PILEINSPECT

Integrity Testing of Deep Foundation Piles

 Coordinatore MAROVISZ HUNGARIAN ASSOCIATION FOR NONDESTRUCTIVE TESTING -MAGYAR RONCSOLASMENTES VIZSGALATI SZOVETSEG TARSADALMI SZERVEZETEK 

 Organization address address: VARROGEPGYAR UTCA 8 10
city: BUDAPEST
postcode: 1211

contact info
Titolo: Mrs.
Nome: Szofia
Cognome: Fogl
Email: send email
Telefono: +36 1 2780632
Fax: +36 1 278 0633

 Nazionalità Coordinatore Hungary [HU]
 Totale costo 2˙598˙144 €
 EC contributo 2˙016˙000 €
 Programma FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs
 Code Call FP7-SME-2013
 Funding Scheme BSG-SME-AG
 Anno di inizio 2013
 Periodo (anno-mese-giorno) 2013-12-01   -   2016-11-30

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    MAROVISZ HUNGARIAN ASSOCIATION FOR NONDESTRUCTIVE TESTING -MAGYAR RONCSOLASMENTES VIZSGALATI SZOVETSEG TARSADALMI SZERVEZETEK

 Organization address address: VARROGEPGYAR UTCA 8 10
city: BUDAPEST
postcode: 1211

contact info
Titolo: Mrs.
Nome: Szofia
Cognome: Fogl
Email: send email
Telefono: +36 1 2780632
Fax: +36 1 278 0633

HU (BUDAPEST) coordinator 631˙453.64
2    Nome Ente NON disponibile

 Organization address address: BOCANGEL 28
city: MADRID
postcode: 28028

contact info
Titolo: Ms.
Nome: Elena
Cognome: Gómez
Email: send email
Telefono: 34913612585

ES (MADRID) participant 499˙520.50
3    DFI EUROPE VERENIGING

 Organization address address: CEINTUURBAAN 2
city: HARDERWIJK
postcode: 3847 LG

contact info
Titolo: Mr.
Nome: Henk
Cognome: De Koning
Email: send email
Telefono: 31341456191
Fax: 31341456208

NL (HARDERWIJK) participant 499˙255.95
4    GSP GESELLSCHAFT FUR SCHWINGUNGSUNTERSUCHUNGEN UND DYNAMISCHE PRUFMETHODEN MBH

 Organization address address: STEUBENSTRASSE 46
city: MANNHEIM
postcode: 68163

contact info
Titolo: Dr.
Nome: Matthias
Cognome: Schallert
Email: send email
Telefono: 49621331361
Fax: +49 62134358

DE (MANNHEIM) participant 101˙217.50
5    BOUWSERVICE MANAGEMENT NEDERLAND BV

 Organization address address: ROOSEVELTLAAN 8
city: TERNEUZEN
postcode: 4536 GZ

contact info
Titolo: Mr.
Nome: Gilliam
Cognome: De Nijs
Email: send email
Telefono: +31 115620927
Fax: +31 115623678

NL (TERNEUZEN) participant 67˙182.50
6    CRANFIELD UNIVERSITY

 Organization address address: College Road
city: CRANFIELD - BEDFORDSHIRE
postcode: MK43 0AL

contact info
Titolo: Ms.
Nome: Helen
Cognome: Winkworth
Email: send email
Telefono: +44 1234 758293

UK (CRANFIELD - BEDFORDSHIRE) participant 61˙613.00
7    BRUNEL UNIVERSITY

 Organization address address: Kingston Lane
city: UXBRIDGE
postcode: UB83PH

contact info
Titolo: Ms.
Nome: Teresa
Cognome: Waller
Email: send email
Telefono: +44 1895266206

UK (UXBRIDGE) participant 56˙458.00
8    BUNDESANSTALT FUER MATERIALFORSCHUNG UND -PRUEFUNG

 Organization address address: Unter den Eichen 87
city: BERLIN
postcode: 12205

contact info
Titolo: Ms.
Nome: Eva-Maria
Cognome: Müller
Email: send email
Telefono: +49 30 8104 2257
Fax: +49 30 8104 2207

DE (BERLIN) participant 50˙741.40
9    PER AARSLEFF (UK) LTD

 Organization address address: HAWTON LANE
city: BALDERTON
postcode: NG24 3BU

contact info
Titolo: Mr.
Nome: Christopher
Cognome: Primett
Email: send email
Telefono: +44 1636 611140
Fax: +44 1636 611142

UK (BALDERTON) participant 29˙905.00
10    PILETEST SP ZOO

 Organization address address: UL. WARSZAWSKA 153 lok 123
city: BIELSKO-BIALA
postcode: 43300

contact info
Titolo: Mr.
Nome: Ryszard
Cognome: Rippel
Email: send email
Telefono: +48 516009965
Fax: +48 33 812 22 49

PL (BIELSKO-BIALA) participant 18˙652.51

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

techniques    installation    driving    detected    piles    hammer    quality    replace    pile    defects    sonic    integrity    cast    perform      

 Obiettivo del progetto (Objective)

'A hundred thousand kilometres of piles are installed yearly in Europe. Problems can occur during pile driving including spalling of concrete at the pile’s head or point and transverse or spiral cracking. Industry figures suggest that as many as 3-5% of piles fail during installation. If a failure is detected, the cost of that pile is increased 4 times due to the remedial work needed to replace it. If a failure is not detected during installation of the new pile, the results can be more catastrophic with costs sometimes exceeding €1 M for a single failure.

Current pile inspection techniques involve dynamic load or sonic integrity testing. These are relatively fast to perform. However, the quality of results depends strongly on the knowledge and skill of the operator. It has been found that small defects that are less than about 0.4m (quarter wavelength) are difficult to detect. Some studies also indicate that defects representing less than 50% of cross sectional area are not detectable via sonic integrity testing.

PileInspect aims to develop ‘best practice’ for inspecting the integrity of cast-in-place and pre-cast concrete piles and of steel piles. We propose to replace the instrumented hammer and pile driving hammer with a portable shaker which will ensure repeatable, tailored excitation spectra, and should dramatically improve accuracy of estimation of the proposed diagnostic features.

Highly innovative signal processing methodologies (based on time frequency analysis techniques formulated for non-stationary signals) could be employed in order to try to increase the quality of diagnosis and perform automatic defect recognition.'

Altri progetti dello stesso programma (FP7-SME)

ICYHEART (2011)

Highly integrated ultra-low-power SoC solution for unobtrusive and energy-efficient wireless cardiac monitoring

Read More  

TACMON (2008)

DEVELOPMENT OF A LOW-COST INTERACTIVE GRAPHICAL TACTILE DISPLAY CAPABLE OF DISPLAYING TEXTUAL AND GRAPHICAL INFORMATION AS ADVANCED USER INTERFACE FOR THE VISUALLY IMPAIRED

Read More  

EAGLE (2011)

"Development and demonstration of a dynamic, web-based, renewable energy rating platform"

Read More