Coordinatore | HYDRO BOND ENGINEERING LIMITED
Organization address
address: CLAYMORE AVENUE ABERDEEN SCIENCE AND ENERGY PARK BRIDGE OF DON contact info |
Nazionalità Coordinatore | United Kingdom [UK] |
Totale costo | 1˙601˙614 € |
EC contributo | 1˙207˙378 € |
Programma | FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs |
Code Call | FP7-SME-2012 |
Funding Scheme | BSG-SME |
Anno di inizio | 2012 |
Periodo (anno-mese-giorno) | 2012-12-01 - 2015-09-30 |
# | ||||
---|---|---|---|---|
1 |
HYDRO BOND ENGINEERING LIMITED
Organization address
address: CLAYMORE AVENUE ABERDEEN SCIENCE AND ENERGY PARK BRIDGE OF DON contact info |
UK (ABERDEEN) | coordinator | 556˙753.08 |
2 |
MARINE SIGNALS SL
Organization address
address: C PRACTICANTE IGNACIO RODRIGUEZ SN OFFICINA 12 ED DE SERVICIOS I D I CAMPUS UNIVERSITARIO DE TAFIRA contact info |
ES (LAS PALMAS) | participant | 260˙026.20 |
3 |
FORTIS MECHANICAL DESIGN LIMITED
Organization address
address: PICKTHALL GROUND BROUGHTON MILLS contact info |
UK (BROUGHTON IN FURNESS CUMBRIA) | participant | 169˙896.54 |
4 |
NORDIC SEAL AS
Organization address
address: HEGDALRINGEN 19 contact info |
NO (LARVIK) | participant | 166˙431.99 |
5 |
THE UK INTELLIGENT SYSTEMS RESEARCH INSTITUTE LIMITED
Organization address
address: MIDDLE ASTON HOUSE contact info |
UK (OXFORDSHIRE) | participant | 47˙163.00 |
6 |
DANMARKS TEKNISKE UNIVERSITET
Organization address
address: Anker Engelundsvej 1, Building 101A contact info |
DK (KONGENS LYNGBY) | participant | 4˙562.00 |
7 |
NOVAMINA CENTAR INOVATIVNIH TEHNOLOGIJA DOO
Organization address
address: JACKOVINSLI KLANEC 17 contact info |
HR (Zagreb) | participant | 2˙545.19 |
8 |
E.ON CLIMATE & RENEWABLES UK LIMITED
Organization address
address: WESTWOOD WAY WESTWOOD BUSINESS PARK contact info |
UK (COVENTRY WEST MIDLANDS) | participant | 0.00 |
9 |
OMNISENS SA
Organization address
address: RIOND BOSSON 3 contact info |
CH (MORGES) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Most European offshore wind farms are currently installed within 20 km of the coast in shallow water depths up to 20m. The next generation will be developed at distances of 40 km in sea depths up to 80m. These new locations present technical challenges for engineering and the possibility of new synergies between all marine renewable energy resources including wave, tide and wind. Inspection and maintenance at depth is difficult and the raising of transmission voltages to keep cable sizes manageable is urgently required as the technical difficulty of hauling heavy cables is significantly increased. The availability of self-monitoring connectors to eliminate routine maintenance at greater depths is seen as a potential step-change improvement in infrastructure management and the development of ROV-installable wet-mate connectors as an alternative to dry-mated cable is a dominant industry objective. We will deliver a prototype 33kV hybrid wet-mate connector with a connectivity monitoring system and future-proof features for higher voltage connector technologies. This will lead to efficient power transmission, reduced installation and maintenance costs and precision remote monitoring that reduces routine maintenance and intervention by divers, benefitting health, safety and affordability.'
"Added-value bioprocessing for Fish raw materials via low-cost Fermentation technologies delivering a PLUS in the sustainable production, consumer safety and quality of highly sensitive fish products"
Read MoreSecond Generation Unit Load Device to improve the Security and Efficiency of the Aerospace Logistics Industry
Read More"An all-encompassing, intelligent safety and asset management system for highway maintenance"
Read More