PANTURA

Flexible Processes and Improved Technologies for Urban Infrastructure Construction Sites

 Coordinatore CHALMERS TEKNISKA HOEGSKOLA AB 

 Organization address address: -
city: GOETEBORG
postcode: 41296

contact info
Titolo: Mr.
Nome: Magnus
Cognome: Holmstrand
Email: send email
Telefono: +46 31 7721939
Fax: +46 31 189705

 Nazionalità Coordinatore Sweden [SE]
 Totale costo 4˙682˙605 €
 EC contributo 3˙244˙452 €
 Programma FP7-ENVIRONMENT
Specific Programme "Cooperation": Environment (including Climate Change)
 Code Call FP7-ENV-2010
 Funding Scheme CP-FP
 Anno di inizio 2011
 Periodo (anno-mese-giorno) 2011-01-01   -   2013-12-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    CHALMERS TEKNISKA HOEGSKOLA AB

 Organization address address: -
city: GOETEBORG
postcode: 41296

contact info
Titolo: Mr.
Nome: Magnus
Cognome: Holmstrand
Email: send email
Telefono: +46 31 7721939
Fax: +46 31 189705

SE (GOETEBORG) coordinator 663˙356.00
2    NEDERLANDSE ORGANISATIE VOOR TOEGEPAST NATUURWETENSCHAPPELIJK ONDERZOEK TNO

 Organization address address: Schoemakerstraat 97
city: DEN HAAG
postcode: 2600 JA

contact info
Titolo: Dr.
Nome: Rizal
Cognome: Sebastian
Email: send email
Telefono: +31 15 2763276
Fax: +31 15 2763024

NL (DEN HAAG) participant 657˙180.00
3    STIFTELSEN SINTEF

 Organization address address: Strindveien 4
city: TRONDHEIM
postcode: 7465

contact info
Titolo: Dr.
Nome: Guri
Cognome: Krigsvoll
Email: send email
Telefono: +47 91783350
Fax: 4722699438

NO (TRONDHEIM) participant 569˙896.00
4    DEMO CONSULTANTS BV

 Organization address address: DELFTECHPARK 10
city: DELFT
postcode: 2628 XH

contact info
Titolo: Mr.
Nome: Ton
Cognome: Damen
Email: send email
Telefono: +31 15 7502520
Fax: +31 15 750 2517

NL (DELFT) participant 339˙193.00
5    NCC AB

 Organization address address: VALLGATAN 3
city: SOLNA
postcode: 170 80

contact info
Titolo: Ms.
Nome: Birgitta
Cognome: Berglund
Email: send email
Telefono: +46 8 58553326
Fax: +46 8 58551000

SE (SOLNA) participant 291˙822.00
6    ACCIONA INFRAESTRUCTURAS S.A.

 Organization address address: AVENIDA DE EUROPA 18
city: ALCOBENDAS
postcode: 28108

contact info
Titolo: Mr.
Nome: Miguel Angel
Cognome: París Torres
Email: send email
Telefono: +34 91 791 2020
Fax: 34917912101

ES (ALCOBENDAS) participant 193˙146.00
7    MOSTOSTAL WARSZAWA SA

 Organization address address: UL KONSTRUKTORSKA 11A
city: WARSZAWA
postcode: 02 673

contact info
Titolo: Mr.
Nome: Poneta
Cognome: Pawe?
Email: send email
Telefono: +48 22 548 56 34
Fax: +48 22 548 56 26

PL (WARSZAWA) participant 132˙864.00
8    GOBIERNO DE CANARIAS

 Organization address city: SANTA CRUZ DE TENERIFE
postcode: 38071

contact info
Titolo: Mr.
Nome: Jose María
Cognome: Maya Cáceres
Email: send email
Telefono: +34 928 30 60 00
Fax: +34 928 38 04 22

ES (SANTA CRUZ DE TENERIFE) participant 98˙865.00
9    AICE CONSULTING SRL

 Organization address address: VIA BOCCACCIO 20
city: SAN GIULIANO TERME - PISA
postcode: 56010

contact info
Titolo: Mr.
Nome: Antonfranco
Cognome: Pasquale
Email: send email
Telefono: 393484000000
Fax: +39 050 878335

IT (SAN GIULIANO TERME - PISA) participant 98˙542.00
10    Darellsoffice B.V.

