# | ||||
---|---|---|---|---|
1 | CONNECTA CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1. | 2016 | 5˙477˙519.00 | 5˙477˙519.00 |
2 | CONNECTA-2 CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS. PhAse 2. | 2018 | 0.00 | 4˙305˙179.00 |
The Institution CONSTRUCCIONES Y AUXILIAR DE FERROCARRILES, S.A. has been involved also in the following Horizon 2020 projects.