Explore the words cloud of the COOLWIND project. It provides you a very rough idea of what is the project "COOLWIND" about.
The following table provides information about the project.
Coordinator |
FUTURE TECHNOLOGY AS
Organization address contact info |
Coordinator Country | Norway [NO] |
Total cost | 3˙575˙000 € |
EC max contribution | 2˙499˙999 € (70%) |
Programme |
1. H2020-EU.3. (PRIORITY 'Societal challenges) 2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs) 3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies) |
Code Call | H2020-SMEInst-2018-2020-2 |
Funding Scheme | SME-2 |
Starting year | 2019 |
Duration (year-month-day) | from 2019-10-01 to 2022-09-30 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | FUTURE TECHNOLOGY AS | NO (SANDEFJORD) | coordinator | 2˙499˙999.00 |
Offshore wind (OW) is a key technology in reaching the EUs and UNs ambitions for sustainable energy production. One of the remaining challenges in making OW financially, technically and environmentally viable is reduction of operational cost. In OW the electrical power is transmitted to shore with high voltage technology. A major challenge is the heat generation in the transformer platform that must be removed. The current State-of-the-art cooling solution is to pump seawater up to the platform using electrical pumps and pass seawater through heat exchangers to chill the cooling loop connected to the rectifiers. This is power consuming, brings in particles from the seawater which is causing frequent clogging of filters and gives high maintenance cost for the operator. Chlorination of the seawater is environmentally challenging.
Future Technology(FT), the Norwegian SME company behind the COOLWIND project solves this by introducing the unique patented subsea cooler FSCC® (Future Subsea Controllable Cooler). Instead of pumping cold seawater to the transformer platform, heated water from the converters is circulated and chilled in a subsea mounted cooler. FT proposes by this SME Instruments project to industrialize the prototype FSCC® from current TRL6 to TRL9, to reduce operating cost for the OW platform operators. Estimates show that up to 3GWh and 1M€/year may be saved.
The following benefits are identified compared to conventional systems:
No seawater pumps, No filters, No heat exchanger with seawater cooling medium, No expensive salt water piping, No chlorination of seawater/environmental pollution, Less power consumption and Less environmental emission.
All international operators show great interest in pursuing this new technology to benefit from the savings and 2 have already signed LOIs with FT.
FT is an SME having a strong team of 32 experts with years of experience from offshore energy projects and close cooperation with vital important subcontractors.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "COOLWIND" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "COOLWIND" are provided by the European Opendata Portal: CORDIS opendata.