ENDLESS RUNWAY

The Endless Runway

 Coordinatore STICHTING NATIONAAL LUCHT- EN RUIMTEVAARTLABORATORIUM 

 Organization address address: Anthony Fokkerweg 2
city: AMSTERDAM
postcode: 1059CM

contact info
Titolo: Mr.
Nome: Henk
Cognome: Hesselink
Email: send email
Telefono: 31885113445
Fax: 31885113210

 Nazionalità Coordinatore Netherlands [NL]
 Totale costo 709˙948 €
 EC contributo 562˙242 €
 Programma FP7-TRANSPORT
Specific Programme "Cooperation": Transport (including Aeronautics)
 Code Call FP7-AAT-2012-RTD-L0
 Funding Scheme CP-FP
 Anno di inizio 2012
 Periodo (anno-mese-giorno) 2012-06-01   -   2014-01-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    STICHTING NATIONAAL LUCHT- EN RUIMTEVAARTLABORATORIUM

 Organization address address: Anthony Fokkerweg 2
city: AMSTERDAM
postcode: 1059CM

contact info
Titolo: Mr.
Nome: Henk
Cognome: Hesselink
Email: send email
Telefono: 31885113445
Fax: 31885113210

NL (AMSTERDAM) coordinator 182˙249.00
2    OFFICE NATIONAL D'ETUDES ET DE RECHERCHES AEROSPATIALES

 Organization address address: Avenue de la Division Leclerc 29
city: CHATILLON
postcode: 92322

contact info
Titolo: Ms.
Nome: Maud
Cognome: Dupeyrat
Email: send email
Telefono: +33 562252928

FR (CHATILLON) participant 125˙492.00
3    DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV

 Organization address address: Linder Hoehe
city: KOELN
postcode: 51147

contact info
Titolo: Mr.
Nome: Thomas
Cognome: Richter
Email: send email
Telefono: +49 531 2952150

DE (KOELN) participant 118˙898.00
4    INSTITUTO NACIONAL DE TECNICA AEROESPACIAL

 Organization address address: Carretera de Ajalvir, Km. 4
city: TORREJON DE ARDOZ - MADRID
postcode: 28850

contact info
Titolo: Ms.
Nome: María Paz
Cognome: Blanco
Email: send email
Telefono: +34 915201690
Fax: +34 91 520 1612

ES (TORREJON DE ARDOZ - MADRID) participant 102˙353.00
5    INSTYTUT LOTNICTWA

 Organization address address: KRAKOWSKA 110/114
city: WARSZAWA
postcode: 02 256

contact info
Titolo: Prof.
Nome: Marian
Cognome: Jez
Email: send email
Telefono: +48 609 704 603

PL (WARSZAWA) participant 33˙250.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

tailwind    land    point    airport    capacity    circle    circular    aircraft    off    runways    direction    runway    anywhere    cross   

 Obiettivo del progetto (Objective)

'The airport’s capacity is determined by the capacity of its runway system. The real capacity is usually lower than the declared capacity because of weather restrictions (cross- and tailwind and visibility) and because of dependencies between runways.

Aircraft need to take off and land within defined cross- and tailwind limits. The direction of the runway determines the cross- and tailwind components. With changing wind (direction and speed), other runways in other directions need to be used.

This proposal investigates the use of a circular runway. Starting anywhere in the circle, aircraft can take off from the point where the crosswind is at minimum (or zero). Just as well, they can land at the point where they fly exactly headwind and continue their landing roll in the circle, exiting anywhere where they are closest to their gate. This will create a runway that can be used under any conditions without loss of capacity.'

Introduzione (Teaser)

The idea of a circular runway for airports could help revolutionise air travel, shortening flight times, saving fuel costs and promoting airport efficiency.

Altri progetti dello stesso programma (FP7-TRANSPORT)

DOTNAC (2010)

Development and Optimization of THz NDT on Aeronautics Composite Multi-layered Structure

Read More  

SAFETRIP (2009)

"Satellite Application For Emergency handling, Traffic alerts, Road safety and Incident Prevention"

Read More  

ENABLE (2009)

Stimulate Sustainable Freight Transport Systems with Latin American countries

Read More