Coordinatore | BIOAZUL
Organization address
address: CALLE SEVERO OCHOA 7 contact info |
Nazionalità Coordinatore | Spain [ES] |
Totale costo | 1˙421˙480 € |
EC contributo | 886˙000 € |
Programma | FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs |
Code Call | FP7-SME-2012 |
Funding Scheme | CP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-01-01 - 2014-12-31 |
# | ||||
---|---|---|---|---|
1 |
BIOAZUL
Organization address
address: CALLE SEVERO OCHOA 7 contact info |
ES (CAMPANILLAS) | coordinator | 286˙360.00 |
2 |
Biotmicrogen S.L.
Organization address
city: Armilla (Granada) contact info |
ES (Armilla (Granada)) | participant | 274˙120.00 |
3 |
ISITEC GMBH
Organization address
address: BUSSESTRASSE 27 contact info |
DE (BREMERHAVEN) | participant | 141˙360.00 |
4 |
ENCO SRL
Organization address
address: VIA MICHELANGELO SCHIPA 115 contact info |
IT (Napoli) | participant | 122˙800.00 |
5 |
Nome Ente NON disponibile
Organization address
address: Antigua carretera La Rambla S/N Apdo. correos 172 contact info |
ES ("Puente Genil, Cordoba") | participant | 61˙360.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The ALGATEC II project is a demostration activity based on the promissing results fo the FP7-SME-2008 ALGATEC project (contract n. 232331). During the ALGATEC project, both the lab and field-scale experiments proved that the system was efficient in removing the pollution load of olive mill washing water (WW) and producing water of drinking quality, that could be reused in the process. However, under the current market status in the main olive oil producing countries, the cost of this technology seemed to be quite high to be implemented in a commercial product. The innovative and easy to operate and maintain system developed, based on; a pre-treatment, a photobioreactor (PBR), and two different configurations of membrane modules, was tested using WW stored in an evaporation pond. For treating this WW, more concentrated than the fresh WW, hydraulic retention times (HRT) of 3 days were needed, and this fact increased the final price of the m3 of treated WW. The decreasing of the HRT together with other potential improvements already identified to increase the system efficiency and make it more competitive in the market, are the driven force of the proposed project. 5 European SMEs, from 3 EU countries, 4 partners of the ALGATEC project, together with a new SME especialised in market studies, will work in the optimisation of the system by implementing improvements in the pilot plant located in Spain) to increase the treatment capacity working with fresh WW and better conditions with regards to light, temperature and materials for the PBR, optimising the membrane module by replacing expensive materials, re-designing it, and improving the energy efficency. The control system for both, PBR and membranes, would be optimised to decrease, among others, the labour costs associated to the system O&M. All these measures will lead in the ALGATEC II system, more competitve in the market and that would mean the opening of new market opportunities for the participating SME'
"Development of an energy efficient domestic electric storage water heater with a >40% reduced standing heat loss, priced competitively."
Read MoreAutomated mechanical property and fatigue life assessment of composite wind turbine blades in less than 4 hours
Read More