Explore the words cloud of the DIGITALIA project. It provides you a very rough idea of what is the project "DIGITALIA" about.
The following table provides information about the project.
Coordinator |
TORRESCAMARA Y CIA DE OBRAS SA
Organization address contact info |
Coordinator Country | Spain [ES] |
Project website | http://www.torrescamara.com/en/areas-of-activity/innovation |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport) 2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument) |
Code Call | H2020-SMEINST-1-2015 |
Funding Scheme | SME-1 |
Starting year | 2016 |
Duration (year-month-day) | from 2016-03-01 to 2016-08-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | TORRESCAMARA Y CIA DE OBRAS SA | ES (VALENCIA) | coordinator | 50˙000.00 |
When a train crosses from an embankment area (soil) to a bridge, tunnel, viaduct or box culvert, there is an abrupt change in support conditions (strength and hardness, also known as vertical stiffness). Trying to to deal with these changes, that accelerate track degradations and generate vibrations, the embankment at the approaches to these concrete structures (transition zones) are designed and constructed differently compared to the rest of the track, using cement-treated soil to constitute a wedge shaped backfill. The construction process of current solution is complex, uncertain and time-consuming for construction companies.
Besides, the change of vertical stiffness is still not solved with present construction processes. This makes that maintenance needs of transition zones are up to 6 times higher than regular tracks being an additional cost for railway infrastructure managers (mainly public companies). It is estimated that annually 471M€ (10% European investment in track maintenance) is allocated to maintenance operations in transition zones, while these only account for 2,8% of the network length.
TORRESCAMARA has developed DIGITALIA, an innovative solution for transition zones based on precast concrete slabs that properly smooth vertical stiffness and maintain this performance over time, with the aim of: 1) Simplifying, speeding up and reducing costs of the construction process, as DIGITALIA is 60% cheaper than current solutions while taking just 10% of time 2) Reducing maintenance operations needed (equaling regular track needs) and costs, while increasing track availability for train operating companies, 3) Reducing the associated vibrations to improve passenger comfort.
Looking at Europe only, DIGITALIA opens the way to a market worth nearly 140 M€ by the 5th year.
In Phase 1, we will focus on the elaboration of a comprehensive business plan that ensures a quick market deployment through the development of a demonstration element in Phase 2.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DIGITALIA" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "DIGITALIA" are provided by the European Opendata Portal: CORDIS opendata.