CATION

Cathode Subsystem Development and Optimisation

 Coordinatore Teknologian tutkimuskeskus VTT Oy 

 Organization address address: Vuorimiehentie 3
city: Espoo
postcode: 2150

contact info
Titolo: Dr.
Nome: Jari
Cognome: Kiviaho
Email: send email
Telefono: +358 20 722 5298

 Nazionalità Coordinatore Finland [FI]
 Totale costo 7˙108˙505 €
 EC contributo 2˙625˙788 €
 Programma FP7-JTI
Specific Programme "Cooperation": Joint Technology Initiatives
 Code Call FCH-JU-2009-1
 Funding Scheme JTI-CP-FCH
 Anno di inizio 2011
 Periodo (anno-mese-giorno) 2011-01-01   -   2014-06-30

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    Teknologian tutkimuskeskus VTT Oy

 Organization address address: Vuorimiehentie 3
city: Espoo
postcode: 2150

contact info
Titolo: Dr.
Nome: Jari
Cognome: Kiviaho
Email: send email
Telefono: +358 20 722 5298

FI (Espoo) coordinator 336˙200.90
2    TOPSOE FUEL CELL A/S

 Organization address address: Nymoellevej 55
city: LYNGBY
postcode: 2800

contact info
Titolo: Dr.
Nome: Sune
Cognome: Danø
Email: send email
Telefono: +45 4527 2576
Fax: +45 4527 2999

DK (LYNGBY) participant 738˙473.70
3    BOSAL RESEARCH NV

 Organization address address: DELLESTRAAT 20
city: LUMMEN
postcode: 3560

contact info
Titolo: Mr.
Nome: Yves
Cognome: De Vos
Email: send email
Telefono: +32 13 530 971
Fax: +32 13 531 411

BE (LUMMEN) participant 561˙735.60
4    AVL LIST GMBH

 Organization address address: HANS-LIST-PLATZ 1
city: GRAZ
postcode: 8020

contact info
Titolo: Mr.
Nome: Guenter
Cognome: Trakowanitsch
Email: send email
Telefono: 43316787290
Fax: 433168000000

AT (GRAZ) participant 557˙637.70
5    WARTSILA FINLAND OY

 Organization address address: TARHAAJANTIE 2
city: VAASA
postcode: 65380

contact info
Titolo: Dr.
Nome: Tero
Cognome: Hottinen
Email: send email
Telefono: 358446000000
Fax: 358107000000

FI (VAASA) participant 327˙470.83
6    UNIVERSITA DEGLI STUDI DI GENOVA

 Organization address address: VIA BALBI 5
city: GENOVA
postcode: 16126

contact info
Titolo: Prof.
Nome: Marco
Cognome: Del Borghi
Email: send email
Telefono: +39 010 3532909
Fax: +39 010 3532586

IT (GENOVA) participant 104˙270.10
7    TEKNOLOGIAN TUTKIMUSKESKUS VTT

 Organization address address: TEKNIIKANTIE 4 A
city: ESPOO
postcode: 02044 VTT

contact info
Titolo: Mr.
Nome: Jari
Cognome: Kiviaho
Email: send email
Telefono: +358 20 722 5298
Fax: +358 20 722 7048

FI (ESPOO) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

subsystem    electrical    air    insulation    cathode    efficiency    stack    balance    components    reliability    solutions    thermal    mechanical    individual    subsystems    losses    stacks    sofc   

 Obiettivo del progetto (Objective)

'The main objectives of this proposal is to evaluate different process alternatives and find optimal process and mechanical solutions for the cathode and stack subsystems with the aim of having commercially feasible and technologically optimised subsystem solutions ready for future ~ 250 kWe atmospheric SOFC systems. The aspects taken into account in the development are mainly electrical efficiency, controllability, reliability, mass production and costs effectiveness of developed subsystems and individual components.

This project is focused on the development of SOFC system’s air side fluid and thermal management and mechanical solutions, i.e. cathode subsystem and individual components. In large SOFC systems the cathode subsystem is typically the largest source of auxiliary losses and a major factor decreasing electrical efficiency of the system. The reason for this is that almost all components are based on existing products developed for some other purposes and are not optimized for certain SOFC systems. By making cathode side components from the SOFC system point of view, i.e. optimizing the overall system solutions, significant improvements in terms of costs, reliability, performance and lifetime will be achieved. A parallel optimization of the anode subsystem is carried out in the EU funded ASSENT project.

The project will further focus on the integration of SOFC stacks in large systems. If large SOFC systems would be realized by simple multiplication of smaller SOFC stacks, the cost of the so-called Balance of Stack components would be very large. The Balance of Stack components includes air- and gas manifolding, stack compression, thermal insulation, electrical insulation, wiring, lead-in’s and sealing. Based on state-of-the-art SOFC stacks this project will develop scalable, cost-efficient Balance of Stack solutions suitable for ~ 250 kW SOFC systems.'

Introduzione (Teaser)

Scientists are improving a fuel cell (FC) subsystem associated with energy losses and inefficiency. Together with increased reliability and decreased costs, technology should provide a boost to market penetration.

Altri progetti dello stesso programma (FP7-JTI)

DT-FA-AFC (2011)

Development and Test of Fluidic Actuators for Active Flow Control Applications

Read More  

SLD_SCOOP (2010)

SLD and Icing tests on an Ice Protected Scoop Intake and Channel

Read More  

LOSPA (2011)

Model Design and Manufacturing of the Turbofan Configuration for Low Speed Aerodynamic and Acoustic Testing

Read More