Coordinatore | FUNDACION TECNALIA RESEARCH & INNOVATION
Organization address
address: PARQUE TECNOLOGICO DE MIRAMON PASEO MIKELETEGI 2 contact info |
Nazionalità Coordinatore | Spain [ES] |
Totale costo | 9˙030˙853 € |
EC contributo | 6˙160˙000 € |
Programma | FP7-NMP
Specific Programme "Cooperation": Nanosciences, Nanotechnologies, Materials and new Production Technologies |
Code Call | FP7-2011-NMP-ENV-ENERGY-ICT-EeB |
Funding Scheme | CP-IP |
Anno di inizio | 2012 |
Periodo (anno-mese-giorno) | 2012-01-01 - 2015-12-31 |
# | ||||
---|---|---|---|---|
1 |
FUNDACION TECNALIA RESEARCH & INNOVATION
Organization address
address: PARQUE TECNOLOGICO DE MIRAMON PASEO MIKELETEGI 2 contact info |
ES (DONOSTIA-SAN SEBASTIAN) | coordinator | 1˙048˙479.20 |
2 |
ACCIONA INFRAESTRUCTURAS S.A.
Organization address
address: AVENIDA DE EUROPA 18 contact info |
ES (ALCOBENDAS) | participant | 644˙200.00 |
3 |
MOSTOSTAL WARSZAWA SA
Organization address
address: UL KONSTRUKTORSKA 11A contact info |
PL (WARSZAWA) | participant | 558˙100.00 |
4 |
UNIVERSITY OF ULSTER
Organization address
address: CROMORE ROAD contact info |
UK (COLERAINE) | participant | 497˙885.00 |
5 |
UNIVERSITAET STUTTGART
Organization address
address: Keplerstrasse 7 contact info |
DE (STUTTGART) | participant | 404˙040.00 |
6 |
I.CO.P. SPA
Organization address
address: VIA SILVIO PELLICO 2 contact info |
IT (BASILIANO) | participant | 366˙292.50 |
7 |
D'APPOLONIA SPA
Organization address
address: Via San Nazaro 19 contact info |
IT (GENOVA) | participant | 332˙275.84 |
8 |
CIM-MES PROJEKT SP ZOO
Organization address
address: UL. AL. JEROZOLIMSKIE 125/127 LOK 503 contact info |
PL (WARSZAWA) | participant | 324˙740.00 |
9 |
NEDERLANDSE ORGANISATIE VOOR TOEGEPAST NATUURWETENSCHAPPELIJK ONDERZOEK TNO
Organization address
address: Schoemakerstraat 97 contact info |
NL (DEN HAAG) | participant | 309˙003.90 |
10 |
GIROTZE SL
Organization address
address: POLIGONO INDUSTRIAL JUIN TXIKI 5 contact info |
ES (AZKOITIA) | participant | 308˙709.90 |
11 |
AIRLAN S.A.
Organization address
address: CALLE RIBERA DE DEUSTO 70 contact info |
ES (BILBAO VIZCAYA) | participant | 288˙720.00 |
12 |
Steinbeis Innovation gGmbH
Organization address
address: WILLI BLEICHER STRASSE 19 contact info |
DE (STUTTGART) | participant | 279˙715.62 |
13 |
SCANDINAVIAN HOMES LIMITED
Organization address
address: POLLNACLOUGH contact info |
IE (MOYCULLEN) | participant | 241˙080.00 |
14 |
MAZOWIECKA AGENCJA ENERGETYCZNA SPZOO
Organization address
address: UL ALEJE JEROZOLIMSKIE 151 AP 25 contact info |
PL (WARSZAWA) | participant | 213˙750.00 |
15 |
Fomento de San Sebastian
Organization address
address: CALLE CAMINO 2 contact info |
ES (Donostia - San Sebastian) | participant | 130˙128.00 |
16 |
FUNDACION ARTEAGA
Organization address
address: PASEO ORIAMENDI 170 contact info |
ES (SAN SEBASTIAN) | participant | 110˙600.00 |
17 |
ARCHITECTURAL SPIES OOD
Organization address
address: "PATRIARH EVTIMII STR 13-A, ap.2" contact info |
BG (VARNA) | participant | 102˙280.00 |
18 |
WATERKOTTE IBERIA SL
Organization address
address: RUA PADRE FEIJOO 1A contact info |
ES (OURENSE) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Energy use in buildings accounts for approximately 40% of EU energy consumption. Energy efficiency in new buildings is important, but existing building stock is the main target. Existing buildings, however, are characterised by particular requirements and constraints that are not present in new buildings and that requires new developments and adaptation of existing technologies. In order to fulfil the most recent EU directives, solutions for a drastic reduction in primary energy consumption are required. Space heating and domestic hot water (DHW) represent the largest part of energy use in buildings nowadays, thus solar thermal energy seems to be one of the most promising heat source. The overall objective of EINSTEIN project is the development, evaluation and demonstration of a low energy heating system based on Seasonal Thermal Energy Storage (STES) concept in combination with heat pumps for space heating and DHW requirements for existing buildings to drastically reduce energy consumption (primary energy savings up to 70% compared to conventional existing thermal systems). This goal will be achieved by: - Technological developments for STES systems adaptation for existing buildings and integration with the built environment - Development of a novel, high-efficiency, cost-effective and compact heat pump suitable for existing buildings and optimized for higher temperature heat sources such as STES systems - Development of new business and cost models which consider the entire life cycle of a building and incorporate the benefits of reduced operating costs; a decision support tool will help the planners to find the best technology to install in each particular case - Development of integrated building concept. As cost-effectiveness is one of the main aspects to be considered in building retrofitting, a methodology and a software tool for most cost-effective global energy intervention framework definition for building retrofitting will be developed'