DEMOCLOCK

Demonstration of a cost effective medium size Chemical Looping Combustion through packed beds using solid hydrocarbons as fuel for power production with CO2 capture

 Coordinatore STIFTELSEN SINTEF 

 Organization address address: Strindveien 4
city: TRONDHEIM
postcode: 7465

contact info
Titolo: Ms.
Nome: Tove Lillian
Cognome: Hønstad
Telefono: +47 98243437
Fax: +47 73597043

 Nazionalità Coordinatore Norway [NO]
 Totale costo 8˙193˙828 €
 EC contributo 5˙304˙509 €
 Programma FP7-ENERGY
Specific Programme "Cooperation": Energy
 Code Call FP7-ENERGY-2010-2
 Funding Scheme CP
 Anno di inizio 2011
 Periodo (anno-mese-giorno) 2011-06-01   -   2015-05-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    STIFTELSEN SINTEF

 Organization address address: Strindveien 4
city: TRONDHEIM
postcode: 7465

contact info
Titolo: Ms.
Nome: Tove Lillian
Cognome: Hønstad
Telefono: +47 98243437
Fax: +47 73597043

NO (TRONDHEIM) coordinator 0.00
2    "ELCOGAS, S.A."

 Organization address address: CARRETERA CALZADA DE CALATRAVA KM27
city: PUERTOLLANO CIUDAD REAL
postcode: 13500

contact info
Titolo: Mr.
Nome: Pedro
Cognome: Casero
Telefono: +34 926 44 97 63
Fax: +34 926 41 00 37

ES (PUERTOLLANO CIUDAD REAL) participant 0.00
3    ARRAY INDUSTRIES BV

 Organization address address: HOOGEVEENENWEG 29
city: NIEUWERKERK AAN DEN IJSSEL
postcode: 2913LV

contact info
Titolo: Mr.
Nome: Jan-Willem
Cognome: Van Der Gaag
Telefono: 31180331655

NL (NIEUWERKERK AAN DEN IJSSEL) participant 0.00
4    CERAMIQUES TECHNIQUES ET INDUSTRIELLES SA

 Organization address address: Avenue du Moulinas - La Resclause 382
city: SALINDRES
postcode: 30340

contact info
Titolo: Mrs.
Nome: Nadine
Cognome: Del Bianco
Telefono: +33 4 66 85 95 22
Fax: +33 466 857 009

FR (SALINDRES) participant 0.00
5    FOSTER WHEELER ITALIANA SRL

 Organization address address: VIA SEBASTIANO CABOTO 15
city: CORSICO
postcode: 20094

contact info
Titolo: Ms.
Nome: Rosa Maria
Cognome: Domenichini
Telefono: 390245000000
Fax: 390245000000

IT (CORSICO) participant 0.00
6    INSTYTUT EKOLOGII TERENOW UPRZEMYSLOWIONYCH

 Organization address address: ULICA KOSSUTHA 6
city: KATOWICE
postcode: 40844

contact info
Titolo: Dr.
Nome: Janina
Cognome: Fudala
Telefono: +48 32 25 40 381
Fax: +48 32 2541717

PL (KATOWICE) participant 0.00
7    POLITECNICO DI MILANO

 Organization address address: PIAZZA LEONARDO DA VINCI 32
city: MILANO
postcode: 20133

contact info
Titolo: Ms.
Nome: Matilde
Cognome: Cambiaghi
Telefono: +39 02 23993827
Fax: +39 02 23993913

IT (MILANO) participant 0.00
8    STICHTING ENERGIEONDERZOEK CENTRUM NEDERLAND

 Organization address address: WESTERDUINWEG 3
city: PETTEN
postcode: 1755 LE

contact info
Titolo: Dr.
Nome: Wim
Cognome: Haije
Telefono: +31 224 564573
Fax: +31 224 568489

NL (PETTEN) participant 0.00
9    TECHNISCHE UNIVERSITEIT EINDHOVEN

 Organization address address: DEN DOLECH 2
city: EINDHOVEN
postcode: 5612 AZ

contact info
Titolo: Dr.
Nome: Laurent
Cognome: Nelissen
Telefono: +31 40 247 3000
Fax: +31 40 244 4321

NL (EINDHOVEN) participant 0.00
10    VERBIA NANO TECHNOLOGY, S.L.

