Coordinatore | RICERCA SUL SISTEMA ENERGETICO - RSE SPA
Organization address
address: Via Rubattino Raffaele 54 contact info |
Nazionalità Coordinatore | Italy [IT] |
Totale costo | 3˙496˙357 € |
EC contributo | 2˙571˙834 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-ENERGY-2013-1 |
Funding Scheme | CP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-10-01 - 2016-09-30 |
# | ||||
---|---|---|---|---|
1 |
RICERCA SUL SISTEMA ENERGETICO - RSE SPA
Organization address
address: Via Rubattino Raffaele 54 contact info |
IT (MILANO) | coordinator | 529˙027.00 |
2 |
POTSDAM INSTITUT FUER KLIMAFOLGENFORSCHUNG
Organization address
address: Telegrafenberg 31 contact info |
DE (POTSDAM) | participant | 439˙724.00 |
3 |
POLIEDRA CENTRI DI CONOSCENZA E FORMAZIONE DEL POLITECNICO DI MILANO
Organization address
address: PIAZZA LEONARDO DA VINCI 32 contact info |
IT (MILANO) | participant | 326˙880.00 |
4 |
EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH
Organization address
address: Raemistrasse 101 contact info |
CH (ZUERICH) | participant | 257˙011.00 |
5 |
ASSOCIATION POUR LA RECHERCHE ET LE DEVELOPPEMENT DES METHODES ET PROCESSUS INDUSTRIELS - ARMINES
Organization address
address: Boulevard Saint-Michel 60 contact info |
FR (PARIS) | participant | 247˙280.00 |
6 |
RTE RESEAU DE TRANSPORT D ELECTRICITE SA
Organization address
address: Terrasse Bellini 1 Tour Initiale contact info |
FR (LA DEFENSE CEDEX) | participant | 244˙387.00 |
7 |
RENEWABLES GRID GUG (HAFTUNGSBESCHRANKT) GMBH
Organization address
address: HAYDNSTRASSE 1 contact info |
DE (BERLIN) | participant | 223˙686.00 |
8 |
IZES GGMBH
Organization address
address: ALTENKESSELER STRASSE 17 contact info |
DE (SAARBRUECKEN) | participant | 159˙506.00 |
9 |
STATNETT SF
Organization address
address: Nydalen Alle 33 contact info |
NO (OSLO) | participant | 131˙925.00 |
10 |
NATIONAL GRID ELECTRICITY TRANSMISSION PLC
Organization address
address: THE STRAND 1-3 contact info |
UK (LONDON) | participant | 12˙408.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The basic assumption of the project is that the difficult public acceptance of Electric Power System (EPS) infrastructures are due to several reasons: i) the lack of trustworthiness in the relationship between Transmission System Operators (TSOs) and the stakeholders and general public; ii) the difficulty in comparing the new EPS infrastructures benefits, which are on a global, with the impacts , which are mostly “local”; iii) the perception of risks, threats and problems for the stakeholders, often neglected or scarcely recognized and understood by TSOs; iv) the lack of tools to facilitate the stakeholders and public participation to decision processes; v) the fragility or the complexity of the participatory processes, with the consequent very low effectiveness. The project idea, therefore, includes: 1. the analysis of the needs, concerns, wants and expectations of the stakeholders and general public 2. the development or adaptation of methodologies to assess impacts and benefits 3. the development of suitable processes for an effective communication and real participation of the stakeholders and general public 4. a series of case studies (taking into account geographical location, size of the infrastructure and stage of completion of the scheme), with a double aim: to give elements to the methodological activities and to allow a proper testing 5. a synthesis of the project results and a series of recommendations about the stakeholders and general public engagement 6. the dissemination of the project results and output The overarching goal of this proposal is to develop a methodology to manage the consultation in order to engage the stakeholders in the decision making process and to improve support of development of future grid infrastructure. Based on multidisciplinary approach, it is proposed to design and develop a European good practice guide lead by experts in the field of development of grid infrastructure, environmental and social acceptance issues.'
"Toolbox for Common Forecasting, Risk assessment, and Operational Optimisation in Grid Security Cooperations of Transmission System Operators (TSOs)"
Read MoreDevelopment of advanced BIOREFinery schemes to be INTEGrated into existing industrial fuel producing complexes
Read MoreIndustrial scale demonstration of sustainable algae cultures for biofuel production
Read More