Coordinatore | TECHNIP FRANCE SAS
Organization address
city: LA DEFENSE contact info |
Nazionalità Coordinatore | France [FR] |
Totale costo | 21˙501˙521 € |
EC contributo | 11˙934˙953 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-ENERGY-2011-2 |
Funding Scheme | CP |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-09-01 - 2015-08-31 |
# | ||||
---|---|---|---|---|
1 |
TECHNIP FRANCE SAS
Organization address
city: LA DEFENSE contact info |
FR (LA DEFENSE) | coordinator | 0.00 |
2 |
Nome Ente NON disponibile
Organization address
address: ROC BORONAT 78 contact info |
ES (BARCELONA) | participant | 0.00 |
3 |
DANMARKS TEKNISKE UNIVERSITET
Organization address
address: Anker Engelundsvej 1, Building 101A contact info |
DK (KONGENS LYNGBY) | participant | 0.00 |
4 |
DUCO LIMITED
Organization address
address: NELSON ROAD WALKER RIVERSIDE contact info |
UK (NEWCASTLE UPON TYNE) | participant | 0.00 |
5 |
EDF EN FRANCE SA
Organization address
address: ESPLANADE DU GENERAL DE GAULLE, TOUR B COEUR DEFENSE contact info |
FR (LA DEFENSE CEDEX PARIS) | participant | 0.00 |
6 |
EIFFAGE CONSTRUCTION METALLIQUE SAS
Organization address
address: RUE DE SEINE contact info |
FR (COLOMBES) | participant | 0.00 |
7 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 0.00 |
8 |
NENUPHAR SARL
Organization address
address: RUE DU FAUBOURG DE DOUAI 128 contact info |
FR (LILLE) | participant | 0.00 |
9 |
VICINAY CADENAS SOCIEDAD ANONIMA
Organization address
address: PARTICULAR DE SAGARDUY 5 contact info |
ES (BILBAO) | participant | 0.00 |
10 |
VRIJHOF ANCHORS BV
Organization address
address: RHIJNSPOOR contact info |
NL (CAPELLE AAN DEN IJSSEL) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
The INdustrialization setup of a FLoating Offshore Wind turbine (INFLOW) project participates to the development of an innovative solution for the offshore wind market. The main role of the project will be to demonstrate the cost competitiveness of the solution and to bridge the gap in between the development and industrialization phases of the technology. The development started with the validation of the new technology back in 2009, with the first 35kW onshore prototype. It will finish with the first phase of industrialization in which a 26MW commercial wind farm composed by 13 turbines will be constructed.
In brief, INFLOW objectives are: (i) to optimize the prototype developed in the previous phases and (ii) to manage all aspects required to initiate a viable industrialisation phase, in order to launch a 26 MW wind farm and to develop even larger farms in the future (150 MW by 2018). It has to be stressed that the INFLOW project will rely upon the results of the first deep offshore wind turbine prototype of the VERTIWIND project. The blades and the arm profiles of the turbine along with arm to blade and arm to mast connections will be optimized based on the test feedback of VERTIWIND. The floater concept and design will be upgraded considering more cost effective solutions for a large-scale replication. Consequently the technology during the timeframe of INFLOW will be out of the prototype phase, and due the maturity reached should be considered as pre-commercial.