Coordinatore | NOR-TEK TEKNOLOGISENTER AS
Organization address
address: GAUSTADALLEEN 21 contact info |
Nazionalità Coordinatore | Norway [NO] |
Totale costo | 9˙120˙400 € |
EC contributo | 3˙000˙000 € |
Programma | FP7-ICT
Specific Programme "Cooperation": Information and communication technologies |
Funding Scheme | CP |
Anno di inizio | 2008 |
Periodo (anno-mese-giorno) | 2008-04-01 - 2011-03-31 |
# | ||||
---|---|---|---|---|
1 |
NOR-TEK TEKNOLOGISENTER AS
Organization address
address: GAUSTADALLEEN 21 contact info |
NO (OSLO) | coordinator | 0.00 |
2 | DANMARKS TEKNISKE UNIVERSITET | DK | participant | 0.00 |
3 |
ERICSSON AB
Organization address
address: TORSHAMNSGATAN 23 contact info |
SE (STOCKHOLM) | participant | 0.00 |
4 |
FICONTEC GMBH
Organization address
address: FAHRENHEITSTRASSE 9 contact info |
DE (BREMEN) | participant | 0.00 |
5 | FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V | DE | participant | 0.00 |
6 |
IGNIS PHOTONYX A/S
Organization address
address: BLOKKEN 84 contact info |
DK (BIRKEROD) | participant | 0.00 |
7 |
IGNIS PHOTONYX INC
Organization address
address: BUREAU 1200, 4200 BOULEVARD SAINT-LAURENT contact info |
CA (MONTREAL) | participant | 0.00 |
8 |
SVEDICE AB
Organization address
address: BRUTTOVAGEN 7 contact info |
SE (JARFALLA) | participant | 0.00 |
9 |
SYNTUNE AB
Organization address
address: TORSHAMNSGATAN 30 A contact info |
SE (KISTA) | participant | 0.00 |
10 |
VERTILAS GMBH
Organization address
address: LICHTENBERGSTRASSE 8 contact info |
DE (GARCHING) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
The need for higher speed is a never ceasing requirement for broadband access and requirement of 1 Gbps is expected around 2016. The copper lines are expected to reach their maximum capacity at about 10Mbps while the capacity required only for watching one channel of HDTV is 20Mbps.
Tithe total number of homes connected to fibres will grow from about 11 million at the end of 2006 to about 86 million at the end of 2011, dominated by Asia with 59 million household connected.
Our idea is to develop and implement WDM-PON as the new future proof FTTH technology to satisfy the coming BW requirements with a point to point architecture. The aim is to develop application specific optical components of a WDM-PON broadband access network targeting a system cost per subscriber below todayÂ’s implementation of GPON by develop innovative new low cost components with high level of integration in addition to new manufacturing processes. Even the cheapes WDM-PON solution cost 2 -3 times as much as GPON. Up to 95% of the cost of optical components is due to packaging. The project aims to develop a system with a integration scale that is around 100 times higher than SOA that can be implemented as an upgrade of xPON systems, that are currently being installed, and will not require changes or re-routing of optical fibres.
The European citizens and society will benefit from GigaWAM through: Easier access to a broad range of services; online maintaining communication links, avoiding discrimination and exclusion, benefit regarding telemedicine and eHealth, e-learning, and bridge the gap between urban and rural areas and Eastern and Western Europe.
Overall, the market opportunity in year 5 post market launches is €230 Mn annually with market launch in Europe, Asia and US assuming a conservative market penetration the first years followed by a steeper growth to 5% market penetration in Europe in year 5.