Opendata, web and dolomites

FR8RAIL II SIGNED

Digitalization and Automation of Freight Rail

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "FR8RAIL II" data sheet

The following table provides information about the project.

Coordinator
BOMBARDIER TRANSPORTATION GMBH 

Organization address
address: EICHHORNSTRASSE 3
city: BERLIN
postcode: 10785
website: www.bombardier.de/en/transportation

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Germany [DE]
 Total cost 0 €
 EC max contribution 5˙461˙568 € (0%)
 Programme 1. H2020-EU.3.4.8.5. (Innovation Programme 5: Technologies for sustainable and attractive European rail freight)
 Code Call H2020-S2RJU-CFM-2018
 Funding Scheme Shift2Rail-IA-LS
 Starting year 2018
 Duration (year-month-day) from 2018-05-01   to  2021-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    BOMBARDIER TRANSPORTATION GMBH DE (BERLIN) coordinator 788˙783.00
2    DEUTSCHE BAHN AG DE (BERLIN) participant 1˙055˙205.00
3    TRAFIKVERKET - TRV SE (BORLANGE) participant 862˙145.00
4    DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV DE (KOELN) participant 591˙172.00
5    Construcciones y Auxiliar de Ferrocarriles, S.A. ES (Beasain) participant 295˙690.00
6    TATRAVAGONKA AS SK (POPRAD) participant 284˙025.00
7    INDRA SISTEMAS SA ES (ALCOBENDAS MADRID) participant 269˙937.00
8    FAIVELEY TRANSPORT ITALIA SPA IT (PIOSSASCO TO) participant 200˙248.00
9    AC2T RESEARCH GMBH AT (WIENER NEUSTADT) participant 195˙785.00
10    HITACHI RAIL STS SPA IT (GENOVA) participant 193˙758.00
11    ASOCIACION CENTRO TECNOLOGICO CEIT-IK4 ES (SAN SEBASTIAN) participant 186˙637.00
12    CONTRAFFIC GMBH DE (BERLIN) participant 184˙985.00
13    VIRTUAL VEHICLE RESEARCH GMBH AT (GRAZ) participant 123˙875.00
14    KNORR-BREMSE SYSTEME FUR SCHIENENFAHRZEUGE GMBH DE (MUNCHEN) participant 88˙822.00
15    SNCF MOBILITES FR (ST DENIS) participant 62˙892.00
16    PJ MESSTECHNIK GMBH AT (GRAZ) participant 48˙942.00
17    MATERIALS CENTER LEOBEN FORSCHUNG GMBH AT (LEOBEN) participant 28˙660.00

Map

 Project objective

Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL II further focuses on improving the freight eco system by addressing various challenges: New automatic couplers (1), provided with electrical and data transmission functionalities will massively improve the efficiency of the train composition process, new telematics and electrification (2) will enable Condition Based Maintenance (CBM) by collecting, transmitting and using the necessary information while being supplied with the required energy by means of an advanced energy management system. Improved methods for annual and short-term timetable planning (3) will help traffic operators increasing the overall capacity and raise punctuality and with Real-time network management (4), integrating medium to short-term and operational planning at yards/terminals and in the railway network, inefficiencies will be further reduced or even eliminated. Future freight wagon design (5) is a stream that will contribute in improving reliability of the freight transport while increasing the payload per meter of train. The latter one will be propelled by future main line electric freight locomotives featuring highly flexible freight propulsion (6) systems with reduced operational costs. Furthermore, these new freight trains will be propelled by more than one locomotive running with distributed power (7), thus allowing long freight trains up to 1,500 m. Last but not least, focus is given to driver advisory aystems that are connected (C-DAS) to the traffic management systems (8), further enhancing capacity, improving punctuality and optimize energy consumption of the railway system. Summarizing, FR8RAIL II focuses on various facets of the freight eco system with one goal: overall improvement and increase of competitiveness of the rail freight transport.

 Deliverables

List of deliverables.
Midterm event report Websites, patent fillings, videos etc. 2020-03-19 12:54:45
Quality Plan Documents, reports 2020-02-17 17:32:21
Dissemination and communication strategy Documents, reports 2020-02-13 13:10:48

Take a look to the deliverables list in detail:  detailed list of FR8RAIL II deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FR8RAIL II" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "FR8RAIL II" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.5.)

FR8RAIL III (2019)

Smart data-based assets and efficient rail freight operation

Read More  

LOCATE (2019)

Locomotive bOgie Condition mAinTEnance

Read More  

M2O (2018)

MAke RAil The HOpe for protecting Nature 2 future OPERATION

Read More