Coordinatore | PRIMA INDUSTRIE SPA
Organization address
address: VIA ANTONELLI 32 contact info |
Nazionalità Coordinatore | Italy [IT] |
Totale costo | 7˙223˙909 € |
EC contributo | 4˙999˙887 € |
Programma | FP7-NMP
Specific Programme "Cooperation": Nanosciences, Nanotechnologies, Materials and new Production Technologies |
Code Call | FP7-2011-NMP-ICT-FoF |
Funding Scheme | CP-IP |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-10-17 - 2014-10-16 |
# | ||||
---|---|---|---|---|
1 |
PRIMA INDUSTRIE SPA
Organization address
address: VIA ANTONELLI 32 contact info |
IT (COLLEGNO) | coordinator | 366˙880.00 |
2 |
UNIVERSITY OF PATRAS
Organization address
address: UNIVERSITY CAMPUS RIO PATRAS contact info |
EL (RIO PATRAS) | participant | 899˙800.00 |
3 |
IDEKO S COOP
Organization address
address: Arriaga Kalea 2 contact info |
ES (ELGOIBAR) | participant | 459˙108.00 |
4 |
FINN-POWER OY
Organization address
address: PL 38 contact info |
FI (KAUHAVA) | participant | 431˙225.00 |
5 |
CONSIGLIO NAZIONALE DELLE RICERCHE
Organization address
address: Piazzale Aldo Moro 7 contact info |
IT (ROMA) | participant | 363˙137.00 |
6 |
CADCAMATION KMR SA
Organization address
address: Route de Chancy 103 contact info |
CH (Onex) | participant | 360˙280.00 |
7 |
CENTRO RICERCHE FIAT SCPA
Organization address
address: Strada Torino 50 contact info |
IT (ORBASSANO) | participant | 355˙000.00 |
8 |
Teknologian tutkimuskeskus VTT Oy
Organization address
address: Vuorimiehentie 3 contact info |
FI (Espoo) | participant | 336˙280.00 |
9 |
TEKS SARL
Organization address
address: "RUE DU PRAYA, LES TOITS BLANCS 23" contact info |
FR (MONTGENEVRE) | participant | 301˙600.00 |
10 |
THE UNIVERSITY OF SHEFFIELD
Organization address
address: FIRTH COURT WESTERN BANK contact info |
UK (SHEFFIELD) | participant | 243˙600.00 |
11 |
SYM VOULOI KAI PROIONTA LOGISMIKOU AE
Organization address
address: Michalakopoulou Str 64 contact info |
EL (Athens) | participant | 177˙410.00 |
12 |
Gigant Italia S.r.L.
Organization address
address: VIA BARGELLINO 25 contact info |
IT (CALDERARA DI RENO BOLOGNA) | participant | 156˙900.00 |
13 |
NEWBURGH ENGINEERING CO LIMITED
Organization address
address: BESSEMER WAY contact info |
UK (ROTHERHAM) | participant | 140˙400.00 |
14 |
INNOVAZIONE AUTOMOTIVE E METALMECCANICA SCRL
Organization address
address: VIA NAZIONALE SNC contact info |
IT (SANTA MARIA IMBARO) | participant | 110˙730.00 |
15 |
DEBBACHE-LAGIOS EE
Organization address
address: A METAXA 19 contact info |
EL (ATHINA) | participant | 104˙700.00 |
16 |
"Gorenje Orodjarna, d.o.o., Velenje, Partizanska 12"
Organization address
address: Partizanska cesta 12 contact info |
SI (Velenje) | participant | 77˙277.00 |
17 |
EXALCO ANONIMI ETAIRIA BIOMHCHANIA ALOYMINIOY
Organization address
address: 5 KM LARISSAS ATHINA contact info |
EL (LARISSA) | participant | 58˙800.00 |
18 |
UNIVERSITA DEGLI STUDI DI L'AQUILA
Organization address
address: PIAZZA VINCENZO RIVERA 1 contact info |
IT (L'AQUILA) | participant | 56˙760.00 |
19 |
TEKNOLOGIAN TUTKIMUSKESKUS VTT
Organization address
address: TEKNIIKANTIE 4 A contact info |
FI (ESPOO) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Today’s manufacturing plants provide a number of different processing possibilities for manufacturing a specific product. Each one of these processing possibilities poses different advantages and limitations that are function of both geometry and lot size of the part to be manufactured. However, one of the main driving forces in today’s production is the environmental friendliness and the energy efficiency of the production itself. Additionally, the manufacturing processes are needed to be able to quickly shift between diverse manufacturing operations with short transfer, program and set-up times without compromises to quality, reliability and life-cycle costs. In the proposed project the main object is the development of manufacturing systems that will be highly flexible, and, at the same time, closely adapted to the single product. These manufacturing systems need for an engineering tool able to cover the whole plant operation, from the overall planning of the plant operation (such as the routes that the product follow within the plant and the scheduling of the production) down to the individual process programming (such as process operation, energy efficiency etc). The process planning approach of today is based on expert systems that are able to propose alternative process plans for the manufacturing of a specific product. Additionally there are tools able to simulate the operation of each machine station both from technological (process parameters, energy efficiency, etc) and economical point of view. All of the available systems though are able to cover only portion of the production, requiring exchange of data between different systems and thus making the overall optimization of the plant operation a hard task. The proposed project will deliver a manufacturing planning decision support tool for the optimization of the plant operation that will be able to be used from the conceptual phase of the product to the final dispatch of the product to the customer.'