Coordinatore | EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH
Organization address
address: ROUTE DE MEYRIN CERN contact info |
Nazionalità Coordinatore | Switzerland [CH] |
Totale costo | 15˙610˙973 € |
EC contributo | 5˙199˙992 € |
Programma | FP7-INFRASTRUCTURES
Specific Programme "Capacities": Research infrastructures |
Code Call | FP7-INFRASTRUCTURES-2007-1 |
Funding Scheme | CP-CSA-Infra |
Anno di inizio | 2008 |
Periodo (anno-mese-giorno) | 2008-04-01 - 2011-03-31 |
# | ||||
---|---|---|---|---|
1 |
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH
Organization address
address: ROUTE DE MEYRIN CERN contact info |
CH (GENEVA 23) | coordinator | 0.00 |
2 |
AKADEMIA GORNICZO-HUTNICZA IM. STANISLAWA STASZICA W KRAKOWIE
Organization address
address: AL ADAMA MICKIEWICZA 30 contact info |
PL (KRAKOW) | participant | 0.00 |
3 |
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE
Organization address
address: Rue Michel -Ange 3 contact info |
FR (PARIS) | participant | 0.00 |
4 |
CENTRO DE INVESTIGACIONES ENERGETICAS, MEDIOAMBIENTALES Y TECNOLOGICAS-CIEMAT
Organization address
address: Avenida Complutense 22 contact info |
ES (MADRID) | participant | 0.00 |
5 |
CESKE VYSOKE UCENI TECHNICKE V PRAZE
Organization address
address: ZIKOVA 4 contact info |
CZ (PRAHA) | participant | 0.00 |
6 |
COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
Organization address
address: RUE LEBLANC 25 contact info |
FR (PARIS 15) | participant | 0.00 |
7 |
EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH
Organization address
address: Raemistrasse 101 contact info |
CH (ZUERICH) | participant | 0.00 |
8 |
GSI HELMHOLTZZENTRUM FUER SCHWERIONENFORSCHUNG GMBH
Organization address
address: PLANCKSTRASSE 1 contact info |
DE (DARMSTADT) | participant | 0.00 |
9 |
IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND MEDICINE
Organization address
address: SOUTH KENSINGTON CAMPUS EXHIBITION ROAD contact info |
UK (LONDON) | participant | 0.00 |
10 |
ISTITUTO NAZIONALE DI FISICA NUCLEARE
Organization address
address: Via Enrico Fermi 40 contact info |
IT (FRASCATI) | participant | 0.00 |
11 |
PAUL SCHERRER INSTITUT
Organization address
address: Villigen contact info |
CH (VILLIGEN PSI) | participant | 0.00 |
12 |
RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN
Organization address
address: Templergraben 55 contact info |
DE (AACHEN) | participant | 0.00 |
13 |
RHEINISCHE FRIEDRICH-WILHELMS-UNIVERSITAT BONN
Organization address
address: REGINA PACIS WEG 3 contact info |
DE (BONN) | participant | 0.00 |
14 |
SCIENCE AND TECHNOLOGY FACILITIES COUNCIL
Organization address
address: Polaris House North Star Avenue contact info |
UK (SWINDON) | participant | 0.00 |
15 |
STICHTING VOOR FUNDAMENTEEL ONDERZOEK DER MATERIE - FOM
Organization address
address: Van Vollenhovenlaan 659 contact info |
NL (UTRECHT) | participant | 0.00 |
16 |
STIFTUNG DEUTSCHES ELEKTRONEN-SYNCHROTRON DESY
Organization address
address: NOTKESTRASSE 85 contact info |
DE (HAMBURG) | participant | 0.00 |
17 |
THE UNIVERSITY OF SHEFFIELD
Organization address
address: FIRTH COURT WESTERN BANK contact info |
UK (SHEFFIELD) | participant | 0.00 |
18 |
UNIVERSITE DE GENEVE
Organization address
address: Rue du General Dufour 24 contact info |
CH (GENEVE) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The Large Hadron Collider upgrade (SLHC) is the project with highest priority in “The European strategy for particle physics” document, unanimously approved by the CERN Council in July 2006. The SLHC, with expected 1 B€ budget, includes the upgrade of specific elements of the LHC accelerator, major upgrades in the accelerator injector complex, as well as upgrades to the two high-luminosity experiments ATLAS and CMS. It will result in a tenfold increase of the LHC luminosity. Thus the SLHC will remain the most powerful particle accelerator in the world in the next two decades. The Preparatory Phase project of the LHC-upgrade (SLHC-PP), co-funded by the EC, comprises Coordinating, Support and Technical activities. The Coordinating activities within SLHC-PP play a central role for the organisation of the new accelerator- and detector-upgrade collaborations, putting in place project structures and collaboration management tools, ultimately aiming for agreements on work-sharing and funding for the implementation phase. Support activities address upfront priority safety issues in the radiation protection domain. The Technical developments address the construction of prototypes of Nb-Ti high-field magnets with large aperture, the study of a new H- ion source, field stabilization in superconducting accelerating structures, and novel tracking detector power distribution. The SLHC-PP project runs in parallel with an extensive SLHC-oriented R&D program, funded by CERN together with important contributions from many CERN member and non-member states. In order to prepare for the SLHC project implementation as a whole, the coordination tasks within SLHC-PP include the coordination of these developments carried out outside SLHC-PP. The main aim of SLHC-PP is to prepare the SLHC project for a decision on the approval of its implementation by 2011. Beside the justification of SLHC by the physics results and operational experience from the first years of LHC running, the necessary ingredients for the approval will include: the maturity of new technologies required for SLHC, solutions for critical safety issues, and the formation of collaborations for the implementation, including the definition of work sharing and financial commitments. The SLHC-PP project is fully set up to address these issues and to prepare for the approval by the CERN council and by all other funding agencies involved.'