Explore the words cloud of the DINTRA project. It provides you a very rough idea of what is the project "DINTRA" about.
The following table provides information about the project.
Coordinator |
AGRUPACION CANTABRA DE CONSTRUCCION E INGENIERIA SA
Organization address contact info |
Coordinator Country | Spain [ES] |
Project website | http://accisa.es/en/idi/ |
Total cost | 1˙938˙093 € |
EC max contribution | 1˙356˙656 € (70%) |
Programme |
1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport) 2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT)) 3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument) |
Code Call | H2020-SMEINST-2-2016-2017 |
Funding Scheme | SME-2 |
Starting year | 2017 |
Duration (year-month-day) | from 2017-12-01 to 2020-05-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | AGRUPACION CANTABRA DE CONSTRUCCION E INGENIERIA SA | ES (LOS CORRALES DE BUELNA) | coordinator | 1˙356˙656.00 |
Railway track lateral movement occurs when lateral resistance is not enough hold track in place. This movement is known as track misalignment (when it is a progressive defect associated to train loads) or track buckle (when it is an abrupt event associated mainly to unusually high temperatures).Track alignment must be restored as even small track misalignments induce additional dynamic forces in the vehicle. Track maintenance operations to restore track alignment (tamping) require 26% of track maintenance and renewal cost (2.989M€/year in Europe). Besides, cost of rail grinding and renewal operations are estimated to be around 10% of total EU railway maintenance and renewal costs (1.118M€/year). Moreover track misalignment eventually causes a great risk of derailment. It is estimated that around 25% of train derailments are due to track geometry deterioration, causing on average 18 derailment per year in Europe with an associated economic loss of 32M€, not considering the potential human losses. To solve this situation, ACCISA has developed DINTRA sleepers, and innovative solution capable of increasing significantly track lateral resistance. Reduction of track maintenance and renewal cost and track buckle events and derailments due to track misalignment will be experienced. DINTRA sleepers have a low implementation cost and no need of extra calculation or new equipment for their implementation. Our overall objective with the present project is to industrialize the production process of DINTRA sleeper to introduce them into the international market through the construction of three advanced demonstration element in the most complex and demanding conditions. When implementing DINTRA sleepers, railway infrastructure managers will save over 978M€ in track maintenance and renewal cost during the life span of the product (40 years), while only investing 53.7M€. DINTRA sleepers will lead to 13.7M€ of benefits for ACCISA by the 5th year.
D5.2(i) Project communication and dissemination plan and Report of completed and planned dissemination and communication activities | Open Research Data Pilot | 2020-01-30 10:21:27 |
Take a look to the deliverables list in detail: detailed list of DINTRA deliverables.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DINTRA" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "DINTRA" are provided by the European Opendata Portal: CORDIS opendata.