Opendata, web and dolomites

DINTRA SIGNED

Innovative railway sleeper design increasing track lateral resistance, reducing significantly costs related to track misalignment events

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "DINTRA" data sheet

The following table provides information about the project.

Coordinator
AGRUPACION CANTABRA DE CONSTRUCCION E INGENIERIA SA 

Organization address
address: POLIGONO INDUSTRIAL DE BARROS, C/ALFONSO ALVAREZ MIRANDA N 11 C
city: LOS CORRALES DE BUELNA
postcode: 39408
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://accisa.es/en/idi/
 Total cost 1˙938˙093 €
 EC max contribution 1˙356˙656 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-12-01   to  2020-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AGRUPACION CANTABRA DE CONSTRUCCION E INGENIERIA SA ES (LOS CORRALES DE BUELNA) coordinator 1˙356˙656.00

Map

 Project objective

Railway track lateral movement occurs when lateral resistance is not enough hold track in place. This movement is known as track misalignment (when it is a progressive defect associated to train loads) or track buckle (when it is an abrupt event associated mainly to unusually high temperatures).Track alignment must be restored as even small track misalignments induce additional dynamic forces in the vehicle. Track maintenance operations to restore track alignment (tamping) require 26% of track maintenance and renewal cost (2.989M€/year in Europe). Besides, cost of rail grinding and renewal operations are estimated to be around 10% of total EU railway maintenance and renewal costs (1.118M€/year). Moreover track misalignment eventually causes a great risk of derailment. It is estimated that around 25% of train derailments are due to track geometry deterioration, causing on average 18 derailment per year in Europe with an associated economic loss of 32M€, not considering the potential human losses. To solve this situation, ACCISA has developed DINTRA sleepers, and innovative solution capable of increasing significantly track lateral resistance. Reduction of track maintenance and renewal cost and track buckle events and derailments due to track misalignment will be experienced. DINTRA sleepers have a low implementation cost and no need of extra calculation or new equipment for their implementation. Our overall objective with the present project is to industrialize the production process of DINTRA sleeper to introduce them into the international market through the construction of three advanced demonstration element in the most complex and demanding conditions. When implementing DINTRA sleepers, railway infrastructure managers will save over 978M€ in track maintenance and renewal cost during the life span of the product (40 years), while only investing 53.7M€. DINTRA sleepers will lead to 13.7M€ of benefits for ACCISA by the 5th year.

 Deliverables

List of deliverables.
D5.2(i) Project communication and dissemination plan and Report of completed and planned dissemination and communication activities Open Research Data Pilot 2020-01-30 10:21:27

Take a look to the deliverables list in detail:  detailed list of DINTRA deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DINTRA" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "DINTRA" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Zbox (2018)

ZBOX: THE NEXT GENERATION OF FOLDABLE CONTAINERS

Read More  

NANOL4TP (2018)

Decreasing fuel consumption in transport

Read More  

LEDVAR-Z (2018)

A New Paradigm for Efficient and Modern Rail Signalling

Read More