Opendata, web and dolomites

BISANCE SIGNED

Biphasic Heat Transport integration for efficient heat exchange within Composite materials Nacelle

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "BISANCE" data sheet

The following table provides information about the project.

Coordinator
SOCIETE NATIONALE DE CONSTRUCTION AEROSPATIALE SONACA SA 

Organization address
address: ROUTE NATIONALE CINQ PARK INDUSTRIEL
city: GOSSELIES
postcode: 6041
website: www.sonaca.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Belgium [BE]
 Total cost 843˙302 €
 EC max contribution 843˙302 € (100%)
 Programme 1. H2020-EU.3.4.5.4. (ITD Airframe)
 Code Call H2020-CS2-CFP09-2018-02
 Funding Scheme CS2-RIA
 Starting year 2019
 Duration (year-month-day) from 2019-10-01   to  2022-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SOCIETE NATIONALE DE CONSTRUCTION AEROSPATIALE SONACA SA BE (GOSSELIES) coordinator 459˙996.00
2    CALYOS BE (NIVELLES) participant 243˙306.00
3    RTA RAIL TEC ARSENAL FAHRZEUGVERSUCHSANLAGE GMBH AT (WIEN) participant 140˙000.00

Map

 Project objective

BISANCE intends at defining a biphasic system integrated into a full composite nacelle and engine air intake. The biphasic system aims at decreasing significantly the weight, the environmatal footprint as well as the space allocated by the current active systems for the cooling of the engine oil and for the energy supply of th ice protection systems. These both active systems (needing external power) will be replaced by a biphasic passive system (autonomous with no need of external power) which will extract the energy from the engine oil and transfer it to the ice protected surfaces. The objective of the project is thus to decrease the weight by 25kg for the two nacelles of a turboprop A/C, to decrease the CO2 emissions by almost 900 000 kg per AC life and to save 200 000$ of operating costs per AC life. The project will be divided into 5 workpackages along 30 months. The first step intends at defining the specifications and the requirements of the product. Based on the requirements, several concepts of system integration into the structure will be proposed and manufactured for selecting the most promising one. Qualification tests are expected for characterizing the structural resistance and stifness of the concept, for verifying the resistance to heat cycles and to impacts. Finally a fulls scale demonstrator will be manufactured for testing it in icing Wind tunnel. The project will be coordinated by Sonaca, also in charge of the structural developments, in association with Calyos, in charge of the system developments and with RTA in charge of performing the icing wind tunnel testing.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "BISANCE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "BISANCE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.5.4.)

TREAL (2019)

Thermoplastic material allowable generation using a reliability-based virtual modeling platform

Read More  

HEFESTO (2018)

Helicopter Engine Deck - Multifunctional layered insulation for CFRP fire andthermal protection

Read More  

WELTMAP (2019)

Wheel Lightweight Manufacturing Process

Read More