Coordinatore | TELEKOM SLOVENIJE DD
Organization address
address: CIGALETOVA ULICA 15 contact info |
Nazionalità Coordinatore | Slovenia [SI] |
Totale costo | 4˙980˙873 € |
EC contributo | 3˙194˙482 € |
Programma | FP7-ICT
Specific Programme "Cooperation": Information and communication technologies |
Code Call | FP7-ICT-2011-8 |
Funding Scheme | CP |
Anno di inizio | 2012 |
Periodo (anno-mese-giorno) | 2012-10-01 - 2015-09-30 |
# | ||||
---|---|---|---|---|
1 |
TELEKOM SLOVENIJE DD
Organization address
address: CIGALETOVA ULICA 15 contact info |
SI (LJUBLJANA) | coordinator | 0.00 |
2 |
AIT Austrian Institute of Technology GmbH
Organization address
address: Donau-City-Strasse 1 contact info |
AT (WIEN) | participant | 0.00 |
3 |
AUSTRIAN POWER GRID AG
Organization address
address: WAGRAMER STRASSE 19 contact info |
AT (WIEN) | participant | 0.00 |
4 |
BORZEN, ORGANIZATOR TRGA Z ELEKTRICNO ENERGIJO, DOO
Organization address
address: DUNAJSKA CESTA 156 contact info |
SI (LJUBLJANA) | participant | 0.00 |
5 |
CYBERGRID GMBH
Organization address
address: BAUMEISTERGASSE 96/2 contact info |
AT (WIEN) | participant | 0.00 |
6 |
ELEKTRO LJUBLJANA PODJETJE ZADISTRIBUCIJO ELEKTRICNE ENERGIJE D.D.
Organization address
address: Slovenska cesta 58 contact info |
SI (Ljubljana) | participant | 0.00 |
7 |
ELEKTRO-SLOVENIJA D.O.O.
Organization address
address: HAJDRIHOVA 2 contact info |
SI (LJUBLJANA) | participant | 0.00 |
8 |
EUDT ENERGIE- U. UMWELTDATEN TREUHAND GMBH
Organization address
address: STERNECKSTRASSE 19 PALAIS STERNECK contact info |
AT (KLAGENFURT AM WORTHERSEE) | participant | 0.00 |
9 |
RICERCA SUL SISTEMA ENERGETICO - RSE SPA
Organization address
address: Via Rubattino Raffaele 54 contact info |
IT (MILANO) | participant | 0.00 |
10 |
SAP AG
Organization address
address: DIETMAR HOPP ALLEE 16 contact info |
DE (WALLDORF) | participant | 0.00 |
11 |
TECHNISCHE UNIVERSITAET WIEN
Organization address
address: KARLSPLATZ 13 contact info |
AT (WIEN) | participant | 0.00 |
12 |
VAASAETT LTD AB OY
Organization address
address: ELONTIE 45B contact info |
FI (HELSINKI) | participant | 0.00 |
13 |
XLAB RAZVOJ PROGRAMSKE OPREME IN SVETOVANJE DOO
Organization address
address: Pot za Brdom 100 contact info |
SI (LJUBLJANA) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
The 3rd Energy Package clearly boosts the development of an Integrated European balancing mechanism. In this context, ACER has in 2011 started the development of the Framework Guidelines on Electricity Balancing. It is expected from the ACER statements that Demand Response will play significant role in the future integrated balancing market allowing Virtual Power Plants, comprising Demand Response and Distributed Generation resources to compete on equal ground.nnBased on the above, the overall objective of the eBADGE project is to propose an optimal pan-European Intelligent Balancing mechanism, piloted on the borders of Austria, Italy and Slovenia, that is also able to integrate Virtual Power Plant Systems that can assist in the management of the electricity Transmission and Distribution grids in an optimized, controlled and secure manner. Even if the trans-national mechanism proposed by eBADGE will be tested with reference to a trilateral case (Austria, Italy, Slovenia), the approach and the modelling methodology is meant to allow a gradual extension to other countries in Europe.nThe ICT development of the eBADGE project will be in line with the ACER Guidelines delivering the following five results:n1. Simulation and modelling tool for studying Integrated Balancing/Reserve Market allowing the participation of VPP at the distribution side;n2. Uniform high performance message bus between Balancing/Reserve entities;n3. Business models between Energy, ICT and Residential Consumers sectors;n4. Virtual Power Plant as a Reliable Balancing Asset;n5. Pilot eBADGE Cloud.nnProject objectives are:n1. To develop the components: simulation and modelling tool; message bus; VPP data analysis, optimisation and control strategies; home energy cloud; and business models between Energy, ICT and Residential Consumers sector;n2. To integrate the above components into a single system;n3. To validate these in lab and field trials;n4. To evaluate its impact.nnThe Consortium will first design and implement the single components, which will be then individually tested and validated and finally, integrated. The validation of the individual components will be done using historical data and simulation (Simulation and modelling tool), expert knowledge in the Consortium (Message bus validation) using designed and developed scenarios and field trials (Home Energy Cloud and Pilot eBADGE cloud). The validation of the selected models for an Integrated Balancing/Reserve Market will also bring to a first rough assessment of the environmental and economical benefits.nnThe consortium will promote a strong interaction and consultation with relevant stakeholders involved in Advisory Board. Achievements of the project eBADGE, if widely implemented, will also deliver synergies and efficient use of existing resources and infrastructure thus lowering daily costs for electricity users and increasing European welfare.