Coordinatore | ELECTRO POWER SYSTEMS
Organization address
address: VIA DIGIONE 13 BIS contact info |
Nazionalità Coordinatore | Italy [IT] |
Totale costo | 3˙999˙005 € |
EC contributo | 2˙482˙969 € |
Programma | FP7-JTI
Specific Programme "Cooperation": Joint Technology Initiatives |
Code Call | FCH-JU-2011-1 |
Funding Scheme | JTI-CP-FCH |
Anno di inizio | 2012 |
Periodo (anno-mese-giorno) | 2012-07-01 - 2015-06-30 |
# | ||||
---|---|---|---|---|
1 |
ELECTRO POWER SYSTEMS
Organization address
address: VIA DIGIONE 13 BIS contact info |
IT (TORINO) | coordinator | 404˙372.20 |
2 |
DOMEL ELEKTROMOTORJI IN GOSPODINJSKI APARATI D.O.O.
Organization address
address: OTOKI 21 contact info |
SI (ZELEZNIKI) | participant | 509˙440.00 |
3 |
TUBIFLEX SPA
Organization address
address: STRADA TORINO 25 contact info |
IT (ORBASSANO) | participant | 347˙914.00 |
4 |
UNIVERZA V LJUBLJANI
Organization address
address: KONGRESNI TRG 12 contact info |
SI (LJUBLJANA) | participant | 278˙067.00 |
5 |
NEDSTACK FUEL CELL TECHNOLOGY BV
Organization address
address: Westervoortsedijk 73 - Building 533 73 contact info |
NL (ARNHEM) | participant | 249˙588.00 |
6 |
INSTITUT JOZEF STEFAN
Organization address
address: Jamova 39 contact info |
SI (LJUBLJANA) | participant | 236˙200.00 |
7 |
FUNDACION PARA EL DESARROLLO DE LAS NUEVAS TECNOLOGIAS DEL HIDROGENO EN ARAGON
Organization address
address: CR ZARAGOZA N 330A KM 566 CUARTE contact info |
ES (HUESCA) | participant | 182˙388.00 |
8 |
PARCO SCIENTIFICO E TECNOLOGICO PER L'AMBIENTE - ENVIRONMENT PARK SPA
Organization address
address: Galleria San Federico 54 contact info |
IT (TORINO) | participant | 140˙600.00 |
9 |
ONDA SPA
Organization address
address: VIA VITTORIA 158 A contact info |
IT (MUSSOLENTE) | participant | 78˙400.00 |
10 |
JRC -JOINT RESEARCH CENTRE- EUROPEAN COMMISSION
Organization address
address: Rue de la Loi 200 contact info |
BE (BRUSSELS) | participant | 56˙000.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The FluMaBack (Fluid Management component improvement for Back up fuel cell systems) project aims at improving the performance, life time and cost of balance of plant (BOP) components of back up fuel cell systems specifically developed to face back-out periods of around 1,000h/year for specific markets: USA, Africa and North Europe where hard operative conditions are present (high and low temperatures). The improvement of system components addressed in this project will benefit both back-up and CHP applications. The project focuses on new design and improvement of BOP components for utilization in PEMFC based stationary power applications, aimed at: - improving BOP components performance, in terms of reliability; - improving the lifetime of BOP component both at component and at a system level; - reducing cost in a mass production perspective; - simplifying the manufacturing/assembly process of the entire fuel cell system. While in recent years the performance and durability of the PEMFC have increased and the cost has decreased at the same time, performance, durability and costs of BOP components have basically stayed the same. So, for improvements on performance, durability and cost of the fuel cell system, R&D dedicated on BOP components have become essential. The project is focussed on the most critical BOP components with the largest potential for performance improvement and cost reductions: - Air and fluid flow equipments, including subcomponents and more specifically blower and recirculation pumps - Humidifier - Heat exchanger Specific targets in terms of efficiency, lifetime and cost have been pointed out for each BOP component to be developed. The project will have a duration of 3 years to guarantee the achievement of all project targets. The consortium consists of large and small entities which are R&D centres, BoP components developers and manufacturers, fuel cells stack and fuel cell system developers and manufacturers. Partners are located throughout the EU: Italy, Spain, The Netherland and Slovenia.'