 Organization address address: C/Louise Proust -parque tecnol. BOECILLO- 13
city: Boecillo

contact info
Titolo: Dr.
Nome: Roberto Recio
Cognome: Vázquez
Telefono: +34 983 54 97 90
Fax: +34 942 077 851

ES (Boecillo) participant 0.00
11    VLAAMSE INSTELLING VOOR TECHNOLOGISCH ONDERZOEK N.V.

 Organization address address: Boeretang 200
city: MOL
postcode: 2400

contact info
Titolo: Dr.
Nome: Johan
Cognome: Vangrunderbeek
Telefono: +32 14 335732
Fax: +32 14 321186

BE (MOL) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

packed    tu    sintef    feasibility    medium    power    vito    bed    building    energy    operation    demonstration    before    environmental    wp    techniques    economic    democlock    kw    igcc    selected    wheeler    clc    plan    reactor    led    plant    natural   

 Obiettivo del progetto (Objective)

DemoCLOCK aims to demonstrate the technical, economic and environmental feasibility for implementing packed bed based high temperature high pressure Chemical Looping Combustion (CLC) in large-scale power plants. A medium sized (500 kW) fixed bed reactor will be designed, build and operated integrated in an existing Integrated Gasification Combined Cycle (IGCC) power plant at Elcogas. The packed bed CLC will be used to convert gasified solid hydrocarbons (raw syngas) to energy. In this way the packed bed reactor technology opens possibilities of using multiple fuels (e.g. coal, petcoke biomass). It will deliver power production with a reduced energy penalty for CO2 avoidance in a cost effective way, as compared to currently available techniques.

The DemoCLOCK project is set up to use the experience from design, operation and optimisation of the medium scale reactor to start building a pilot plant, within 1 year after this project. DemoCLOCK consists of 7 technical work packages. All tasks are related to proof of feasibility: the medium scale demonstration of a 500kW reactor, which will take place in WP4 “Commissioning & demonstration”. In WP1 VITO, SINTEF, Eindhoven University of Technology (TU/e) and ECN fully test and characterize the two selected natural, inexpensive minerals; one of them will be selected for the demonstration unit and fabricated into a selected shape in large scale by Céramiques Techniques et Industrielles. SINTEF and TU/e will design and optimise the up-scaled reactor (WP2), after which Array Industries will build it and install it at the existing IGCC power plant (WP3 and 4).

During development and operation of the 500 kW reactor, information from WP1 to WP4 will be fed into the Technology Implementation Plan, WP5, led by Politecnico di Milano and in collaboration with Foster Wheeler Italiana, an E&C company, that will confirm the industrial and commercial feasibility of the proposed configuration. To ensure that all health, safety and environmental aspects are taken into account, while designing and building the reactor, IEIA, SINTEF and VITO perform an environmental impact and waste management assessment in WP6. In WP7, led by Foster Wheeler, all partners will work together towards the commercialisation of the technology. Before the end of the project, a business plan, comprising choices on how to exploit the IPR, will be established and the techno-economic aspects of a full-scale CLC power plant will be evaluated before the end of the project. Dissemination of the knowledge will be a natural task in WP8.

Altri progetti dello stesso programma (FP7-ENERGY)

DREAM (2013)

Distributed Renewable resources Exploitation in electric grids through Advanced heterarchical Management

Read More  

COMET (2010)

Integrated infrastructure for CO2 transport and storage in the west Mediterranean

Read More  

EFENIS (2012)

Efficient Energy Integrated Solutions for Manufacturing Industries

Read More