Coordinatore | CENTRO DE ESTUDIOS E INVESTIGACIONES TECNICAS
Organization address
address: Paseo de Manuel Lardizabal 15 contact info |
Nazionalità Coordinatore | Spain [ES] |
Totale costo | 3˙902˙075 € |
EC contributo | 2˙989˙591 € |
Programma | FP7-TRANSPORT
Specific Programme "Cooperation": Transport (including Aeronautics) |
Code Call | FP7-SST-2012-RTD-1 |
Funding Scheme | CP-IP |
Anno di inizio | 2012 |
Periodo (anno-mese-giorno) | 2012-10-01 - 2016-03-31 |
# | ||||
---|---|---|---|---|
1 |
CENTRO DE ESTUDIOS E INVESTIGACIONES TECNICAS
Organization address
address: Paseo de Manuel Lardizabal 15 contact info |
ES (SAN SEBASTIAN (GIPUZKOA)) | coordinator | 949˙755.00 |
2 |
INTEGRASYS SA
Organization address
address: CALLE ESQUILO 1 contact info |
ES (MADRID) | participant | 477˙960.00 |
3 |
PHIDANI SOFTWARE SPRL
Organization address
address: RUE DE LA CASERNE 45 contact info |
BE (BRUXELLES) | participant | 457˙826.00 |
4 |
Nottingham Scientific Limited
Organization address
address: "Loxley House, Tottle Road" contact info |
UK (Nottingham) | participant | 435˙148.00 |
5 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 329˙916.00 |
6 |
UNIVERSITY OF GLASGOW
Organization address
address: University Avenue contact info |
UK (GLASGOW) | participant | 235˙080.00 |
7 |
ASOCIACION DE ACCION FERROVIARIA CETREN
Organization address
address: CALLE SIERRA DE CAZORLA 1 contact info |
ES (LAS MATAS MADRID) | participant | 61˙770.00 |
8 |
ERTMS SOLUTIONS SPRL
Organization address
address: RUE DE LA CASERNE 45 contact info |
BE (BRUXELLES) | participant | 42˙136.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Currently European Train Control System (ETCS) rollout is a major concern for the railway sector. Equipment for ETCS level 1 and 2 typically follows a long process before being put into service due to interpretation variations in the specification and certification procedures requiring long and expensive field-testing. On the other hand, migration from ETCS level 2 to 3 has not been yet foreseen due to the technical. EATS has the objective to address these two situations: 1. EATS will propose innovative lab. tools providing a model of the on-board ERTMS system, and including the dynamic behaviour of the air-gap comm. and fault injection for the safety assessment. This will lead to reduced laboratory and field-testing certification process time and cost. In the current economic situation, this is crucial to keep the ETCS deployment speed. 2. EATS will propose a novel positioning system based on the combination of different techniques proved useful for other industrial sectors and exploit unique features of the railway and the train. Moreover, RAMS analysis and laboratory testing are foreseen to verify the proposed technical solution. This will be a step forward towards ETCS level 3 that minimizes trackside costs and maximizes track capacity. The consortium is clearly concerned about the return to the society of the funding obtained. Dissemination will be done by a web site with open forum, 2 workshops for industry, 2 courses for engineering students, 8 scientific papers, an Advisory Board and contribution to standards. The consortium presents 3 key characteristics to overcome these challenges: world class organizations with successful previous experiences (e.g. CEIT coordinates [TREND], NSL participated in [GRAIL]); it involves technology providers (CEIT, FhG), subsystem integrator (INT), service providers (NSL, ESOL) and Notified Body (CETREN). Finally, the consortium has a small size to eliminate inefficiencies and work redundancies typical from large IP projects.'
An EU team is improving testing of the European Train Control System (ETCS). The study's model advances signal processing and has led to the design of new tools, plus work has begun on a Smart Train Positioning System (STPS).