GIGAWAM

Giga bit access passive optical network using wavelength division multiplexing

 Coordinatore NOR-TEK TEKNOLOGISENTER AS 

 Organization address address: GAUSTADALLEEN 21
city: OSLO

contact info
Cognome: NILSEN, RUNE
Email: send email
Telefono: -95965407
Fax: -22604380

 Nazionalità Coordinatore Norway [NO]
 Totale costo 9˙120˙400 €
 EC contributo 3˙000˙000 €
 Programma FP7-ICT
Specific Programme "Cooperation": Information and communication technologies
 Funding Scheme CP
 Anno di inizio 2008
 Periodo (anno-mese-giorno) 2008-04-01   -   2011-03-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    NOR-TEK TEKNOLOGISENTER AS

 Organization address address: GAUSTADALLEEN 21
city: OSLO

contact info
Cognome: NILSEN, RUNE
Email: send email
Telefono: -95965407
Fax: -22604380

NO (OSLO) coordinator 0.00
2 DANMARKS TEKNISKE UNIVERSITET DK participant 0.00
3    ERICSSON AB

 Organization address address: TORSHAMNSGATAN 23
city: STOCKHOLM
postcode: 164 80

contact info
Cognome: N/A

SE (STOCKHOLM) participant 0.00
4    FICONTEC GMBH

 Organization address address: FAHRENHEITSTRASSE 9
city: BREMEN
postcode: 28359

contact info
Cognome: N/A

DE (BREMEN) participant 0.00
5 FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V DE participant 0.00
6    IGNIS PHOTONYX A/S

 Organization address address: BLOKKEN 84
city: BIRKEROD
postcode: 3460

contact info
Cognome: N/A

DK (BIRKEROD) participant 0.00
7    IGNIS PHOTONYX INC

 Organization address address: BUREAU 1200, 4200 BOULEVARD SAINT-LAURENT
city: MONTREAL
postcode: H2W 2R2

contact info
Cognome: N/A

CA (MONTREAL) participant 0.00
8    SVEDICE AB

 Organization address address: BRUTTOVAGEN 7
city: JARFALLA
postcode: 175 27

contact info
Cognome: N/A

SE (JARFALLA) participant 0.00
9    SYNTUNE AB

 Organization address address: TORSHAMNSGATAN 30 A
city: KISTA
postcode: 164 40

contact info
Cognome: N/A

SE (KISTA) participant 0.00
10    VERTILAS GMBH

 Organization address address: LICHTENBERGSTRASSE 8
city: GARCHING
postcode: 85748

contact info
Cognome: N/A

DE (GARCHING) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

penetration    connected    million    market    components    broadband    benefit    requirement    point    optical    wdm    times    capacity    pon    gpon    integration    mbps    fibres    asia   

 Obiettivo del progetto (Objective)

The need for higher speed is a never ceasing requirement for broadband access and requirement of 1 Gbps is expected around 2016. The copper lines are expected to reach their maximum capacity at about 10Mbps while the capacity required only for watching one channel of HDTV is 20Mbps.

Tithe total number of homes connected to fibres will grow from about 11 million at the end of 2006 to about 86 million at the end of 2011, dominated by Asia with 59 million household connected.

Our idea is to develop and implement WDM-PON as the new future proof FTTH technology to satisfy the coming BW requirements with a point to point architecture. The aim is to develop application specific optical components of a WDM-PON broadband access network targeting a system cost per subscriber below todayÂ’s implementation of GPON by develop innovative new low cost components with high level of integration in addition to new manufacturing processes. Even the cheapes WDM-PON solution cost 2 -3 times as much as GPON. Up to 95% of the cost of optical components is due to packaging. The project aims to develop a system with a integration scale that is around 100 times higher than SOA that can be implemented as an upgrade of xPON systems, that are currently being installed, and will not require changes or re-routing of optical fibres.

The European citizens and society will benefit from GigaWAM through: Easier access to a broad range of services; online maintaining communication links, avoiding discrimination and exclusion, benefit regarding telemedicine and eHealth, e-learning, and bridge the gap between urban and rural areas and Eastern and Western Europe.

Overall, the market opportunity in year 5 post market launches is €230 Mn annually with market launch in Europe, Asia and US assuming a conservative market penetration the first years followed by a steeper growth to 5% market penetration in Europe in year 5.

Altri progetti dello stesso programma (FP7-ICT)

EUROPA (2009)

European Robotic Pedestrian Assistant

Read More  

BEYWATCH (2008)

Building energy watcher

Read More  

CAMEI (2013)

Coordination Actions in the scientific era of Medical Education Informatics for fostering IT skills for healthcare workforce in the EU and USA

Read More