Explore the words cloud of the FLEXITRANSTORE project. It provides you a very rough idea of what is the project "FLEXITRANSTORE" about.
The following table provides information about the project.
Coordinator |
EUROPEAN DYNAMICS BELGIUM
Organization address contact info |
Coordinator Country | Belgium [BE] |
Project website | http://www.flexitranstore.eu |
Total cost | 21˙399˙588 € |
EC max contribution | 17˙008˙101 € (79%) |
Programme |
1. H2020-EU.3.3.4. (A single, smart European electricity grid) |
Code Call | H2020-LCE-2017-SGS |
Funding Scheme | IA |
Starting year | 2017 |
Duration (year-month-day) | from 2017-11-01 to 2021-10-31 |
Take a look of project's partnership.
FLEXITRANSTORE project shall develop a next generation of Flexible Energy Grid (FEG), which provides the technical basis to support the valorisation of flexibility services, enhancing the existing European Internal Energy Market (IEM). This FEG addresses the capability of a power system to maintain continuous service in the face of rapid and large swings in supply or demand, whatever the cause. Thus, a wholesale market infrastructure and new business models within this integrated FEG should be upgraded to network players, incentivize new ones to join, while demonstrating new business perspectives for cross border resources management and energy trading. The strategic objectives of FLEXITRANSTORE are: to enhance and accelerate the integration of renewables into European energy systems and to increase cross border electricity flows across Europe. Flexibility is one of the keys to meeting these strategic objectives. A range of state-of-the-art ICT technologies / control improvements will be exploited to enhance the flexibility of this novel energy grid while increasing the utility of the existing infrastructure by integrating storage and demand response management. From a market perspective, state-of-the-art ICT technologies / control improvements will be applied to develop an enhanced market model on an integrated platform, for flexibility services and to support cross border auctioning and trading of energy. The FEG components and the digital market infrastructure will be deployed in 8 Demonstrations which will take place in 6 countries (Greece, Bulgaria, Cyprus, Slovenia, Belgium, Spain), focusing on illustrating specific functions and serving real needs and existing challenges.
Web Portal | Documents, reports | 2020-04-14 16:29:12 |
Take a look to the deliverables list in detail: detailed list of FLEXITRANSTORE deliverables.
year | authors and title | journal | last update |
---|---|---|---|
2019 |
B. Németh PhD, G. Göcsei PhD , D. Szabó, L. Rácz Comparison of physical and analytical methods for Dynamic Line Rating (DLR) calculations published pages: , ISSN: , DOI: |
Cigre-IEC | 2020-04-14 |
2018 |
Markos Asprou, Elias Kyriakides, Mihaela M. Albu Uncertainty Bounds of Transmission Line Parameters Estimated From Synchronized Measurements published pages: 1-11, ISSN: 0018-9456, DOI: 10.1109/tim.2018.2867966 |
IEEE Transactions on Instrumentation and Measurement | 2020-04-14 |
2019 |
Joan Rocabert, Ruben Capo-Misut, Raul Santiago Munoz-Aguilar, Jose Ignacio Candela, Pedro Rodriguez Control of Energy Storage System Integrating Electrochemical Batteries and Supercapacitors for Grid-Connected Applications published pages: 1853-1862, ISSN: 0093-9994, DOI: 10.1109/tia.2018.2873534 |
IEEE Transactions on Industry Applications 55/2 | 2020-04-14 |
2018 |
Levente Rácz, Bálint Németh Investigation of dynamic electricity line rating based on neural networks published pages: , ISSN: 0235-7208, DOI: 10.6001/energetika.v64i2.3781 |
Energetika 64/2 | 2020-04-14 |
2019 |
Levente Rácz, Bálint Németh Dynamic Line Rating published pages: , ISSN: , DOI: |
KLENEN Conference | 2020-04-14 |
2019 |
M. Monadi, H. Hooshyar, L. Vanfretti, F. Mahmood, J. I. Candela and P. Rodriguez Measurement-based Network Clustering for Active Distribution Systems published pages: , ISSN: 1949-3053, DOI: 10.1109/tsg.2019.2910510 |
IEEE Transactions on Smart Grid | 2020-04-14 |
2018 |
Dávid Szabó, Levente Rácz, Gábor Göcsei, Bálint Németh Comparison of physical and soft-computing models using DLR technology published pages: , ISSN: , DOI: |
VIII. MAIT Conference | 2020-04-14 |
2018 |
Stoyan Bozhkov, Valeri Mladenov Models for forecasting the transmission capability oh high voltage air lines published pages: , ISSN: , DOI: |
Bulef Conference ‘18 | 2020-04-14 |
2019 |
Mohamed Atef Elsaharty, Alvaro Luna, Jose Ignacio Candela, Pedro Rodriguez A Unified Power Flow Controller Using a Power Electronics Integrated Transformer published pages: 828-839, ISSN: 0885-8977, DOI: 10.1109/tpwrd.2019.2897601 |
IEEE Transactions on Power Delivery 34/3 | 2020-04-14 |
2018 |
Valeri Mladenov, Vesselin Chobanov, Elias Zafiropoulos, Vasiliki Vita Flexibility issues in EU, Bulgarian and Greek power networks published pages: , ISSN: , DOI: |
Second South East European Regional CIGRÉ Conference, Kyiv 2018 | 2020-04-14 |
2018 |
V. LOVRENCÌŒICÌ, M. JARC, A. IVEC, M. KOVACÌŒ, N. GUBELJAK, B. NEMETH, G. GOCSEI, U. KRISPER Advanced prevention against icing on high voltage power lines published pages: 73-85, ISSN: , DOI: |
Second South East European Regional CIGRÉ Conference, Kyiv 2018 2-64, 2018 | 2020-04-14 |
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FLEXITRANSTORE" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "FLEXITRANSTORE" are provided by the European Opendata Portal: CORDIS opendata.