Coordinatore | INSTITUTE OF COMMUNICATION AND COMPUTER SYSTEMS
Organization address
address: Patission Str. 42 contact info |
Nazionalità Coordinatore | Greece [EL] |
Totale costo | 5˙484˙324 € |
EC contributo | 4˙260˙240 € |
Programma | FP7-SECURITY
Specific Programme "Cooperation": Security |
Code Call | FP7-SEC-2012-1 |
Funding Scheme | CP-FP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-12-01 - 2017-05-31 |
# | ||||
---|---|---|---|---|
1 |
INSTITUTE OF COMMUNICATION AND COMPUTER SYSTEMS
Organization address
address: Patission Str. 42 contact info |
EL (ATHINA) | coordinator | 539˙600.00 |
2 |
TOTALFORSVARETS FORSKNINGSINSTITUT
Organization address
address: Gullfossgatan 6 contact info |
SE (STOCKHOLM) | participant | 749˙472.75 |
3 |
TECHNISCHE UNIVERSITAET DRESDEN
Organization address
address: HELMHOLTZSTRASSE 10 contact info |
DE (DRESDEN) | participant | 663˙720.00 |
4 |
RISA SICHERHEITSANALYSEN GMBH
Organization address
address: Krumme Strasse 55 contact info |
DE (BERLIN) | participant | 549˙651.50 |
5 |
TECNIC - TECNICHE E CONSULENZE NELL' INGEGNERIA CIVILE SPA - CONSULTING ENGINEERS SPA
Organization address
address: Via Panama 86/A contact info |
IT (ROMA) | participant | 372˙160.00 |
6 |
D. MPAIRAKTARIS KAI SYNERGATES-GRAFEION TECHNIKON MELETON ETAIREIA PERIORISMENIS EFTHYNIS
Organization address
address: PESMATZOGLOU 17 contact info |
EL (ATHINA) | participant | 319˙200.00 |
7 |
UNIVERSITEIT TWENTE
Organization address
address: DRIENERLOLAAN 5 contact info |
NL (ENSCHEDE) | participant | 312˙478.25 |
8 |
GEOSIG AG
Organization address
address: AHORNWEG 5A contact info |
CH (OTHMARSINGEN) | participant | 303˙382.51 |
9 |
BUNDESMINISTERIUM DES INNERN
Organization address
address: ALT-MOABIT 101 contact info |
DE (BERLIN) | participant | 250˙491.49 |
10 |
ANGLIA RUSKIN UNIVERSITY HIGHER EDUCATION CORPORATION
Organization address
address: BISHOP HALL LANE contact info |
UK (CHELMSFORD) | participant | 200˙083.50 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'This work will provide a monitoring system for constructed facilities that will provide a near real time, reliable, and continuously updated assessment of the structural condition of the monitored facilities after a disaster, with enough detail to be useful for early and full recovery planning. The above assessment will be seamlessly integrated with automated, near real-time and continuously updated assessment of physical damage, loss of functionality, direct economic loss and needs of the monitored facilities and will provide the required input for the prioritization of their repair. Such detailed monitoring is only economical for selected facilities that are essential for response and recovery or facilities that have a high value as a target for terrorist attacks. In case of spatially extended events, in order to assess the physical damage in the whole affected area, the detailed assessment of damage in the monitored facilities will be used for the speedy local calibration of satellite and oblique aerial photography dramatically reducing the required time to inform the post disaster/crisis needs assessment process and provide base data for reconstruction efforts. The above will be part of the RECONASS next generation post-crisis needs assessment tool in regards to construction damage and related needs. This tool will enable fusion of external information, allow for future expansion of the system, provide international interoperability between the involved units for reconstruction and recovery planning and support the collaborative work between these actors.'