 Organization address address: Koornmarkt 34
city: Delft
postcode: 2601 DE

contact info
Titolo: Mr.
Nome: Darell
Cognome: Meertins
Email: send email
Telefono: +31 15 2122865
Fax: +31 15 2140633

NL (Delft) participant 97˙907.00
11    GEMEENTE ROTTERDAM

 Organization address address: COOLSINGEL 40
city: ROTTERDAM
postcode: 3011 AD

contact info
Titolo: Mr.
Nome: J.A. (Ton)
Cognome: Siemerink
Email: send email
Telefono: +31 6 51567633
Fax: +31 10 4894500

NL (ROTTERDAM) participant 70˙469.00
12    TRAFIKVERKET - TRV

 Organization address address: RODA VAGEN 1
city: BORLANGE
postcode: 781 89

contact info
Titolo: Ms.
Nome: Monica
Cognome: Eriksson
Email: send email
Telefono: +46 243 75569
Fax: +46 243 75780

SE (BORLANGE) participant 31˙212.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

significant    reduce    techniques    sustainable    site    building    upgrade    construction    renovation    sites    life    mobility    urban    infrastructure    strategies    efficient    maintenance    tools    bridges    flexible    time    bridge    lifecycle    pantura    repair    joints    practices    tool    report    disruption    technologies    off    innovative    materials    team   

 Obiettivo del progetto (Objective)

'More than 50% of bridges in European cities are older than 40 years and bridges are a vital part of the infrastructure. Bridge managers are currently dealing with a large number of structurally deficient, obsolete bridges. The need to maintain, renew, strengthen and upgrade this part of the infrastructure will increase dramatically in the near future. PANTURA has bridges as its focal point. It is, however, important to stress that the approach proposed here can be applied to all infrastructure projects. The aims are to improve highly flexible off-site production processes, create resource-efficient construction sites, improve technologies and tools for bridge construction in densely populated areas and enhance communication between local authorities and construction companies. The main benefits of PANTURA are relevant to the Work Programme and are as follows: a) equip authorities, stakeholders and experts with a comprehensive instrument (methods, tools and techniques) to prepare and perform bridge construction, maintenance, repair and renovation processes in the most effective and efficient way, in the shortest possible time, with the most efficient, sustainable use of resources and with zero disturbance and disruption for the urban environment and urban life of the inhabitants, b) reduce lifecycle costs, i.e. the more efficient use of public funds by saving a significant amount of time and money, c) use new materials to increase off-site industrial production, technical innovations and new markets for SMEs and d) improve benchmarking systems to promote a performance-based, innovative, creative construction industry. PANTURA applies research based on a multidisciplinary, holistic approach and promotes innovative yet practical solutions, while covering the entire lifecycle process. PANTURA aims to realise these objectives by taking current research on construction processes, ICT tools and infrastructure technologies one step further.'

Introduzione (Teaser)

Innovative techniques for construction and repair of bridges will ensure bridge safety, speed up the process, enhance mobility and upgrade infrastructure.

Descrizione progetto (Article)

Bridges old and new dot the European landscape in all shapes and forms, crossing rivers, valleys and waterways to facilitate transport and the quality of life for numerous communities. The EU-funded project 'Flexible processes and improved technologies for urban infrastructure construction sites' (Pantura) is creating high-tech tools and strategies to radically upgrade and accelerate bridge construction, maintenance and renovation.

The project is designing ways to reduce labour, equipment and costly on-site activities through off-site construction, minimising disruption and reducing emissions. It is evaluating 20 existing bridge projects, establishing new strengthening techniques, investigating novel building materials, enhancing repair strategies and analysing best practices in the field. This lends insight into the impact of different decisions over time, introducing factors other than cost into the equation and providing an integrated approach to building and improving bridges.

Among its achievements, the project team developed a new strengthening and repair system for most types of bridges, featuring load-bearing beams that use pre-stressed composites without requiring anchorage systems. It has also made significant progress regarding the behaviour of adhesive joints and improvement of joints through geometrical modifications.

Once the project completes its operational strategy for organising construction processes in the most sustainable way, it will develop an interactive tool to plan and coordinate repairs and construction. The web-based tool will be able to integrate and manage logistics, geographical information, computer modelling scenarios and online monitoring.

Towards the end of the project, the team will produce a comprehensive report on technical specifications for new concept design and engineering, including design guidelines and best practices. The report will also contain recommendations for off-site fabrication and on-site assembly of bridge components. These outcomes will be invaluable in enhancing bridge repair and construction, improving urban infrastructure projects and benefiting the mobility of citizens significantly.

Altri progetti dello stesso programma (FP7-ENVIRONMENT)

ARCH (2011)

Architecture and roadmap to manage multiple pressures on lagoons

Read More  

ATOPICA (2011)

"Atopic diseases in changing climate, land use and air quality"

Read More  

COMPLEX (2012)

Knowledge Based Climate Mitigation Systems for a Low Carbon Economy

Read More