Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL II further focuses on improving the freight eco system by addressing various challenges: New automatic couplers (1), provided with electrical and data transmission functionalities will massively improve the efficiency of the train composition process, new telematics and electrification (2) will enable Condition Based Maintenance (CBM) by collecting, transmitting and using the necessary information while being supplied with the required energy by means of an advanced energy management system.
Improved methods for annual and short-term timetable planning (3) will help traffic operators increasing the overall capacity and raise punctuality and with Real-time network management (4), integrating medium to short-term and operational planning at yards/terminals and in the railway network, inefficiencies will be further reduced or even eliminated.
Future freight wagon design (5) is a stream that will contribute in improving reliability of the freight transport while increasing the payload per meter of train. The latter one will be propelled by future main line electric freight locomotives featuring highly flexible freight propulsion (6) systems with reduced operational costs. Furthermore, these new freight trains will be propelled by more than one locomotive running with distributed power (7), thus allowing long freight trains up to 1,500 m. Last but not least, focus is given to driver advisory aystems that are connected (C-DAS) to the traffic management systems (8), further enhancing capacity, improving punctuality and optimize energy consumption of the railway system.
Summarizing, FR8RAIL II focuses on various facets of the freight eco system with one goal: overall improvement and increase of competitiveness of the rail freight transport.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FR8RAIL II" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "FR8RAIL II" are provided by the European Opendata Portal: CORDIS opendata.
More projects from the same programme (H2020-EU.3.4.8.5.)
FR8RAIL III (2019)
Smart data-based assets and efficient rail freight operation