Project "FLEXIGRID" data sheet

The following table provides information about the project.

Coordinator
FUNDACION CIRCE CENTRO DE INVESTIGACION DE RECURSOS Y CONSUMOS ENERGETICOS 

Organization address
address: PARQUE EMPRESARIAL DINAMIZA, AVDA. DE RANILLAS, 3D
city: ZARAGOZA
postcode: 50018
website: www.fcirce.es

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Total cost 8˙541˙073 €
 EC max contribution 6˙865˙458 € (80%)
 Programme 1. H2020-EU.3.3.4. (A single, smart European electricity grid)
 Code Call H2020-LC-SC3-2019-ES-SCC
 Funding Scheme IA
 Starting year 2019
 Duration (year-month-day) from 2019-10-01   to  2023-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FUNDACION CIRCE CENTRO DE INVESTIGACION DE RECURSOS Y CONSUMOS ENERGETICOS ES (ZARAGOZA) coordinator 1˙098˙125.00
2    ORMAZABAL PROTECTION AND AUTOMATION SL ES (IGORRE BIZKAIA) participant 641˙862.00
3    ELIN VERD ANONYMI ETAIRIA AEIFORONPROIONTON KAI YPIRESION EL (KIFISSIA ATHINA) participant 616˙000.00
4    EDYNA SRL IT (BOLZANO) participant 523˙483.00
5    FONDAZIONE LINKS - LEADING INNOVATION & KNOWLEDGE FOR SOCIETY IT (TORINO) participant 482˙500.00
6    ZIV APLICACIONES Y TECNOLOGIA SL ES (ZAMUDIO) participant 471˙505.00
7    SVEUCILISTE U ZAGREBU FAKULTET ELEKTROTEHNIKE I RACUNARSTVA HR (ZAGREB) participant 448˙125.00
8    HYPERTECH (CHAIPERTEK) ANONYMOS VIOMICHANIKI EMPORIKI ETAIREIA PLIROFORIKIS KAI NEON TECHNOLOGION EL (CHALANDRI ATHINA) participant 389˙046.00
9    ATOS SPAIN SA ES (MADRID) participant 365˙750.00
10    IOANNIS SARANTIS-TOURISTIKAI-XENODOCHEIAKAI-KTIMATIKAI-TECHNIKAI KAI GENIKAI EPICHEIRISEIS ANONYMOS ETAIRIA EL (THASOS) participant 304˙631.00
11    CAPENERGIES ASSOCIATION FR (AIX EN PROVENCE CEDEX 4) participant 285˙611.00
12    HEP-OPERATOR DISTRIBUCIJSKOG SUSTAVA DOO ZA DISTRIBUCIJU I OPSKRBU ELEKTRICNE ENERGIJED.O.O. HR (ZAGREB) participant 274˙750.00
13    SELTA SPA IT (MILANO) participant 265˙125.00
14    VIESGO DISTRIBUCION ELECTRICA SL ES (SANTANDER) participant 263˙130.00
15    UNIVERSIDAD DE CANTABRIA ES (SANTANDER) participant 232˙500.00
16    CONFEDERATION EUROPEENNE DES DISTRIBUTEURS PUBLICS CUMMUNAUX D ENERGIE BE (BRUSSELS) participant 203˙312.00

Map

 Project objective

The expected increasing share of variable RES is challenging the electric grid in terms of reliability, stability and security of supply. Indeed, the European renewable target for 2030 (32% of total energy consumed) means that more than 50% of electricity will be generated from RES, most of which will be connected to the MV and LV grids. As an answer to these present and incoming challenges, FLEXIGRID project proposes to improve the distribution grid operation making it more flexible, reliable and cost-efficient, through the development of 4 HW and 4 SW solutions. Furthermore, a single open source platform will integrate the different solutions making them interoperable with the IT systems used by the energy stakeholders, increasing its replication potential. With the aim of increasing the project’s replication potential, 8 use cases have been identified to address EU most common distribution grid problems. These use cases are represented by 4 complementary demo-sites ready to upgrade FLEXIGRID solutions towards TRL8: a rural and peri-urban network in Spain with a RES share of 39%; a resort in the Greek Island of Thasos able to integrate 10% of RES; an urban grid in the city of Zagreb with congested areas, and an isolated valley in the South-Tyrol region of Italy with more than 50% of hydroelectric energy. To reach the project objectives, the consortium counts with partners representing all the energy system value-chain. In this sense, 2 RTOs and 2 Universities will work together with 5 technology providers to develop the project solutions and deploy them in the four demo-sites, represented by 3 DSOs and 2 large companies. Finally, 2 associations will ensure the exploitation and dissemination of the project results along the EU energy community. Finally, FLEXIGRID will support the ‘Clean Energy for All’ Europeans package while actively cooperating with BRIDGE initiative thanks to the presence of the consortium in 10 of its projects

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FLEXIGRID" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "FLEXIGRID" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.4.)

TRINITY (2019)

TRansmission system enhancement of regIoNal borders by means of IntellIgenT market technologY

Read More  

CompBat (2020)

Computer aided desing for next generation flow batteries

Read More  

FEVER (2020)

Flexible Energy Production, Demand and Storage-based Virtual Power Plants for Electricity Markets and Resilient DSO Operation

Read More