Coordinatore | SAAB AKTIEBOLAG
Organization address
address: . contact info |
Nazionalità Coordinatore | Sweden [SE] |
Totale costo | 4˙808˙191 € |
EC contributo | 2˙819˙578 € |
Programma | FP7-TRANSPORT
Specific Programme "Cooperation": Transport (including Aeronautics) |
Code Call | FP7-AAT-2008-RTD-1 |
Funding Scheme | CP-FP |
Anno di inizio | 2009 |
Periodo (anno-mese-giorno) | 2009-04-01 - 2012-05-31 |
# | ||||
---|---|---|---|---|
1 |
SAAB AKTIEBOLAG
Organization address
address: . contact info |
SE (LINKOPING) | coordinator | 533˙079.00 |
2 |
SOCIETE NATIONALE DE CONSTRUCTION AEROSPATIALE SONACA SA
Organization address
address: ROUTE NATIONALE CINQ PARK INDUSTRIEL contact info |
BE (GOSSELIES) | participant | 404˙691.00 |
3 |
FOKKER AEROSTRUCTURES BV
Organization address
address: Industrieweg 4 contact info |
NL (Papendrecht) | participant | 356˙316.00 |
4 |
STICHTING NATIONAAL LUCHT- EN RUIMTEVAARTLABORATORIUM
Organization address
address: Anthony Fokkerweg 2 contact info |
NL (AMSTERDAM) | participant | 345˙964.00 |
5 |
ALENIA AERMACCHI SPA
Organization address
address: PIAZZA MONTE GRAPPA 4 contact info |
IT (ROMA) | participant | 272˙363.00 |
6 |
AIRBUS DEFENCE AND SPACE GMBH
Organization address
address: WILLY MESSERSCHMITT STRASSE 1 contact info |
DE (OTTOBRUNN) | participant | 263˙755.00 |
7 |
EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH
Organization address
address: Raemistrasse 101 contact info |
CH (ZUERICH) | participant | 228˙031.00 |
8 |
Airbus Operations Limited
Organization address
address: "New Filton House, Filton" contact info |
UK (BRISTOL) | participant | 223˙079.00 |
9 |
DELFOI OY
Organization address
address: Vanrikinkuja 2 contact info |
FI (ESPOO) | participant | 192˙300.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The objective is to develop new integrated technology and design concepts for fixed leading edge structure to achieve greater than 30% reduction in recurring manufacturing and assembly cost compared to to-day’s highly fabricated structure. The Project will explore material and processing technology options for both metallic and composite structural solutions that will result in preferred concepts that best meet the critical structural requirements which are defined in the project. A key requirement will be the cost and simplicity of manufacture; however structural performance, in service maintenance, systems access and environmental impact requirements will also feature in a concept and technology selection process. The Project aligns to the FP7 objectives defined in AAT.2008.4.1.2. Aerostructures ‘Development of highly integrated structures with optimum combination of metallic and composite materials …’ and AAT.2008.4.1.5. Production ‘... advanced manufacturing methods to reduce both recurring and non-recurring costs across the whole production cycle ...’. The project is subdivided into 5 operational working packages and one management work package, with organisation of WP’s running from WP1, definition of requirements, through technology development (WP2), concept design and development in WP3 & 4 and conclusions in WP5. The Project consortium is a well-balanced team of European Aerospace OEM’s, all very capable of appropriately assessing and ex-ploiting the competing technologies and design solutions.'
(Generating simulations to Enable Testing of Alternative routes to improve WAYinding in evacuation of over-ground and underground terminals)
Read More