Coordinatore | IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND MEDICINE
Organization address
address: SOUTH KENSINGTON CAMPUS EXHIBITION ROAD contact info |
Nazionalità Coordinatore | United Kingdom [UK] |
Totale costo | 4˙096˙731 € |
EC contributo | 2˙996˙239 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-ENERGY-2013-1 |
Funding Scheme | CP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-11-01 - 2016-10-31 |
# | ||||
---|---|---|---|---|
1 |
IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND MEDICINE
Organization address
address: SOUTH KENSINGTON CAMPUS EXHIBITION ROAD contact info |
UK (LONDON) | coordinator | 639˙985.00 |
2 |
GLOWNY INSTYTUT GORNICTWA
Organization address
address: Plac Gwarkow 1 contact info |
PL (KATOWICE) | participant | 569˙745.00 |
3 |
TECHNISCHE UNIVERSITEIT DELFT
Organization address
address: Stevinweg 1 contact info |
NL (DELFT) | participant | 349˙704.00 |
4 |
Helmholtz-Zentrum Potsdam Deutsches GeoForschungsZentrum
Organization address
address: Telegraphenberg contact info |
DE (POTSDAM) | participant | 321˙684.00 |
5 |
UNIVERSITY OF GLASGOW
Organization address
address: University Avenue contact info |
UK (GLASGOW) | participant | 318˙190.00 |
6 |
Geological Survey of Denmark and Greenland
Organization address
address: Oster Voldgade 10 10 contact info |
DK (COPENHAGEN) | participant | 221˙063.00 |
7 |
SEAMWELL INTERNATIONAL LIMITED
Organization address
address: METIC HOUSE - RIPLEY DRIVE contact info |
UK (NORMANTON WEST YORKSHIRE) | participant | 138˙360.00 |
8 |
GOLDER ASSOCIATES AFRICA PTY LTD
Organization address
address: "THANDANANI PARK, MATUKA CLOSE, HALFWAY GARDENS 105" contact info |
ZA (MIDRAND) | participant | 108˙000.00 |
9 |
PREMOGOVNIK VELENJE DD
Organization address
address: PARTIZANSKA CESTA 78 contact info |
SI (VELENJE) | participant | 106˙528.00 |
10 |
COMMONWEALTH SCIENTIFIC AND INDUSTRIAL RESEARCH ORGANISATION
Organization address
address: LIMESTONE AVENUE - CAMPBELL contact info |
AU (CANBERRA) | participant | 75˙000.00 |
11 |
HENAN POLYTECHNIC UNIVERSITY
Organization address
address: SHI JI AVENUE 2001 contact info |
CN (JIAO ZUO) | participant | 52˙480.00 |
12 |
KATOWICKI HOLDING WEGLOWY SA
Organization address
address: Damrota 16-18 contact info |
PL (Katowice) | participant | 37˙500.00 |
13 |
MONASH UNIVERSITY
Organization address
address: Wellington Road contact info |
AU (VICTORIA) | participant | 20˙000.00 |
14 |
University of Calgary
Organization address
address: University Drive NW 2500 contact info |
CA (CALGARY ALBERTA) | participant | 20˙000.00 |
15 |
THE TRUSTEES OF INDIANA UNIVERSITY
Organization address
address: PO BOX 1847 contact info |
US (BLOOMINGTON) | participant | 18˙000.00 |
16 |
SEAMWELL (HONG KONG) LIMITED
Organization address
address: DES VOEUX ROAD CENTRAL 249 - 253 contact info |
HK (HONG KONG) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The main objective of the proposed project is to develop a generic UCG-CCS site characterisation workflow, and the accompanying technologies, which would address the dilemma faced by the proponents of reactor zone CO2 storage, and offer technological solutions to source sink mismatch issues that are likely to be faced in many coalfields. This objective will be achieved through integrated research into the field based technology knowledge gaps, such as cavity progression and geomechanics, potential groundwater contamination and subsidence impacts, together with research into process engineering solutions in order to assess the role/impact of site specific factors (coal type, depth/pressure, thickness, roof and floor rock strata, hydrology) and selected reagents on the operability of a given CO2 emission mitigation option in a coalfield. CO2 storage capacity on site for European and international UCG resources will be assessed and CO2 mitigation technologies based on end use of produced synthetic gas will be evaluated. The technology options identified will be evaluated with respect to local and full chain Life Cycle environmental impacts and costs.
The project takes a radical and holistic approach to coupled UCG-CCS, and thus the site selection criteria for the coupled process, considering different end-uses of the produced synthetic gas, covering other options beyond power generation, and will evaluate novel approaches to UCG reagent use in order to optimise the whole process. This approach aims at minimising the need for on-site CO2 storage capacity as well as maximising the economic yield of UCG through value added end products, as well as power generation, depending on the local coalfield and geological conditions.'
"Creating the technology for safe, long-term carbon storage in the subsurface"
Read MoreNew Induction Wireless Manufacturing Efficient Process for Energy Intensive Industries
Read MoreNew concepts for high efficiency and low cost in-line manufactured flexible CIGS solar cells
Read More