POWER-OM

"Power consumption driven Reliability, Operation and Maintenance optimisation"

 Coordinatore FUNDACION TEKNIKER 

 Organization address address: CALLE INAKI GOENAGA 5
city: EIBAR GUIPUZCOA
postcode: 20600

contact info
Titolo: Mr.
Nome: Alzaga
Cognome: Aitor
Email: send email
Telefono: 34943206744
Fax: 34943202757

 Nazionalità Coordinatore Spain [ES]
 Totale costo 3˙788˙409 €
 EC contributo 2˙651˙294 €
 Programma FP7-NMP
Specific Programme "Cooperation": Nanosciences, Nanotechnologies, Materials and new Production Technologies
 Code Call FP7-2012-NMP-ICT-FoF
 Funding Scheme CP-TP
 Anno di inizio 2012
 Periodo (anno-mese-giorno) 2012-08-01   -   2015-07-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    FUNDACION TEKNIKER

 Organization address address: CALLE INAKI GOENAGA 5
city: EIBAR GUIPUZCOA
postcode: 20600

contact info
Titolo: Mr.
Nome: Alzaga
Cognome: Aitor
Email: send email
Telefono: 34943206744
Fax: 34943202757

ES (EIBAR GUIPUZCOA) coordinator 709˙207.00
2    LULEA TEKNISKA UNIVERSITET

 Organization address address: University Campus, Porsoen
city: LULEA
postcode: SE97187

contact info
Titolo: Prof.
Nome: Diego
Cognome: Galar
Email: send email
Telefono: 46920491000
Fax: 46920492250

SE (LULEA) participant 402˙460.00
3    FAGOR AOTEK S. COOP

 Organization address address: B SAN ANDRES 19
city: ARRASATE MONDRAGON
postcode: 20500

contact info
Titolo: Mr.
Nome: Carlos
Cognome: Rodriguez De Yurre
Email: send email
Telefono: 34943039805

ES (ARRASATE MONDRAGON) participant 369˙600.00
4    PREDICT SAS

 Organization address address: AVENUE DE LA FORET DE HAYE 19
city: VANDOEUVRE LES NANCY
postcode: 54500

contact info
Titolo: Dr.
Nome: Maxime
Cognome: Monnin
Email: send email
Telefono: 33383556785
Fax: 33383556788

FR (VANDOEUVRE LES NANCY) participant 356˙575.00
5    Artis GmbH

 Organization address address: Sellhorner Weg 28-30
city: Bispingen
postcode: 29646

contact info
Titolo: Mr.
Nome: Dirk
Cognome: Euhus
Email: send email
Telefono: 49519495010
Fax: 495195000000

DE (Bispingen) participant 346˙689.00
6    "GORATU MAQUINAS HERRAMIENTA, SA"

 Organization address address: CALLE LERUN 1
city: ELGOIBAR
postcode: 20870

contact info
Titolo: Mr.
Nome: Agustin
Cognome: Prado
Email: send email
Telefono: +34 943744553
Fax: +34 943744572

ES (ELGOIBAR) participant 235˙403.00
7    MONITION LIMITED

 Organization address address: BONDHAY COMPLEX
city: WORKSOP
postcode: S80 3EH

contact info
Titolo: Mr.
Nome: Michael
Cognome: Burrows
Email: send email
Telefono: 441910000000
Fax: 441910000000

UK (WORKSOP) participant 231˙360.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

sensors    energy    strategies    reliability    time    machines    maintenance    environment    power    machine    times    om    added    consumption    business   

 Obiettivo del progetto (Objective)

'The normal strategy to keep production systems in good conditions is to apply preventive maintenance practices, with a supportive workforce “reactive” in the case of clearly detected malfunctions. This impact on quality, cost and in general, productivity. Added to this, the uncertainty of machine reliability at any given time, also impacts on product/production delivery times. It is known also that a worn-out mechanism has higher energy consumption. The use of intelligent predictive technologies could contribute to improve the situation, but these techniques are not widely used in the production environment. Often sensors and monitors required for the production environment are non standard and require costly implementations. Power-OM propose to use the electric current consumption monitoring and profiling, as an easy to implement condition based maintenance (CbM) technique, and manage it also as a way to improve the overall business effectiveness, under a triple perspective: • Optimizing maintenance strategies based on the prediction of potential failures and schedule maintenance operations in convenient periods and avoid unexpected breakdowns • Operation: Managing energy as a production resource and reduce its consumption • Product reliability: Providing the machine tool builder with real data about the behaviour of the product and their critical components This universal solution should also be compatible with the added value information that could come from existing sources (control) and sensors used at the machine, and jointly this will preserve current and future investment in the field. The project will research also in the required infrastructure and new business model for maintenance services provider. Power-OM will be applied in machine tools, focussing on spindles and linear guides as responsible for the most common and cost-intensive downtimes. However the technology developed in this sense would have high potentials across other types of machines.'

Introduzione (Teaser)

Poor maintenance strategies for production machines lead to shorter equipment lifespans, cost overruns and longer delivery times. An EU initiative is looking at ways to maintain equipment at the right time in an optimal manner, while lowering production costs and use of resources.

Altri progetti dello stesso programma (FP7-NMP)

MAGNIFYCO (2009)

MAGNETIC NANOCONTAINERS FOR COMBINED HYPERTHERMIA AND CONTROLLED DRUG RELEASE

Read More  

NANOSTAIR (2012)

Establishing a process and a platform to support standardization for nanotechnologies implementing the STAIR approach

Read More  

R2R-CIGS (2012)

Roll-to-roll manufacturing of high efficiency and low cost flexible CIGS solar modules

Read More