Coordinatore | ETRA INVESTIGACION Y DESARROLLO SA
Organization address
address: Tres Forques 147 contact info |
Nazionalità Coordinatore | Spain [ES] |
Totale costo | 2˙719˙517 € |
EC contributo | 1˙800˙000 € |
Programma | FP7-ICT
Specific Programme "Cooperation": Information and communication technologies |
Code Call | FP7-2011-NMP-ENV-ENERGY-ICT-EeB |
Funding Scheme | CP |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-10-01 - 2014-06-30 |
# | ||||
---|---|---|---|---|
1 |
ETRA INVESTIGACION Y DESARROLLO SA
Organization address
address: Tres Forques 147 contact info |
ES (Valencia) | coordinator | 0.00 |
2 |
Nome Ente NON disponibile
Organization address
address: REC IND COLONIA GUELL ED TINT VELL CALLE C 24 contact info |
ES (SANTA COLOMA DE CERVELLO) | participant | 0.00 |
3 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: HANSASTRASSE 27C contact info |
DE (MUNCHEN) | participant | 0.00 |
4 |
FUNDACIO PRIVADA BARCELONA DIGITAL CENTRE TECNOLOGIC
Organization address
address: CARRER ROC BORONAT 117, 5 PLANTA contact info |
ES (Barcelona) | participant | 0.00 |
5 |
INSTITUTE OF COMMUNICATION AND COMPUTER SYSTEMS
Organization address
address: Patission Str. 42 contact info |
EL (ATHINA) | participant | 0.00 |
6 |
Thales Italia spa
Organization address
address: VIA PROVINCIALE LUCCHESE 33 contact info |
IT (SESTO FIORENTINO) | participant | 0.00 |
7 |
UNIVERSITA DEL SALENTO
Organization address
address: PIAZZA TANCREDI 7 contact info |
IT (LECCE) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
BEAMS strategic goal is the development of an advanced, integrated management system which enables energy efficiency in buildings and special infrastructures from a holistic perspective (i.e. considering the indoors areas, the public spaces around the facility and the interaction of the overall compound with the grid and urban network outside it).nThe project will include an open interoperability gateway allowing the management of diverse, heterogeneous sources and loads, some of them typically present nowadays in spaces of public use (e.g. public lighting, ventilation, air conditioning), some others emergent and to be widespread over the next years (e.g. renewable sources, electric vehicles).nThese general goals translate into a set of spedific objectives:n1.tSpecification of requirements, use-cases and architectures.n2.tDefinition of common ontology, information models and interfaces to facilitate deployment and adoption by end-user, operators, ESCOs, etc.n3.tInclusion of greening energy positive tools.n4.tDevelopment of a flexible open gateway to interact with ICT solutions from different vendors.n5.tDesign and Implementation of a FAcility Management Environment including:na.tSmart Control Algorithm with learning capabilities.nb.tDecision Support and Simulation tool.nc.tEnergy Efficiency Balanced Score Card.n6.tDemonstration of the project results in two different pilot sites:na.tThe Stadium of the Football Club Barcelona in Spain.nb.tThe campus of the University of Salento in Italy.n7.tEvaluation and Assessment by means of a thorough methodology of the amount of energy and CO2 emissions saved through the deployment of BEAMS technology.nThe focus of BEAMS will not be so much to develop breakthrough technologies from scratch but to integrate different technologies so that their combined use leads to increased energy savings and CO2 reduction. This will allow having a rapid impact on the market, in the spirit of the European Economic Recovery Plan 2010-2013.
INtegration of technological Solutions for Imaging, Detection, and Digitisation of hidden Elements in artworks
Read More