Coordinatore | FUTURE ANALYTICS CONSULTING LIMITED
Organization address
address: FITZWILLIAM SQUARE 23 contact info |
Nazionalità Coordinatore | Ireland [IE] |
Sito del progetto | http://harmonise.eu/ |
Totale costo | 4˙894˙911 € |
EC contributo | 3˙493˙771 € |
Programma | FP7-SECURITY
Specific Programme "Cooperation": Security |
Code Call | FP7-SEC-2012-1 |
Funding Scheme | CP-FP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-06-01 - 2016-05-31 |
# | ||||
---|---|---|---|---|
1 |
FUTURE ANALYTICS CONSULTING LIMITED
Organization address
address: FITZWILLIAM SQUARE 23 contact info |
IE (DUBLIN) | coordinator | 537˙943.00 |
2 |
Teknologian tutkimuskeskus VTT Oy
Organization address
address: Vuorimiehentie 3 contact info |
FI (Espoo) | participant | 454˙144.00 |
3 |
UNIVERSITY OF ULSTER
Organization address
address: CROMORE ROAD contact info |
UK (COLERAINE) | participant | 357˙200.00 |
4 |
BUILDING DESIGN PARTNERSHIP LIMITED
Organization address
address: "PICCADILLY BASIN, DUCIE STREET 11" contact info |
UK (MANCHESTER) | participant | 354˙120.00 |
5 |
SELEX ES SPA
Organization address
address: VIA PIEMONTE 60 contact info |
IT (ROMA) | participant | 319˙200.00 |
6 |
LONIX OY
Organization address
address: TEOLLISUUSKATU 33 contact info |
FI (HELSINKI) | participant | 299˙760.00 |
7 |
FUNDACION TECNALIA RESEARCH & INNOVATION
Organization address
address: PARQUE TECNOLOGICO DE MIRAMON PASEO MIKELETEGI 2 contact info |
ES (DONOSTIA-SAN SEBASTIAN) | participant | 291˙478.00 |
8 |
BERGISCHE UNIVERSITAET WUPPERTAL
Organization address
address: GAUSS-STRASSE 20 contact info |
DE (WUPPERTAL) | participant | 265˙640.00 |
9 |
THE UNIVERSITY OF WARWICK
Organization address
address: Kirby Corner Road - University House - contact info |
UK (COVENTRY) | participant | 260˙000.00 |
10 |
LEIGHFISHER LTD
Organization address
address: ESKDALE ROAD 1180 contact info |
UK (WINNERSH) | participant | 193˙280.00 |
11 |
COMUNE DI GENOVA
Organization address
address: Via Garibaldi 9 contact info |
IT (Genova) | participant | 96˙320.00 |
12 |
AYUNTAMIENTO DE BILBAO
Organization address
address: URIBITARTE 18-4 DCHA contact info |
ES (BILBAO) | participant | 64˙686.00 |
13 |
TEKNOLOGIAN TUTKIMUSKESKUS VTT
Organization address
address: TEKNIIKANTIE 4 A contact info |
FI (ESPOO) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'For the first time, more than 50% of the world's population live in urban areas. By 2050, c. 70% of people are likely to be city dwellers, compared with less than 30% in 1950. This trend brings with it increased security and safety threats in urban areas, not least to urban built infrastructure. The central aim of HARMONISE (A Holistic Approach to Resilience and Systematic ActiOns to Make Large Scale UrbaN Built Infrastructure SEcure) is to develop a comprehensive, multi-faceted, yet mutually-reinforcing concept for the enhanced security, resilience and sustainability of large scale urban built infrastructure and development. Large scale urban built infrastructure is a critical component within the intertwined networks of urban areas, which include not only physical components, but also integrated hardware and software aspects. To date, a comprehensive and holistic approach to improve the resilience and security of large scale urban developments (i.e. shopping centres/areas, sports venues or business centres with underground transportation nodes) against attacks and disruptions, has not been developed thoroughly. HARMONISE will be grounded in a holistic view of innovation, and will advocate synergies with, and augmentation of, relevant existing, past or ongoing projects. The project recognises the necessity to improve the design of urban areas and increase their security against, and resilience, to new threats. Specifically, HARMONISE seeks to deliver (a) a holistic urban resilience integrated information platform; (b) a suite of innovative tools (toolkit hosted within the HARMONISE platform); (c) greater understanding and awareness of urban security and resilience vis-a-vis dissemination activities; and, (d) commercialisation opportunities among emerging new markets in this field. HARMONISE will result in significant resilience enhancement methods for large scale urban built infrastructure.'