TIBUCON

Self Powered Wireless Sensor Network for HVAC System Energy Improvement - Towards Integral Building Connectivity

 Coordinatore MOSTOSTAL WARSZAWA SA 

 Organization address address: UL KONSTRUKTORSKA 11A
city: WARSZAWA
postcode: 02 673

contact info
Titolo: Mr.
Nome: Piotr
Cognome: Dymarski
Email: send email
Telefono: +48 795522147
Fax: +48 225485626

 Nazionalità Coordinatore Poland [PL]
 Totale costo 2˙460˙761 €
 EC contributo 1˙585˙965 €
 Programma FP7-ICT
Specific Programme "Cooperation": Information and communication technologies
 Code Call FP7-2010-NMP-ENV-ENERGY-ICT-EeB
 Funding Scheme CP
 Anno di inizio 2010
 Periodo (anno-mese-giorno) 2010-09-01   -   2013-10-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    MOSTOSTAL WARSZAWA SA

 Organization address address: UL KONSTRUKTORSKA 11A
city: WARSZAWA
postcode: 02 673

contact info
Titolo: Mr.
Nome: Piotr
Cognome: Dymarski
Email: send email
Telefono: +48 795522147
Fax: +48 225485626

PL (WARSZAWA) coordinator 0.00
2    FUNDACION TEKNIKER

 Organization address address: CALLE INAKI GOENAGA
city: EIBAR GUIPUZCOA
postcode: 20600

contact info
Titolo: Mr.
Nome: Jon
Cognome: Mabe
Email: send email
Telefono: +34 943 206744
Fax: +34 943 202757

ES (EIBAR GUIPUZCOA) participant 0.00
3    GIROA SOCIEDAD ANONIMA

 Organization address address: CAMINO PORTUETXE
city: SAN SEBASTIAN
postcode: 20018

contact info
Titolo: Mr.
Nome: Iñaki
Cognome: Hernanz
Email: send email
Telefono: +34 943011090
Fax: +34 943464198

ES (SAN SEBASTIAN) participant 0.00
4    THOMAS MORE KEMPEN VZW

 Organization address address: Kleinhoefstraat
city: GEEL
postcode: 2440

contact info
Titolo: Mr.
Nome: Jeroen
Cognome: Van der Veken
Email: send email
Telefono: +32 14 562134
Fax: +32 14 584859

BE (GEEL) participant 0.00
5    TPF SPOLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA

 Organization address address: ULICA SZYSZKOWA
city: WARSZAWA
postcode: 02-285

contact info
Titolo: Mr.
Nome: Dariusz
Cognome: Leszczynski
Email: send email
Telefono: +48 225758110
Fax: +48 225758111

PL (WARSZAWA) participant 0.00
6    UNIVERSITY OF SOUTHAMPTON

 Organization address address: Highfield
city: SOUTHAMPTON
postcode: SO17 1BJ

contact info
Titolo: Ms.
Nome: Yan
Cognome: Qiao
Email: send email
Telefono: +44 2380593907
Fax: +44 2380596841

UK (SOUTHAMPTON) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

solution    real    either    wsn       mm    tibucon    building    power    magnitude    sp    nthe    thermal    harvesting    efficient    monitoring    total    you    installations    heating    hvac    consumption    energy    wiring    hundreds    space    buildings    sensor    battery    wireless   

 Obiettivo del progetto (Objective)

In the current European Energy Scenario, the building sector is responsible for 35-40% of the total energy consumption, and space heating is the largest component of that energy use in virtually all member states, accounting for 67% at the level of EU-15 till 2005.nThe current project focuses on the space heating and cooling aspects, proposing a solution beyond the existing wireless based HVAC control systems, derived from the use of Self Powered Multi Magnitude Wireless Sensor Network (SP-MM-WSN) for building thermal condition monitoring. The SP-MM-WSN completely avoids the use of cables and removable batteries, thanks to the combination of extremely energy efficient wireless communication technology, ultra low power electronics, and the power harvesting concept. The wiring and battery removal is a real breakthrough, considering that:n• Wiring can represent up to 80% of the total cost for a control point in an HVAC systemn• There could be hundreds of sensors in a newly deployed wireless based HVAC control system for a mid-range commercial building, generating hundreds of used batteriesnnThe use of SP-MM-WSN therefore results in an easy-to-deploy and maintenance-free building monitoring system that makes it the ideal candidate for either new or existing HVAC installations. The advantages of the system lie in the level of automation you get and the efficiency improvement you achieve by implementing this solution, TIBUCON, in either existing or new installations.nThe aim of the TIBUCON project is to develop SP-MM-WSN technology that will be used in building thermal condition monitoring for either new or existing HVAC installations. SP-MM-WSN along with an actuating scheme will allow optimized real time control, or at least automatic monitoring and user energy awareness for the retrofit cases. The project will result in:n• A more cost effective and less invasive tool for HVAC control system retrofittingn• More efficient HVAC structure in terms of energy consumption and thermal comfort for new installationsnnIn both situations TIBUCON will have an important impact on the energy consumption and CO2 emission of the HVAC systems, and due to the wire and battery reduction the use of limited resources (copper, PVC, heavy metals, etc) and waste generation (used battery disposal) will be abated.nnThe project outcomes will be evaluated on two demo buildings through a one year period. The selected pilot test beds are a new multi-tenant office building in Poland and an existing group of apartment buildings in Spain.nnRegarding technological improvements proposed by TIBUCON, they are based on the Multi Magnitude and Hybrid Power harvesting approaches. The multi magnitude sensor platform will allow measuring of all relevant information with a single device; and the parallel energy harvesting will allow the correct sensor node performance even if one of the energy sources is temporarily not available (e.g. light).

Altri progetti dello stesso programma (FP7-ICT)

OASE (2010)

Optical Access Seamless Evolution

Read More  

ICU (2008)

Infrared Imaging Components for Use in Automotive Safety Applications

Read More  

TOPDRIM (2012)

Topology driven methods for complex systems

Read More