Opendata, web and dolomites

POWERSWAP SIGNED

Fully robotic system for swapping electric car batteries within 3 minutes.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 POWERSWAP project word cloud

Explore the words cloud of the POWERSWAP project. It provides you a very rough idea of what is the project "POWERSWAP" about.

batteries    infrastructure    transport    mobility    healthy    uninterrupted    flexibly    services    energy    battery    global    charging    china    peak    encourage    wind    pressure    environment    chinese    players    grow    grid    accelerating    car    reaching    powerswap    bit    taxi    distributed    vast    our    jobs    social    engines    definite    storage    stimulate    company    smart    group    swap    solar    boost    demonstration    robotic    added    balancing    employment    return    lengthens    engaged    bold    stockholm    renault    harmonious    smaller    ders    28m    didi    electric    transportation    lifetime    efficient    ev    turnover    200    zoe    sme    give    proprietary    kilo    urban    market    off    minutes    minimizing    automated    combustion    power    suitable    sources    time    huge    2024    network    surges    cars    clean    storages    amount    additional    elimination    puts    synchronization    saving    sound    supplier    green   

Project "POWERSWAP" data sheet

The following table provides information about the project.

Coordinator
POWERSWAP AB 

Organization address
address: BOX 24 137
city: STOCKHOLM
postcode: 104 51
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.powerswap.se
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-03-01   to  2018-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    POWERSWAP AB SE (STOCKHOLM) coordinator 50˙000.00

Map

 Project objective

Our proprietary robotic technology can swap the 200 kilo car battery in a bit more than 2 minutes, saving vast amount of time and ensuring uninterrupted mobility. Batteries go to the battery storage where they can get suitable time for a harmonious charging at peak-off time. This lengthens their lifetime and puts much smaller pressure on the electric grid, allowing for the efficient management of power system and smart synchronization with distributed green energy resources (DERs) in power grid. Powerswap makes the bold step forward addressing challenges related to smart and clean e-mobility as charging time of batteries in battery storage can be flexibly adapted, minimizing additional pressure on power systems. Our automated batteries storages can also provide “grid balancing” services and return power to the grid at a time when managing the network is becoming increasingly complex as variable sources of wind and solar power grow. Our project will have a huge social added value by creating healthy urban environment and accelerating the development of clean transport systems based on electric cars. Powerswap will give the EU EV infrastructure a major boost and encourage new surges in EV transportation leading to definite elimination of combustion engines. We have engaged in the project well-known global market players: Renault (Renault Zoe), Sound Group (major supplier of batteries in China), Taxi Stockholm (will use our cars in the demonstration phase) and Didi (Chinese smart transportation company). The project will also have a vast impact on the applying SME and will stimulate its growth with a potential of reaching a turnover of €28M for in year 2024, and increasing employment by 40 jobs in the same year.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "POWERSWAP" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "POWERSWAP" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Zbox (2018)

ZBOX: THE NEXT GENERATION OF FOLDABLE CONTAINERS

Read More  

NANOL4TP (2018)

Decreasing fuel consumption in transport

Read More  

LEDVAR-Z (2018)

A New Paradigm for Efficient and Modern Rail Signalling

Read More