Coordinatore | BMT GROUP LIMITED
Organization address
address: WALDEGRAVE ROAD 1 ORLANDO HOUSE contact info |
Nazionalità Coordinatore | United Kingdom [UK] |
Totale costo | 3˙108˙537 € |
EC contributo | 2˙161˙722 € |
Programma | FP7-TRANSPORT
Specific Programme "Cooperation": Transport (including Aeronautics) |
Code Call | FP7-SST-2010-RTD-1 |
Funding Scheme | CP-FP |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-11-01 - 2014-10-31 |
# | ||||
---|---|---|---|---|
1 |
BMT GROUP LIMITED
Organization address
address: WALDEGRAVE ROAD 1 ORLANDO HOUSE contact info |
UK (TEDDINGTON) | coordinator | 434˙800.50 |
2 |
UNIVERSITY OF GREENWICH
Organization address
address: "Old Royal Naval College, Park Row, Greenwich" contact info |
UK (LONDON) | participant | 620˙137.70 |
3 |
Ferrocarrils de la Generalitat de Catalunya
Organization address
address: Carrer del Cardenal Sentmenat 4 contact info |
ES (Barcelona) | participant | 321˙180.00 |
4 |
VISION SEMANTICS LIMITED
Organization address
address: MILE END ROAD 327 contact info |
UK (LONDON) | participant | 270˙018.28 |
5 |
EVACLITE LIMITED
Organization address
address: NEWHAVENENTERPRISE CENTRE 19 contact info |
UK (NEWHAVEN) | participant | 228˙921.60 |
6 |
KINGFELL BULGARIA EOOD
Organization address
address: UL. STARA PLANINA 14 contact info |
BG (Plovdiv) | participant | 149˙125.38 |
7 |
HOCHIKI EUROPE (U.K.) Ltd
Organization address
address: GROSVENOR ROAD GILLINGHAM BUSINESS PARK contact info |
UK (Gillingham) | participant | 101˙444.83 |
8 |
LONDON UNDERGROUND LIMITED
Organization address
address: "Broadway, 55" contact info |
UK (LONDON) | participant | 35˙000.36 |
9 |
BMT TECHMAR NV
Organization address
address: KAPELSESTEENWEG 286 contact info |
BE (BRASSCHAAT) | participant | 1˙093.37 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Efficient evacuation from transport terminals is usually constrained by a lack of detailed knowledge of the geometry. In most cases, the population attempts to evacuate via the way they entered, bypassing or ignoring emergency exits. In serious fires, the inability to locate emergency exits can lead to loss of life as in the Kings Cross Underground Station (1988) and Düsseldorf airport (1996) fires. While terminal staff attempt to direct passengers to the most appropriate exits, they cannot be everywhere throughout the station and they may not be able to reach the population quickly enough. Throughout the world, emergency signage has traditionally been used to address this problem. However, recent research has shown that only 38% of people ‘see’ evacuation signage, even if the sign is located directly in front of them and their vision is unobstructed. GETAWAY will tackle this problem through the design and development of an Intelligent Active Dynamic Signage System (IADSS). Through the introduction of lit, flashing and running signs, the traditional static emergency sign will transformed into a Dynamic Signage System. The increased affordance offered by the DSS will significantly increase the detectability of the emergency exit sign. By linking the DSS to the alarm system, the DSS will only be activated when needed, thereby overcoming the ‘learnt irrelevance’ of emergency signs. Finally, the Active Dynamic Signage System will be linked to an automated system utilising evacuation simulation, CCTV footage and Fire Detection System information to determine the optimal evacuation route as the fire develops, bringing Intelligence to the ADSS. IADSS enables the terminal Incident Manager to direct passengers to the optimal egress route by activating the appropriate signs within the ADSS. The IADSS will be tested and validated through trials in the London Underground and Barcelona Metro. GETAWAY will bring the humble emergency exit sign into the 21st Century.'
Smarter signage and a decision-support system for emergencies in railways and metro stations will help users get to safety more quickly.
"Research into effects on cognitive performance of maritime watch-keepers under different watch patterns, workloads & conditions, with reality usage of ships bridge, engine & cargo control simulators"
Read More