Coordinatore | RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN
Organization address
address: Templergraben 55 contact info |
Nazionalità Coordinatore | Germany [DE] |
Sito del progetto | http://fp7-intime.eu/ |
Totale costo | 4˙564˙479 € |
EC contributo | 3˙177˙887 € |
Programma | FP7-NMP
Specific Programme "Cooperation": Nanosciences, Nanotechnologies, Materials and new Production Technologies |
Code Call | FP7-NMP-2008-SMALL-2 |
Funding Scheme | CP-FP |
Anno di inizio | 2009 |
Periodo (anno-mese-giorno) | 2009-09-01 - 2012-11-30 |
# | ||||
---|---|---|---|---|
1 |
RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN
Organization address
address: Templergraben 55 contact info |
DE (AACHEN) | coordinator | 665˙200.00 |
2 |
SAP AG
Organization address
address: DIETMAR HOPP ALLEE 16 contact info |
DE (WALLDORF) | participant | 527˙730.00 |
3 |
FORSCHUNGSINSTITUT FUER RATIONALISIERUNG
Organization address
address: PONTDRIESCH 14/16 contact info |
DE (AACHEN) | participant | 452˙240.00 |
4 |
POLITECNICO DI MILANO
Organization address
address: PIAZZA LEONARDO DA VINCI 32 contact info |
IT (MILANO) | participant | 340˙730.00 |
5 |
FUJITSU TECHNOLOGY SOLUTIONS GmbH
Organization address
city: Munich contact info |
DE (Munich) | participant | 315˙527.00 |
6 |
IDEKO S COOP
Organization address
address: Arriaga Kalea 2 contact info |
ES (ELGOIBAR) | participant | 261˙425.00 |
7 |
DIN DEUTSCHES INSTITUT FUER NORMUNG E.V.
Organization address
address: Burggrafenstrasse 6 contact info |
DE (BERLIN) | participant | 159˙355.00 |
8 |
FIDIA SPA
Organization address
address: Corso Lombardia 11 contact info |
IT (SAN MAURO TORINESE) | participant | 146˙515.00 |
9 |
Otto Junker GmbH
Organization address
city: SIMMERATH LAMMERSDORF contact info |
DE (SIMMERATH LAMMERSDORF) | participant | 116˙645.00 |
10 |
ESTARTA RECTIFICADORA S.COOP
Organization address
address: PG IND SIGMA XIXILION KALEA 2 PAB 10 contact info |
ES (ELGOIBAR) | participant | 107˙560.00 |
11 |
Nome Ente NON disponibile
Organization address
address: PS MIKELETEGI 59 contact info |
ES (SAN SEBASTIAN) | participant | 50˙580.00 |
12 |
UCIMU-SISTEMI PER PRODURRE
Organization address
address: Viale Fulvio Testi 128 contact info |
IT (Cinisello Balsamo) | participant | 34˙380.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Non-hierarchical production networks are a common environment of today’s manufacturing companies. Each company is facing multiple and dynamic relationships within several networks. This complex situation causes permanent delivery delays. Delayed supplies lead to wasteful turbulences in the entire network and to expensive compensations. For the European manufacturing industry the loss of efficiency is estimated to be 1 billion Euros per year. Besides the costs the missing delivery reliability leads to poor customer satisfaction and increased lead times. The key objective of inTime is to improve delivery reliability in each customer-supplier relationship balancing production in the overall network. In order to foster delivery reliability each supply has to be rewarded according to his delivery performance. Today only a minority of supplies is successfully secured by manual negotiated delivery penalties. Due to the high variation of supplies manual levelling of incentives is a time consuming process. Therefore a fair share of risk between customer and supplier is not transparent. inTime will reach transparency by developing a market based negotiation mechanism rewarding delivery reliability at minimum transaction costs. Key innovation of the project is to establish an electronic market for trading reliability incentives. Besides the development of the market mechanism, the integration into the entire order process requires several novelties which have to be developed simultaneously: - The negotiation mechanism supports a new kind of order prioritisation. To realise this potential new planning and sequencing algorithms are needed. - In order to gain transparency on the criticality of each supply, functions analysing the internal risk and related costs of the required parts have to be developed. - Enabler for inTime is an automated order data communication. To avoid redundant developments inTime will apply the existing communication platform myOpenFactory.'
Creating a business-to-business online system to improve delivery of products between customers and suppliers will help European industry become more competitive.