN 16798; (b) the integration of additional indicators as complementary modules to the EVCS, which can be used for building certification related to indoor environment (covering indoor environmental quality i.e. thermal comfort, indoor air quality, lighting and acoustic); (c) a methodology related to data collation in existing buildings; (d) the assessment of the indoor environment quality before and after renovation.

Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-11-2016-2017

download deliverable 

Documents, reports 2019-07-24

ALDREN Methodology note on addressing the gap between calculated and actual EP (including the specified annexes)

ALDREN Methodology note on addressing the gap between calculated and actual EP (M18; first release at M12, consolidation at M28-30). Protocol document.
NB. This deliverable will also include as annexes: (a) an Excel tool demonstrating a harmonized framework which defines the inputs and outputs for the calculated and verified ECVS which are material to its verification by measurements in each partner country in English and the local language; (b) an Excel tool enabling predicted performance to be compared with measured performance, hence verification of the ECVS performance level.

Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-11-2016-2017

download deliverable 

Documents, reports 2019-07-24

Roadmap for implementation and market uptake of the project results

The roadmap will contain the guidelines for developing a business plan for market deployment.

Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-11-2016-2017

download deliverable 

Documents, reports 2019-07-24