Coordinatore | INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED
Organization address
address: WEST OF SCOTLAND SCIENCE PARK contact info |
Nazionalità Coordinatore | United Kingdom [UK] |
Totale costo | 590˙423 € |
EC contributo | 590˙423 € |
Programma | FP7-PEOPLE
Specific programme "People" implementing the Seventh Framework Programme of the European Community for research, technological development and demonstration activities (2007 to 2013) |
Code Call | FP7-PEOPLE-2013-IAPP |
Funding Scheme | MC-IAPP |
Anno di inizio | 2014 |
Periodo (anno-mese-giorno) | 2014-01-01 - 2017-12-31 |
# | ||||
---|---|---|---|---|
1 |
INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED
Organization address
address: WEST OF SCOTLAND SCIENCE PARK contact info |
UK (GLASGOW) | coordinator | 338˙002.72 |
2 |
THE PROVOST, FELLOWS, FOUNDATION SCHOLARS & THE OTHER MEMBERS OF BOARD OF THE COLLEGE OF THE HOLY & UNDIVIDED TRINITY OF QUEEN ELIZABETH NEAR DUBLIN
Organization address
address: College Green - contact info |
IE (DUBLIN) | participant | 252˙420.30 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'EINSTEIN addresses the scientific and technical challenges related to the optimization of energy efficiency in existing buildings. This is achieved through the development of a new innovative modular simulation-based building control system. This has the ability to: (i) exploit real-time holistic building simulation (integrated with diverse building systems), (ii) directly enable automated control actions of a building and its surroundings (adaptively) and (iii) provide considerable energy savings to the building (by an optimized algorithm). EINSTEIN will formulate and integrate a number of new control strategies to be used with the simulation-based building control system to provide the building manager with the optimum energy efficiency solutions for their building and its use by its occupants. It will not only eradicate errors between ‘as-built’ and ‘as-designed’ conditions but also include predictive analysis with respect to how the building will perform, taking into account future weather predictions and occupant use. The control strategies will be tested and validated on a number of existing buildings'
"ATR7, a novel player of oxidative stress tolerance in plants: interrogation of its mode of action through an integrative omics approach"
Read More